- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Final Report F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Brochure F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO 313 Poster F09
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables: IPRO%20313%20Project%20Plan%20F09_redacted
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Project Plan Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Final Report Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 MidTerm Report Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Ethics Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Final Presentation Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302: CO2 Mitigation A Techno-Economic Assessment IPRO 302 Brochure Sp08
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (Semester Unknown) IPRO 302
- Creator
- Vrana, George, Babjak, Alan, Lee, Dahye, Mcwethy, Courtney, Costanzo, Francis, Gonzalez, Daniel, Hwang, Taeho, Bart, Jeff, Baldwin, Timothy, Marheine., Joshua, Schillaci, Michael, Cheever, James, Guilfoyle, Jennifer, Ogata, Kenneth, Kit Ong, Wai, Konwar, Riju, Clark, Michael, Zajkowska, Urszula, Lazicki, Katherine, Pyciak, Mark, Kuhan Sivanyanam, Sithambara, Yaker, Farouk, Im, Sanghyuk
- Date
- 2008, 2008-05
- Description
-
Perform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of...
Show morePerform an in-depth analysis of all aspects of implementing the selected CO2 mitigation technology from the sponsor by researching methods of sequestration and designing CO2 removal equipment with the assistance of MATLAB models of the power plant and Hysys models of the CO2 removal equipment. Provide a thorough economic analysis in order to assess the impact on power generation cost. This will include determination of capital costs for the operation and construction of CO2 removal and sequestering equipment to the existing power plant.
Sponsorship: Sargent & Lundy