Search results
(2,881 - 2,900 of 10,078)
Pages
- Title
- Delta Hook Technology (Semester Unknown) IPRO 358: DeltaHookTechEnPRO358FinalPresentationF09
- Creator
- Egland, Erik, Howard, Nathan, Kim, Yunjung, Lee, Sewon, Lichaj, Andrew, Madan, Nikhil, Ng, Man, Springfield, Keegan, Yamin, Izmir, Zaidi, Shaad
- Date
- 2009, 2009-12
- Description
-
During the fall 2009 semester, IPRO 358 plans to continue the development and creation of mock-ups for the Delta Hook Technology (DHT) as well...
Show moreDuring the fall 2009 semester, IPRO 358 plans to continue the development and creation of mock-ups for the Delta Hook Technology (DHT) as well as lay the foundation for a business model for Sparrowhawk, LLC, an early stage company. Sparrowhawk has investigated the concept for an innovative fishing hook that is not currently on the market or ready to be launched. The members of IPRO 358 will work together to design mock-ups of the DHT, test the mock-ups, and determine measures that can be taken to improve the DHT. Subsequent mock-ups will continue to improve based on results of the product testing. Simultaneously, we will be working towards better understanding the consumer’s behavior. This will aid in the determination of the probable distribution channels and the strategies to best use them.
Deliverables
Show less
- Title
- Creating a Contemporary and Dynamic Science Fair Bank for Chicago Public Schools (Semester Unknown) IPRO 330: Creating a Contemporary and Dynamic Science Fair Bank for Chicago Public Schools IPRO 330 Midterm Report Sp08
- Creator
- Baldwin, Leah, Campbell, Keith, Diaz, Rocio, Gim, Yewon, Pak, Angela, Parrillo, Anthony, Steward, Shane, Tate, Joshua, Ten Eyck, Patrick, Totlebe, Aimee
- Date
- 2008, 2008-05
- Description
-
IPRO 330 has one clear and main purpose: to increase high school student interest in Science and Mathematics in Chicago Public Schools. This...
Show moreIPRO 330 has one clear and main purpose: to increase high school student interest in Science and Mathematics in Chicago Public Schools. This is a very lofty and broad goal, so IPRO 330 has chosen to use the Chicago Public School Science Fair program as a vehicle to achieve this purpose. IPRO 330 is a continuing IPRO, meaning that we have a foundation and a base of work that has already been accomplished. As a result, one of the project goals of this team will be to obtain in-depth feedback from professionals within IIT, from Chicago Public Schools, and certainly from other professional education venues as well. Specifically, we will be looking to obtain feedback from the three most involved sources in high school students’ lives: students, teachers, and parents. This may be the most vital part of our project, because we want to make sure that our projects and guides are of high quality and high interest to high school students. IPRO 330 has an existing bank of Science Fair projects and guides which are located on the website sciencefair.math.iit.edu. In an effort to make our website more effective and more appealing, we will have team goals to create more Science Fair projects, and guides which will target areas that Chicago Public High School Students typically have trouble addressing, such as data analysis. We feel like the guides are a way to really implement more mathematics into the Science Fair program as a whole. In addition, there will be a group of students in our IPRO focused on improving the website and implementing new projects. IPRO 330 will address these objectives by first having all members, including faculty advisors, attend and judge a Chicago Public School Science Fair. This will allow everyone working on this project to get a better sense of what we are working on, make some contacts with teachers and Science Fair Coordinators, and even get feedback from students who used the website as a resource for their project. After this initial phase, the group will break up into three teams, an infrastructure team, a communication team, and a project and guides team. In these sub teams, IPRO 330 will be able to more effectively deal with more specific issues that arise
Deliverables
Show less
- Title
- The study of the formation of chromates
- Creator
- Kaplon, H., Schiffman, H. M.
- Date
- 2009, 1921
- Publisher
- Armour Institute of Technology
- Description
-
http://www.archive.org/details/studyofformation00kapl
Thesis (B.S.)--Armour Institute of Technology; Bibliography: leaf 30
- Title
- Charles A. Smith Charter School for Urban Agriculture and the Culinary Arts
- Creator
- Spicer, Ben
- Date
- 2010-07-30
- Title
- Crop to Cup Coffee: Building Communities through Coffee (Semester 2) IPRO 333: BuildingComunitiesThroughCoffeeIPRO333BrochreF10
- Creator
- Feldman, Laurie, Waterloo, Becca, Hurst, Trey, Chatterjee, Dia, Houser, Clay, Esko, Emily, Campbell, Laurel, Schmid, Miriam, Erie, Mike, Tam, Phil, Patel, Vishal, Swingler, Mark, Bloom, Ryan, Abbott, Matt
- Date
- 2010, 2010-12
- Description
-
The mission of IPRO 333 is to assist the Crop to Cup Company with the design and building of an enclosure for a temporary storage facility...
Show moreThe mission of IPRO 333 is to assist the Crop to Cup Company with the design and building of an enclosure for a temporary storage facility within the vicinity of their largest producing farming zone for robusta coffee in the Mbale region of Uganda. The sponsor, along with the team, has decided that the best method for addressing the local and global needs of the farmers is to present the research and design personally. Therefore, IPRO 333 will be fundraising to help finance the forthcoming trip to Uganda to present to the farming communities.
Sponsorship: Crop to Cup
Deliverables
Show less
- Title
- Synthetic Biology: Engineering a Novel Organism (semester?), IPRO 302: Synthetic Biology IPRO 302 Abstract F06
- Creator
- Black, Robert, Cappello, William, Dunee, Brian, Fernandez, Louis, Hedden, Mark, Heller, Matthew, Mahmud, Saba, Ross, Trillian, Ruszczak, Christopher, Sajjad, Sunny, Sandulescu, Cornia, Sobczck, Karol, Ward, Christopher, Witthans, Ryan
- Date
- 2006-12, 2006-12
- Description
-
The specific plan for our IPRO is construct a synthetic biological circuit, that is both novel, aesthetically pleasing and independent of the...
Show moreThe specific plan for our IPRO is construct a synthetic biological circuit, that is both novel, aesthetically pleasing and independent of the host organism. This is a first step toward implementing entirely synthetic organisms that can be designed to a specification. The target we have chosen is a synchronized biological oscillator, implemented in a vertebrate organism, the zebrafish. To produce an organism requires a wide variety of skills and tasks. Accordingly we have organized into subteams, each responsible for progress in some area, with an administrative sub team overseeing all the events.
Deliverables for IPRO 302: Synthetic Biology: Engineering a Novel Organism for the Fall 2006 semester
Show less
- Title
- Crop to Truck (Semester Unknown) EnPRO 353
- Creator
- Azab, Naguib, Brenner, Kevin, Choe, Mihee, Haznar, Daria, Horchin, Marina, Kamer, Kevin, Klockowski, Wesley, Mceneff, Aaran, Min, Hee-jong, Muchna, Joseph, Palau, Mariana, Pierce, Nicholas, Sanchez, Nicolas, Velazquez, Andrea, Zistakis, Nikola
- Date
- 2010, 2010-12
- Description
-
Crop to Cup’s business mantra is “Pride to crop, quality, and cup”. IPRO 353, Crop to Truck, will embody this statement through investigation...
Show moreCrop to Cup’s business mantra is “Pride to crop, quality, and cup”. IPRO 353, Crop to Truck, will embody this statement through investigation into mobile coffee baristas. Our design and business models will present a world-conscious, attractive truck space that improves customer experience and ease of access to the best quality, responsibly sourced coffee available. We will complete the cycle that Crop to Cup has set forward in a sustainable manner that benefits consumer, producer, and barista alike.
Sponsorship: Crop to Cup Jacob Elster
Deliverables
Show less
- Title
- Sustainable Village (semester?), IPRO 301
- Creator
- Higashi, Andrew, Larson, Jef, Robinson, Bezaleel, Thomas, Tony, Clair, Joseph, Ogbebor, Evans, Ninoyu, Anna, Staats, Michael, Golucki, Philip, Savona, Elena, Pimputkar, Siddha, Kiszynski, Kris, Sathyan, Anand, Kizilel, Riza
- Date
- 2005-05, 2005-05
- Description
-
The team working on this project has set itself three major objectives. Firstly it strives to create a comprehensive and in-depth database...
Show moreThe team working on this project has set itself three major objectives. Firstly it strives to create a comprehensive and in-depth database containing valuable information concerning sustainability. This database should be user-friendly and intuitively presented so people who are interested in sustainability are quickly educated with the key points and have easy access to relevant and high quality references and further readings. The second objective of this project essentially consists of creating a roadmap and master plan on how to make Illinois Institute of Technology’s (IIT) Main Campus sustainable. This will be done by auditing and then benchmarking IIT to other similar projects. This roadmap and master plan will be developed with the vision that once implemented IIT will be a leader in sustainability and encourage many others to follow our track. Lastly the third objective is to create a house of the future. The house of the future has many objectives for itself. It should incorporate current design possibilities and make use of various available technologies to be sustainable and energy efficient among other things. This house should attract the public and educate them how easily sustainability can be achieved using current technology and knowledge at a competitive price.
Deliverables for IPRO 301: Sustainable Village for the spring 2005 semester
Show less
- Title
- Intermodal Container Facility Innovations for the Chicago Area with focus on Kankakee (Semester Unknown) IPRO 307): IntermodalContainerFacilityIPRO307FinalPresentationSp11
- Creator
- Alvarez, Raquel, Bakos, Panagiotis, Guan, Sarah, Jun, Jaeha, Kim, Miry, Kutryn, Anna, Mcdermott, Cheryl, Perez, Lorenzo, Piediscalzi, Yoshio, Seryapin, Igor, Skvorc, Erin, Soltesz, Stephanie, Steponavicius, Nerijus, Theisen, Philip, Woods, Bryan, You, Jay, Zgourdah, Mourad, Pirkle, Matthew
- Date
- 2011, 2011-05
- Description
-
IPRO 307 is following the path of its predecessors in order to help improve the shipping transportations and facilities in Kankakee County, IL...
Show moreIPRO 307 is following the path of its predecessors in order to help improve the shipping transportations and facilities in Kankakee County, IL. While there have been other IPRO teams that have contributed to the modernization of the intermodal system at MI-Jack Shipping Company, our sponsor is now looking for us to further their research in this field. They would also like us to further the research in high speed intermodal along with a viaduct enhancement system. One of our tasks is to select a location in Kankakee County to place the intermodal system. We have decided to break this into two locations with one being in-city and the other being out-of-city. Kankakee County has been selected because two major rail lines pass through it. There is also a highway that runs through the center of it. Therefore, it is an ideal 2 location for an intermodal yard. Also, there is a wind farm being built in Kankakee, so we will be able to save energy by thinking green. In our selection process for a location, we may need to relocate some people. Therefore, our plan is to have affordable housing at our out-of-city location. We will design this affordable housing along with the warehouses and storage facilities, which go along with the design of an intermodal yard.
Deliverables
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 Project Plan Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Catalyst for Economic Development, Washington Park, Chicago, IL
- Creator
- Burkhart, Joel
- Date
- 2010-07-29
- Title
- Pervasive Training (Semester Unknown) IPRO 317: PervasiveTrainingIPRO317FinalReportSp11
- Creator
- Bailey, Preston, Bennett, Noelle, Callan, Mark, Cho, Andrew, Dasari, Sravya, Hassan, Ismail, Lutgendorf, Michael, Noorts, George, Orawiec, Paul, Peprah, Nana, Reddy, Swathi, Fatima Rizvi, Syeda, Singh, Archana
- Date
- 2011, 2011-05
- Description
-
The team for IPRO 317 is tasked with working on developing a pervasive training program. This program will integrate various psychological and...
Show moreThe team for IPRO 317 is tasked with working on developing a pervasive training program. This program will integrate various psychological and technological applications. As such the team working on this project has split into 2 groups to work on these respective applications. The idea of pervasive training addresses a dire need in the field of corporate training. This concept allows companies to put their employees through training by making them self-aware. This method of training also enables employers to train their employees with minimal disruption to productivity. Our intention is to implement this training through the employee’s hand held devices. Each employee would select a group of peer to fill out an assessment, the combination of the peer assessments, an assessment performed by the employee’s supervisor and one by the employee themselves would constitute the evaluation of employee. The employee would then receive a series of periodic e-mails to their mobile device that they would then need to respond to in order to complete this training. After a pre-designated amount of time for this training the employee will fill out a new survey and receive their results. A significant motivator for this training is that it is purely voluntary and allows the employee to receive these evaluations without their employer knowing any of the results aside from completion status. From our research team we hope to derive a set of themes by which to rate the employee as well as survey questions. What this will lead to is a group of teachable moments. These moments will be reminders for the employee based upon the results of their surveys. Once this system is derived the research team will begin a search for appropriate test organizations for us to run our trials on. While this is being done our development team will build a website to distribute and compile these surveys. This site will also send out our teachable moments and maintain this data. All of this will be done on a desktop computer that will be converted into a server. Once testing begins, this team will be responsible for assisting the test users in the survey and teaching process. These team members will provide support for any issues the users will have as well as for maintaining the website integrity during this process. Ultimately once this initial phase is done our hope is that this product will move immediately into production. Our hope is that with the success of our project this will become a new standard in the training of employees. With this being the case employers will be able to train more employees with less loss of production. Our goal is for this to be used with every employee and not just those in management.
Deliverables
Show less
- Title
- PB Our Space- A Parsons Brinckerhoff Project (Summer 2011) IPRO 320: PB OUR SPACE– A Parsons Brinckerhoff Project IPRO320 Summer2011 Final Report
- Creator
- Bell, Vince, Kavicky, Matthew, Khan, Taimoor, Kohli-lynch, Ciaran, Leevathana, Nick, Mcbride, Phillip, Nguyen, Hao, Vargas, Abigail, Wilkinson, David
- Date
- 2011, 2011-07
- Description
-
Parsons Brinckerhoff (PB) is an engineering, construction, technical, and management services firm that provides diverse solutions to private...
Show moreParsons Brinckerhoff (PB) is an engineering, construction, technical, and management services firm that provides diverse solutions to private industrial customers worldwide, as well as to federal, regional, and local government agencies. Gathering requirements and feedback from the stakeholders for each project is imperative to meet the client’s needs. This process may be challenging due to the stakeholders’ diversity, location and time constraints. IPRO 320 was commissioned to design an application to interact with stakeholders for all PB projects. The stakeholders will be able to access information and take surveys, as well as post comments and other forms of multimedia to voice their opinions related to specific PB projects. During the summer 2011 semester, the IPRO developed concepts for an operational mobile application and web browser called PB OUR SPACE. To begin, this project required a vast amount of research and collaboration with Parsons Brinckerhoff. In order to make the most of a limited amount of time, the semester was divided into two parts. The first half of the semester was used to gather information about PB to build a better understanding of what would be required for the application. For the second half of the semester, we utilized that information to create a storyboard showing how the application will be used and developed. The functionality of the mobile application and browser is detailed in Appendix 3: Storyboard. The future IPRO team will be able to continue and expand this work by creating a working prototype of the storyboard concepts. All our work this semester has been compiled and filed to help make a smooth transition between semesters. This information contains the progress made thus far as well as recommendations for development of the application. By providing this information, the developed storyboard and proposed conclusions will make a solid framework for the development of the product, PB OUR SPACE (stakeholders’ perspectives about contextual elements).
Sponsorship: Parsons Brinckerhoff
Project Plan for IPRO 320: PB Our Space- A Parsons Brinckerhoff Project for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (RCP) (Semester Unknown) IPRO 347: RCPIPRO347ProjectPlanSu10
- Creator
- Charles, Joe, Evenhouse, Josh, Park, Patrick, Mccluskey, John, Duarte, Julia, Mulcahy, Liam, Gaisina, Vlada
- Date
- 2010, 2010-07
- Description
-
The IPRO 347 team intends to seize the opportunity given by Robbins Community Power (RCP) to improve the efficiency of the power plant. RCP...
Show moreThe IPRO 347 team intends to seize the opportunity given by Robbins Community Power (RCP) to improve the efficiency of the power plant. RCP plans to convert the facility from its original role as an incinerator into a wood biomass electricity plant. Working with RCP, the team will look at thermodynamic values to determine how to best utilize the excess heat generated from the boiler that currently radiates out the cooling towers. Additionally, the team will research and discuss possible solutions to be implemented on the 22 acre site. The intricacies that arise from the nontraditional nature of our plan require we split into two groups. One sub-team will look into exactly where the waste heat exists and the values of viable energy available in the form of steam or hot water. This team will seek interdisciplinary advice as part of the energy analysis. The second, but most influential, sub-team will predominantly be researching feasible outlets for the recovered energy. Some solutions they will pursue include supplying nearby greenhouses with CO2, providing on-site and local heat, and increasing the efficiency of the plant through drying processes. IPRO 347-Summer 2010 Project
Sponsorship: Robbins Community Power (RCP)
Deliverables
Show less
- Title
- Process to Allocate Channels in a Sectorized and Tiered Cellular Network
- Creator
- Frieder, Ophir, Nguyen, Vincent Ahndzung, Wan, Peng-jen
- Date
- 2012-06-05, 2012-06-05
- Description
-
The invention disclosed is a process to allocate channels in a sectorized and tiered cellular network. A system of allocating cellular...
Show moreThe invention disclosed is a process to allocate channels in a sectorized and tiered cellular network. A system of allocating cellular frequencies (channels) to the sectors among the outer tier of cells within a tile is disclosed which maximizes channel set usage within the tile while minimizing co-channel interference between cells. Any unused, or remaining, frequencies for the outer tier of that cell may then be allocated to an inner tier of the cell that has not had a channel allocated thereto. No additional infrastructure or maintenance set-up is required under this technique for allocating the channel to the additional transceiver and a very high degree of channel utilization is achieved.
Sponsorship: Illinois Institute of Technology
United States Patent
Primary US Patent Classification 455/450
US Patent Classification 455/447
US Patent Classification 455/63.4
US Patent Classification 455/63.1
US Patent Classification 455/422.1
US Patent Classification 455/446
US Patent Classification 455/67.11
US Patent Classification 455/509
US Patent Classification 455/524
International Patent Classification H04W72/00
Show less
- Title
- Implantable Drug Delivery Apparatus
- Creator
- Arzbaecher, Robert C.
- Date
- 2009-05-11, 1997-03-04
- Description
-
An implantable drug delivery apparatus including a housing that has a housing chamber. An outer deformable body having a reserve chamber is...
Show moreAn implantable drug delivery apparatus including a housing that has a housing chamber. An outer deformable body having a reserve chamber is mounted within the housing chamber. An inner deformable body having a dispensing chamber is mounted within the reserve chamber. A dispensing valve is actuated to an open position to allow a fluidic drug to flow from the dispensing chamber, through the dispensing valve and through a catheter into a body of a patient. The fluidic drug is discharged from the dispensing chamber at a dispensing mass flowrate which is greater than a refilling mass flowrate of the fluidic drug passing from the reserve chamber to the dispensing chamber, when the dispensing valve is in an open position. When the dispensing valve is in a closed position, the fluidic drug is prevented from discharging from the dispensing chamber while a recharging amount of the fluidic drug is capable of flowing from the reserve chamber to the dispensing chamber, until the dispensing chamber is at least partially filled. The outer deformable body is normally forced or urged in a direction or manner that tends to reduce a volume of the reserve chamber.
Sponsorship: Illinois institute of Technology
United States Patent
Show less
- Title
- Heat Driven Refrigeration System (Semester 2 of Unknown), IPRO 357
- Creator
- Alworth, Tom, Frost, Alec, Vogel, Stefan, Callow, Alex, Kim, Keon, Lee, Donghoon, Ahmadia, Aron, Keen, Andrew, Medrano, Anel, Nortes, Leo, Taher, Tanim
- Date
- 2005-01, 2004-12
- Description
-
The solution will take the form of a novel system based on a refrigeration cycle driven by heat. The cycle will be built around a "pressure...
Show moreThe solution will take the form of a novel system based on a refrigeration cycle driven by heat. The cycle will be built around a "pressure exchanger" consisting of a piston, along with solenoid valves controlled by a microprocessor. Heat will most likely be obtained through the combustion of biomass such as plant by-products and animal wastes, but will be flexible enough to allow for more conventional fuel types such as kerosene and coal.
Sponsorship: ASHRAE, NCIIA
Deliverables
Show less
- Title
- PEM Fuel Cell Technology (Semester Unknown) IPRO 318: PEMFuelCellTechnologyIPRO318ProjectPlanSp09
- Creator
- Adebole, Kolade, Aguirre, Marisol, Baker, Kathleen, Booher, Steven, Corson, Elizabeth, Dorr, Elena, Khan, Anam, Kloppenborg, Ellen, Kunkel, Emily, Marks, Matthew, Massoud, Hussein, Matezic, Samira, Mocny, William, Nicholson, Bethany, Shpuntova, Galina, Smith, Adam, Swillum, Bryce, Willett, Joshua, Zellarchaffer, Priscilla, Zhao, Yin, Zwibelman, Hannah
- Date
- 2009, 2009-05
- Description
-
1. Evaluate the feasibility of PEM fuel cells in commercial application, including military and defense, automotive, aerospace, and other...
Show more1. Evaluate the feasibility of PEM fuel cells in commercial application, including military and defense, automotive, aerospace, and other specialties 2. Investigate industrial and commercial technicalities of PEM fuel cells and study methods of improving the robustness of catalysts and reducing fuel impurities 3. Compare and contrast the performance and cost of fuel cell and internal combustion engines 4. Design and incorporate a PEM fuel cell system into commercial application and perform a cost and benefit analysis utilizing engineering design principles
Deliverables
Show less
- Title
- Power Measurement for Road Bicycles: Towards a Universal Solution (Semester Unknown) IPRO 324
- Creator
- Aguilar, Sergio, Becker, Patrick, Gonzalez, Daniel, Kaminski, Bryan, Knopp, Nathan, Jankhot, Crystal, Marcellis, Brandon, Poli, David, Ruidera, Ryan, Tsosie, Henrietta, Yoo, Jaewon, Ziomek, Arkadiusz
- Date
- 2008, 2008-12
- Description
-
We would like to develop a system that measures the applied torque at a bicycle crank set. In contrast to current solutions, we want to be...
Show moreWe would like to develop a system that measures the applied torque at a bicycle crank set. In contrast to current solutions, we want to be able to retrofit our system to existing crank sets, obviating the need to abandon parts that the bicyclist already owns. In principle, according to preliminary tests performed at the MMAE department, this can be done using sets of quite inexpensive strain gauges. However, being able to get accurate torque measurements will require some advanced processing of signals from the strain gauges. These signals can then be transmitted wirelessly to a bicycle computer like the Edge 705 that the global positioning system corporation Garmin released this spring. There is a defined wireless protocol, called ANT+Sport, which has been developed specifically for the purpose of transmitting exercise data, such as power output or heart rate, to small computers. Chipsets and development kits for this protocol are also available commercially. Therefore, our task will be to find an optimal configuration of strain gauges that will be attached to the crank set, and to develop an algorithm to process the strain gauge data in order to isolate a signal that is proportional to the applied torque. This signal will then be transmitted to the bicycle computer for display and storage
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Brochure Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
