Search results
(3,101 - 3,120 of 10,083)
Pages
- Title
- Episode 3 - Prophet?
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315Poster1Sp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Midterm Report F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Enhanced Oil Recovery Using Flash-Driven Steamflooding
- Creator
- Roark, Steven D.
- Date
- 2009-05-08, 1990-09-18
- Description
-
The present invention is directed to a novel steamflooding process which utilizes three specific stages of steam injection for enhanced oil...
Show moreThe present invention is directed to a novel steamflooding process which utilizes three specific stages of steam injection for enhanced oil recovery. The three stages are as follows: As steam is being injected into an oil-bearing reservoir through an injection well, the production rate of a production well located at a distance from the injection well is gradually restricted to a point that the pressure in the reservoir increases at a predetermined rate to a predetermined maximum value. After the maximum pressure has been reached, the production rate is increased to a value such that the predetermined maximum pressure value is maintained. Production at maximum pressure is continued for a length of time that will be unique for each individual reservoir. In some cases, this step of the steamflooding process of the invention may be omitted entirely. In the third stage of the steamflooding process of the invention, production rates at the producing well are increased gradually to allow the pressure to decrease down from the maximum pressure value to the original pressure value at the producing well. The rate of pressure reduction will be unique for each reservoir. After completing stage three, the three stages can be repeated or the steamflood may be terminated as considered desirable.
Sponsorship: IIT Research Institute
United States Patent
Show less
- Title
- X-Ray Diffraction Method
- Creator
- Ekstein, Hans, Siegel, Stanley
- Date
- 1950-06-13
- Description
-
Sponsorship: Armour Research Foundation of Illinois Institute of Technology
United States Patent
- Title
- Hybrid Energy Storage System
- Creator
- Cao, Jian, Emadi, Ali
- Date
- 2014-10-16, 2014-10-14
- Description
-
A hybrid energy storage system for supplying power to an application with a fluctuating load profile, such as, for example, electric vehicles,...
Show moreA hybrid energy storage system for supplying power to an application with a fluctuating load profile, such as, for example, electric vehicles, hybrid electric vehicles, plug-in hybrid electric vehicles, wind energy harvesting equipment and solar energy harvesting equipment. The hybrid energy storage system includes an ultra-capacitor electrically connected to a DC bus and a power source electrically connected to the DC bus via a controlled switch. The hybrid energy storage system further including a DC/DC converter connected between the power source and the ultra-capacitor, the DC/DC converter boosting a voltage of the power source to charge the ultra-capacitor. The DC/DC converter is preferably controlled to maintain a voltage of the ultra-capacitor at a higher value than the voltage of the power source.
Sponsorship: Illinois Institute of Technology
United States Patent
Show less
- Title
- Zero Energy Lab (Semester Unknown) IPRO 337: ZeroEnergyLabIPRO337Brochure2Su09
- Creator
- Cheng, Lidens, Gillmeister, Lauren, Gupta, Vaibhav, Hamill, Nancy, Karns, Nicole, Padwal, Neha, Patel, Priyanka, Vega, Mayra, Walker, Jason, Walker, Rachel, Yee, Michael
- Date
- 2009, 2009-07
- Description
-
The ultimate goal of the Zero Energy Lab IPRO is to design a universal format for occupying laboratories that utilize the minimal amount of...
Show moreThe ultimate goal of the Zero Energy Lab IPRO is to design a universal format for occupying laboratories that utilize the minimal amount of energy. For the Zero Energy Lab to be usable at all hours of the day, proper lighting is a necessity. The installation of an appropriately designed lighting system, which will be both cost and energy efficient, will be a high priority in the overall scheme. A small section of the overall space will be the prototype of the design, which will in turn allow for the further development of lighting implementation.
Deliverables
Show less
- Title
- Integration of Process Improvement (sequence unknown), IPRO 304 - Deliverables: IPRO 304 IPRO Day Presentation F09
- Creator
- Bauer, Jessie, Bergeron, Tony, Campen, Matt, Gruchalski, Erik, Choi, Tae Ki, Marx, Ryan, Murti, Chaitanya, Robbins, Brian, Sohal, Atinder Pal, Stenson, Amanda, Taboada, Alejandro, Zhang, Bingjian
- Date
- 2009-12
- Description
-
A. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress...
Show moreA. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress and shape of metal and need to be replaced immediately to avoid further damage to the machine and the steel to be milled.
Sponsorship: A. Finkl and Sona
Deliverables for IPRO 304: Integration of Process Improvements for the fall 2009 semester.
Show less
- Title
- Planning for Human Implantation of a Cortical Visual Prosthesis (sequence unknown), IPRO 334 - Deliverables: IPRO 334 Brochure F09
- Creator
- Bern, David, Chen, Shanyl, Deroo, Mary, Gorski, David, Kelly, Thomas, Leasenby, Alex, Li, Zhi, Pyrkh, Hanna, Subhani, Maham, Taneja, Aanchal
- Date
- 2009-12
- Description
-
The Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human...
Show moreThe Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human visual cortex, coordinated temporal-spatial image information can be artificially communicated to the human visual cortex in the form of electrical currents, acting as a sensory substitute for normal vision.
Sponsorship: IIT Laboratory of Neural Prosthetic Research
Deliverables for IPRO 334: Planning for Human Implantation of a Cortical Visual Prosthesis for the fall 2009 semester
Show less
- Title
- Applying Rapid Prototyping Techniques to Production Tooling (semester?), IPRO 312: Rapid Prototyping Techniques IPRO 312 Midterm Report F06
- Creator
- Ranttila, Annie, Fu, Chun Yiu, Hussain, Shan I., Hicks, Ken, Dave, Udit, Manjrekar, Sourabh, Nosse, Daniel, Atta, Muhammad, Amine, Rachid, Craig, Seun, Abdullahi, Abdulkamal, Taylor, Lashawna
- Date
- 2006-12, 2006-12
- Description
-
This IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period...
Show moreThis IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period for the caster manufacturing company Colson Associates. As the project advanced, the team realized that the real objective of this IPRO was to: ‘Investigate techniques for rapidly and effectively manufacturing casters to satisfy “rush orders” for special casters.’
Deliverables for IPRO 312: Applying Rapid Prototyping Techniques to Production Tooling for the Fall 2006 semester
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Brochure2 F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Zero Energy Lab AND Designing the IPRO Team Collaboratory Space (sequence unknown), IPRO 337 - Project Plan: IPRO 337 Project Plan F09
- Creator
- Akutagawa, Abraham, Babnigg, David, Chiu, Mark, Dosky, Benton, Hansen, Kai, Kawa, Konrad, Mensah, Teddy, Park, Lillian, Parkes, Brian, Patel, Jay, Reinecke, Jonathan, Shive, Clayton, Vice, Evan, Zappala, Theresa
- Date
- 2009-12
- Description
-
The goal of this IPRO is to continue the research and application of previous research into ‘Zero Energy’ techniques, while simultaneously...
Show moreThe goal of this IPRO is to continue the research and application of previous research into ‘Zero Energy’ techniques, while simultaneously evaluating an old CTA building on the IIT campus for its feasibility both as a collaboratory IPRO space and as a ‘Zero Energy’ building.
Project plan for IPRO 337: Zero Energy Lab AND Designing the IPRO Team Collaboratory Space for the fall 2009 semester.
Show less
- Title
- Zinda (semester?), IPRO 352: Zinda IPRO 352 Project Plan F06
- Creator
- Ahmed, Waseem, Bhatia, Ankush, Buddell, Kenneth, Casiraghi, Juan, Mandolia, Rishu, Mikosz, Natalie, Trocke, John, Yamashita, Megumi, Zaprzal, Robert
- Date
- 2006-12, 2006-12
- Description
-
The mission of the EnPro 352 team is to provide high-quality custom designed, custom-fitted and reasonably priced clothing to our customers....
Show moreThe mission of the EnPro 352 team is to provide high-quality custom designed, custom-fitted and reasonably priced clothing to our customers. The current goal for EnPro 352–Fall 2006 is to create a professional business plan, and conduct product tests.
Deliverables for IPRO 352: Zinda for the Fall 2006 semester
Show less
- Title
- Transducer System and Method
- Creator
- Wiegand, David E.
- Date
- 4/23/2009, 1965-01-05
- Description
-
Sponsorship: IIT Research Institute
United States Patent
- Title
- An Online Teachers Community for Chicago Public Schools (Semester Unknown) IPRO 320: An Online Teachers Community for Chicago Public Schools IPRO 320 Ethics Sp08
- Creator
- Abbasi, Rawan, Enverga, John, Goldstein, Linda, Jafarey, Usman, Seung Kim, Min, Kruger, Evan, Mishra, Lory, Moses, Justin, Pasari, Shruti, Smith, Anthony, Zelenskiy, Aleksandr
- Date
- 2008, 2008-05
- Description
-
Our objective for this semester is to have a prototype of a web community to be used by teachers. The community will consist of 100 registered...
Show moreOur objective for this semester is to have a prototype of a web community to be used by teachers. The community will consist of 100 registered teachers and feature a front page, a forum, and a wiki with 50 complete articles. A round of usability testing including 25 teachers will be conducted; the feedback will be used to gain knowledge and to add features in the future.
Deliverables
Show less
- Title
- Development of a Portable Method for Preparing Previously Frozen Red Blood Cells for transfusion (semester?), IPRO 304C: Portable Frozen Red Blood Cell IPRO 304C Project Plan Sp05
- Creator
- Baetz, Eric, Johnson, Derek, Resurreccion, Karen, Tullman, Jennifer, Bir, Sumar, Hmadouch, Ahlam, Dexter, Brogan, Olmos, Oscar, Ravuri, Ventata, Awosika, Clara, Palmer, David, Sutalo, Joseph
- Date
- 2005-05, 2005-05
- Description
-
The objective of this project is to develop a system for washing multiple units of red blood cells (RBCs) to be used in an emergency situation...
Show moreThe objective of this project is to develop a system for washing multiple units of red blood cells (RBCs) to be used in an emergency situation. The major aspects of this system to be controlled will be: portability, minimum wash solution, minimum bio-waste, automation, and compliance with the standards necessary for transfusion. The goal of this project is to develop a theoretical design for a working system by the end of this semester.
Deliverables for IPRO 304C: Development of a Portable Method for Preparing Previously Frozen Red Blood Cells for transfusion for the Spring 2005 semester
Show less
- Title
- New Product Evaluation and Improvement (Semester Unknown) IPRO 341: NewProductEvaluationandImprovementIPRO341MidTermPresentationSu09
- Creator
- Assaliyski, Marin, Attard, Ryan, Basiourski, Vitali, Dorn, Lawrence, Feldman, Laurie, Grabowski, Luke, Guerrero, Jose, Rusz, Vlad, Tchobanova, Natacha, Zellarchaffers, Priscilla
- Date
- 2009, 2009-07
- Description
-
The team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed....
Show moreThe team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed. Additionally, the team’s purpose was extended to develop a next‐generation tool storage cabinet and also to identify potential new markets for the company to pursue. This will require a truly inter‐professional team to analyze everything from the engineering of the tool storage cabinet to market research of the current and potential markets.
Deliverables
Show less
- Title
- Green Building (Semester Unknown) IPRO 335: GreenArtStudioIPRO335FinalReportSp09
- Creator
- Antol, Marcin, Balkany, Grahm, Block, Shawn, Campbell, Brittanie, Hart, Carl, Hodgson, Ashley, Korbus, Tracy, Limpinyakul, Jutarop, Lis, Tom, Llakmani, Anton, Macklin, Brandon, Mcguire, Luke, Modi, Nishant, Nguyen, Linh, Nigamatzyanov, Tagir, Palomo, Kaye, Ramey, Ronald, Saracino, Anthony, Socher, Daniel, Tan, Sophia, Williams, Jeremy
- Date
- 2009, 2009-05
- Description
-
The teams’ task is to demonstrate the interdisciplinary cooperative requirements as needed to fulfill a mission of sustainability. This IPRO...
Show moreThe teams’ task is to demonstrate the interdisciplinary cooperative requirements as needed to fulfill a mission of sustainability. This IPRO simulates an actual building development within the Chicago City limits. Specifically a green building development, which means that there is an increase in efficiency of the resources used while the building is constructed, operative, and removed.
Deliverables
Show less
- Title
- The Effects of Green Technology on Electrical Contractors (Semester Unknown) IPRO 338
- Creator
- Georgieva, Ludmila, Haurberg, Soren, Horwath, Joshua, Im, Hyeon, Johnson, Ross, La Luce, Mitchell, Lee, Jae, Lee, Yongdoo, Malawski, Frank, Manke, Alexandra, Mitchell, Jason, Odunaiya, Edumaregbemiro, Patel, Kunal, Pyciak, Mike, Stanard, Steve, Wong, Wing Hong, Tomal, Dan
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a template for a website to host a user-friendly online database of green technologies information for...
Show moreThe purpose of this IPRO is to develop a template for a website to host a user-friendly online database of green technologies information for the Electrical Contractors’ Association of the City of Chicago. This website will involve providing data on green electrical products with cut sheets, pricing and distributor information, return on investment projections, and LEED certification facts. The use of this website should help create a well informed transition from industry standard electrical products, to green alternative products, as well as cut down on miscommunication between architects and electrical contractors.
Sponsorship: Electrical Contractors’ Association of the City of Chicago
Deliverables
Show less
- Title
- Assisting Blind and Visually Impaired Swimmers (semester?), IPRO 310: Blind Swimmers IPRO 310 Brochure S07
- Creator
- Bauer, Elizabeth, Tovalin, Ivan, Goldstein, Palika, Dela Cruz, Miguel, Mokhuach, Svetlana, Stanford, Jeffrey, Patel, Axita, Ezell, Garrett, Koshy, Abin
- Date
- 2007-07, 2007-07
- Description
-
IPRO 310’s objectives are to continue the designing and building process of devices that help visually impaired swimmers. The IPRO 310 team...
Show moreIPRO 310’s objectives are to continue the designing and building process of devices that help visually impaired swimmers. The IPRO 310 team intends to design, create and test a sonar device that actively aids a visually impaired swimmer. The team also plans on redesigning, building and testing a swimming lane tapper that passively aids visually impaired swimmers. In addition, the 310 IPRO team has a business and marketing team that will be surveying members of the visually impaired community to assess their need and acceptance of the proposed devices.
Deliverables for IPRO 310: Assisting Blind and Visually Impaired Swimmers for the Summer 2007 semester
Show less