- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Final Report F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Poster F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Final Presentation F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Brochure F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Mid Term F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Ethics F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Final Report F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Brochure F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Poster F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO%20313%20Project%20Plan%20F09_redacted
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Project Plan Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Final Report Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 MidTerm Report Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Ethics Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Final Presentation Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Brochure Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less