Search results
(3,521 - 3,540 of 10,085)
Pages
- Title
- 2,4,6-Trinitrobenzoate Ester-Addition Compound Indicator
- Creator
- Laskowski, Donald E.
- Date
- 1957-10-08
- Description
-
Sponsorship: Armour Research Foundation of Illinois Institute of Technology
United States Patent
- Title
- Integrated Electric Motor Differential for Hybrid Electric Vehicles
- Creator
- Rodriguez, Fernando, Emadi, Ali
- Date
- 2012-03-20, 2012-02-14
- Description
-
An electro-mechanical drive train for a hybrid electric vehicle. The electro-mechanical drive train includes a housing and a pinion shaft...
Show moreAn electro-mechanical drive train for a hybrid electric vehicle. The electro-mechanical drive train includes a housing and a pinion shaft having a first end disposed within the housing and a second end in communication with a combustion engine. A differential is disposed within the housing and in combination with the end of the pinion shaft. An electric motor is also disposed within the housing and in actuating combination with the pinion shaft.
Sponsorship: Illinois Institute of Technology
United States Patent
Show less
- Title
- Zero CommunIITy: A Prototype for a Zero-Energy Residential Development (sequence unknown), IPRO 323 - Deliverables: IPRO 323 IPRO Day Presentation F09
- Creator
- Bohac, Adam, Brady, David, Bueno, Juan, Coughlin, Daniel, Depalma, Lowell, Gonzalez, Juan, Gross, Josh, Hernandez, Carlos, Iversen, Jennifer, Mckinley, Keanen, Moceri, Michael, Modi, Nishant, Wisniewski, Anthony, Zacharias, Bryan
- Date
- 2009-12
- Description
-
The teams purpose is to seek a union between living comfortably and living sustainably. To design for a future Chicago‐area community, which...
Show moreThe teams purpose is to seek a union between living comfortably and living sustainably. To design for a future Chicago‐area community, which first minimizes its energy consumption and then uses the most sustainable methods to fulfill the remaining needs of the inhabitants. Ideally we will design a model community which will challenge conventions within the fields of design, planning, engineering, and everyday living. This community will also serve as an example to Chicago‐area municipalities about the benefits of sustainable planning, design, and living.
Sponsorship: Consultant from A. Epstein & Sons; Jeremy Poling
Deliverables for IPRO 323:Zero CommunIITy: A Prototype for a Zero-Energy Residential Development for the fall 2009 semester
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307AbstractSp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Green Leaf Community (Semester Unknown) IPRO 357: GreenleafCommunity IPRO357FinalPresentationF10
- Creator
- Beck, Steve, Paschal, William, Snyder, Mark, Rueda, Jorge, Hegde, Namrata, Semenova, Svetlana, Xiao, Yao, Anglin, Christopher, Qaisar, Samir, Sung Shin, Woo, Yun, Joonggeun, Prokop, Samantha
- Date
- 2010, 2010-12
- Description
-
Our purpose is to study the design of sustainable residential housing model designed by the Inter-professional group in the fall of 2009 and...
Show moreOur purpose is to study the design of sustainable residential housing model designed by the Inter-professional group in the fall of 2009 and determine the construction costs for the model. This along with the market analysis will set a baseline price for the average buyer of this home. Our goal is to redesign this model with the current economic market in mind and make this model of sustainable design marketable and economically feasible with use of more efficient designing and systems.
Deliverables
Show less
- Title
- alcometer: AlcometreEnPRO351ProjectPlanF09
- Creator
- Abdullah, Khairul, Adeola, Olaoluwa, Apampa, Kunle, Arrowood, Renee, Braband, Jim, Entler, Jason, Geelen, Jeremy, Sung Hwang, Kyu, Liu, Xingshuo, Morales, Eduardo
- Date
- 2009, 2009-12
- Description
-
The purpose of IPRO 351 is to research and develop a device that will be a non- invasive blood alcohol concentration (BAC) meter. Our mission...
Show moreThe purpose of IPRO 351 is to research and develop a device that will be a non- invasive blood alcohol concentration (BAC) meter. Our mission is to provide a safe and accurate BAC device that will help reduce the amount of people who drive while impaired. IPRO 351 has a vision of having a non-invasive biometric blood alcohol ignition interlock device (BBAIID) that can be installed on any vehicle.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown) IPRO 311: Campus BrandingSustainability Image IPRO 311 Final Report Sp08
- Creator
- Bird, Steve, Choi, Migun, Crowley, Brian, Elg, Brianna, Henry, Steve, Horwath, Josh, Mindock, Rae, Nadler, Anne, Navarro, Jon, Perry, Nick, Romanelli, Brian
- Date
- 2008, 2008-05
- Description
-
The IPRO 311 Team’s overall objective is to create a conceptual design and branding of IIT as an eco-friendly campus, promoting sustainability...
Show moreThe IPRO 311 Team’s overall objective is to create a conceptual design and branding of IIT as an eco-friendly campus, promoting sustainability to students, faculty and visitors. IPRO 311 is sponsored by IIT Marketing and Communication Department which seeks to portray a message of the university’s accomplishments in the area of sustainability and future capabilities. Furthermore, this project is driven by the interests of two IIT trustees with an interest to enhance the visibility of the IIT Main Campus from the I-94 expressway and other challenging vantage points (US Cellular Field, Sears Tower, McCormick Place, 2016 Olympics venues, etc.) Disney Imagineering is project partner participating with the Team through brainstorming discussion assisting the Team in building the IIT Brand. Initially, the focus of the IPRO was the development of signage that could represent sustainability and be situated at a prominent location on campus visible to the public. After several class discussions, the vision of the IRPO broadened, to develop an overall campus sustainable conceptual design, incorporating signage as one of the elements. Successful completion of the goals presented here will require each participant to gain useful experience and knowledge regarding teamwork, inter-professional skills and specifically sustainable concepts. There are several interrelated objectives: (1) Build IIT brand awareness and campus visibility in ways that are aesthetically pleasing, exciting and memorable. (2) Create an eco-friendly, self-sustained project that promotes general awareness of activities within the university among students, staff, faculty and the community. (3) Play a leadership role in supporting Mayor Daley's vision for creating a ultra-green Chicago by 2020. (4) Create an IIT campus sustainability plan for future IPROs to build upon.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: SolidFuelFromBiomassForCogenerationIPRO349MidTermPresentationSp09
- Creator
- Brazzale, Ross, Bryne, Richard, Cheever, James, Clark, Michael, Dorr, Elena, Gibbs, Jeremy, Lazicki, Katherine, Prabha Kumar, Abhishek, Vandegrift, Bertha, Williams, Robert, Worthon, Terrika, Yi Yeap, Xin
- Date
- 2009, 2009-05
- Description
-
Renewable energy is one of the most important and widely researched topics today. It is classically defined as any form of energy that comes...
Show moreRenewable energy is one of the most important and widely researched topics today. It is classically defined as any form of energy that comes from renewable sources and, for all practical purposes, cannot be depleted. This may include solar, wind, or geothermal power, as well as biomass or biofuels. When considering biomass, or any living or recently dead biological material, the chemical energy of the molecules is generally collected through the process of combustion.
Deliverables
Show less
- Title
- Techno-Business Study of Water Pump Motor Technologies (Semester Unknown) IPRO 348: Techno-BusinessStudyofWaterPumpMotorTechnologiesIPRO348FinalReportF10_redacted
- Creator
- Cachero, Eunice, Colmenares, Andre, Dias, Diego, Hannink, Veronica, Jackson, Lisa, Lee, Sunho, Matariyeh, Khalid, Oberg, Jarrett, Patel, Tejash
- Date
- 2010, 2010-12
- Description
-
IPRO 348 is a team of students working together for the goal of assisting Pentair with selecting a new motor to use in their water pumps that...
Show moreIPRO 348 is a team of students working together for the goal of assisting Pentair with selecting a new motor to use in their water pumps that is more economically and environmentally friendly through research and testing of potential new motor technologies.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Health Physics Computer Training Simulation (Semester Unknown) IPRO 329: Health Physics Training Simulation IPRO 329 Project Plan Sp08
- Creator
- Akram, Asad, Hammer, Natalie, Huish, Joel, Iwata, Ippei, Kaska, Michal, Lee, Heajin, Lloyd, Lee, Rebacz, Jeff, Runge, James, Rutherford, Dan, Sharma, Shubhi, Zaturenskiy, Mikhail
- Date
- 2008, 2008-05
- Description
-
Refine the training simulation created last semester into a more robust, complete product. o Improve the simulation’s graphics into a 3D...
Show more Refine the training simulation created last semester into a more robust, complete product. o Improve the simulation’s graphics into a 3D more real life model. o Update the navigation systems to make them more intuitive. o Revise the game scenario to make the game more plausible. o Update the in-game tools to current tools used in industry. o Refine the question database algorithm to make the questioning easier. o Provide additional question/answer entries to the game’s database. Put together a final product including a final packaged game.
Deliverables
Show less
- Title
- Developing Web Based Applications (Semester Unknown) IPRO 308: DevelopingWeb-basedApplicationsIPRO308BorchureSp10
- Creator
- Blakey, Luke, Carmichael, Jake, Choi, Hyemin, Gopal, Shashank, Lademan, Anthony, Matusiewicz, Rick, Mutyaba, Kevin, Najarian, Christopher, O’connor, Ryan, Patel, Nirali, Sahagun, Jaime, Savage, Christopher, Svaldi, Jared, Vidutis, Mantas
- Date
- 2010, 2010-05
- Description
-
Our purpose is to make the NIHL website a web-based scheduling and scoring applications that can support their annual operations.
Sponsorship:...
Show moreOur purpose is to make the NIHL website a web-based scheduling and scoring applications that can support their annual operations.
Sponsorship: Northern Illinois Hockey League (NIHL)
Deliverables
Show less
- Title
- Audio Quality & Energy Efficiency for Mobile Devices and Intercoms (Semester Unknown) IPRO 344
- Creator
- Barnett, Alex, Gullikson, Kevin, Raza, Mohammad, Aigner, Jeff, Su, Yihan, Craig, Titilayo, Kuo, Steve, Chiles, Jeff, Walker, Alex
- Date
- 2009, 2009-05
- Description
-
IPRO 344 began as an investigation into the applications of Class D amplifiers for low-power and high-quality audio devices. This semester’s...
Show moreIPRO 344 began as an investigation into the applications of Class D amplifiers for low-power and high-quality audio devices. This semester’s IPRO will focus on integrating the Class D amplifier into a drive-through order system. In addition to the Class D amplifier, this semester’s team will be investigating high-fidelity microphones, microphone preamplifiers, and speaker mounting.
Deliverables
Show less
- Title
- New Applications for Virtual Reality Training (semester?), IPRO 316
- Creator
- Jeong, Ahreum, Doolittle, Erik, Mead, Erik, Roe, Ian, Stanford, Jeffrey, Kim, Jeongshik, Knopp, Kyle, Malanowski, Mark, Cantoni, Nick, Steward, Shane
- Date
- 2007-12, 2007-12
- Description
-
We have quite a few objectives for this IPRO. Our first objective is to research into both industrial and mass market applications of the...
Show moreWe have quite a few objectives for this IPRO. Our first objective is to research into both industrial and mass market applications of the Product Animations technology. After this first objective, we take 2 paths. The first leads to determining a screening criterion to select the best industrial prospects. We then plan to quantify the value propositions for the prospects selected from objective 2. When this is finished, we will create a deliverable simulation example, and finally write down any and all recommendations for future work with this IPRO. The other path leads to researching the idea or design of an ASP website. After this has been implemented, we want to use a PAI example of a milkshake machine, and show this on the ASP at IPRO day.
Deliverables for IPRO 316: New Applications for Virtual Reality Training for the Fall 2007 semester
Show less
- Title
- Magnetic Recording System
- Creator
- Camras, Marvin
- Date
- 2009-05-04, 1976-03-23
- Description
-
A longitudinal scan transducing apparatus for use with a television receiver comprising a magnetic transducer head having transverse...
Show moreA longitudinal scan transducing apparatus for use with a television receiver comprising a magnetic transducer head having transverse conductors for supplying high frequency bias, high frequency bias synchronized with the horizontal line rate, head shifting and tape reversal features, and television set adapter circuitry for supplying a wide-band video signal and for stabilizing reproduced sync signals.
Sponsorship: IIT Research Institute
United States Patent
Show less
- Title
- BUOY (Semester Unknown) IPRO 310
- Creator
- Baar, Coleman, Freund, Ryan, Kruse, Kevin, Li, Li, Ma, Zhi, Murdock-barriball, Meghan, Ng, Man, Rehman, Mohammed, Reilly, Jeffrey, Turrentine, Lorne, Yew, Hsuen, Zhang, Bingjian
- Date
- 2009, 2009-05
- Description
-
The problem posed with blind and visually impaired (BVI) swimmers is one of safety and independence. BVI individuals need to be able to...
Show moreThe problem posed with blind and visually impaired (BVI) swimmers is one of safety and independence. BVI individuals need to be able to orientate themselves in a swimming pool and avoid obstructions like lane-lines, pool walls and other swimmers for a safe experience. Additionally, it is important to BVI swimmers to maintain their independence and maintain a low profile during this experience. The Buoy team will focus on the design, testing and implementation of assistive technology focused on a pool environment with continuous input and feedback from the BVI community. A current passive device created in previous IPROs will be field-tested in a BVI pool for the semester in order to identify failure-modes of the device and collect real-world BVI user feedback to discover areas for improvement. Additionally, two groups have been organized to assess the use of invisible-fence and ultrasound technology in the creation of new assistive technology. Surveys and interviews will be conducted with the BVI community on a continuous basis to ensure the Buoy team is meeting the needs of the market.
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknown) IPRO 315: DesignOfALargeScaleStructureIPRO315FinalPresentationF09
- Creator
- Aguilar-wedge, Carmen, Animashaun, Oladipo, Baur, Alex, Cullen, Michael, Hadi, Shuaib, Hedge, Namrata, Kuo, Steve, Lee, Christopher, Lee, Yongdoo, Rybaltowski, Karol, Scully, Dawveed, Shen, Jie-hua, Yousef, Shadi
- Date
- 2009, 2009-12
- Description
-
Located in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify...
Show moreLocated in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify and re analyze a structure created by pervious designers, and select any new materials for construction. In creating the hotel students will be responsible for the structural analysis of columns, beams, foundation, steel, and concrete design required to insure all serviceability requirements. The students will be required to follow the 2006 International Building Code, and secure the safety of all possible occupants. Management, leadership, ethics, and teamwork will be an integral part of building a large scale structure as students learn to work together on a “real life” project.
Deliverables
Show less
- Title
- Inflatable Greenhouse (semester?), IPRO 344
- Creator
- Cervantes, Heidi, Ferraro, Christie, Lucid, Shannon, Teefey, Aaron, Woods, Nathaniel, Bains, Jasmeet, Ching, Neal, Langman, Michael, Mccrory, Reuben, Valdez, Oscar, Wright Iii, James, Bilderback, Matthew, Choi, David, Larson, Jeffrey, Meyer, Chad, Wang, Xiang, Carroll, Daniel, Crandell, Daniel, Lim, Eungjum, Nedrud, Joshua, Wojcik, Michael
- Date
- 2006-05, 2006-05
- Description
-
The purpose of the Inflatable Greenhouse IPRO was to design an air supported structure that was cheaper than the current greenhouse solution....
Show moreThe purpose of the Inflatable Greenhouse IPRO was to design an air supported structure that was cheaper than the current greenhouse solution. The structural support of current greenhouses creates shadows that prevent an even sunlight exposure for the plants. The other issues we investigated were the cost, size, thermal control, and pest control of current greenhouse designs. The majority of the cost for a traditional greenhouse goes towards the structural support therefore an air supported structure should be significantly cheaper. The basic greenhouse design is oriented towards human occupants and is subsequently quite large. If the greenhouse was instead designed to house the plants already in the ground, just for the months that they needed shelter to grow, the cut back in size would also greatly affect the cost. We also looked into the thermal qualities of greenhouses. The very nature of a greenhouse absorbs and traps the light and heat of the sun. Without a cooling system a greenhouse can overheat and harm the plants within it. The other problem we found with current greenhouses was the pest control solution. Most greenhouses use strong chemicals that require special training for use and safety. Even the “organic” solutions use natural chemicals in concentrations considered toxic. Our goal was to design a greenhouse that would address each of these issues with a cheap and practical solution.
Deliverables for IPRO 334: Inflatable Greenhouse for the Spring 2006 semester
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: InnovatingProcessImprovementsInManufacturingOperationsIPRO304FinalPresentationSp09
- Creator
- Abhay, Anandha, Bergeron, Anthony, Catalina, Christopher, Entler, Jason, Estrada, Maximillian, Huish, Joel, Patel, Vishal, Quach, Vien, Taggart, Jay, Sunghwan, Yeo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co.
Deliverables
Show less
- Title
- Renovation of Alumni Memorial Hall (semester?), IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Abstract Sp07
- Creator
- Ford, Brad, Kim, Youjoung, Oh, Hyunjoo, Reid, Rebekah, Woods, Nataniel, Babel, Alek, Dow, Dan, Kazi, Syed, Helland, Matt, Szajokowski, Jared, Tambah, Prince, Gibbs, Matt, Edwards, Tamakia, Uecke, Jeffrey, Uecke, Steve, Wegrzyn, Celeste, Atanassova, Tania
- Date
- 2007-05, 2007-05
- Description
-
IPRO 335’s objective is to focus on starting the renovation and design of Alumni Memorial Hall used by the Civil and Architectural Engineering...
Show moreIPRO 335’s objective is to focus on starting the renovation and design of Alumni Memorial Hall used by the Civil and Architectural Engineering Department. This is the first semester this IPRO has been offered. Our main goal and objective is to research and analyze the current building in place, and begin a schematic design for Alumni Memorial Hall including the structural, mechanical, and electrical systems. We are setting the groundwork for this IPRO to be furthered in future semesters.
Deliverables for IPRO 335: Renovation of Alumni Memorial Hall for the Spring 2007 semester
Show less