- Growing Water: 31st Street Eco-Boulevard and IIT Pavilion Prototype (Semester Unknown) IPRO 322: Growing Water 31st St. Eco-Boulevard and IIT Pavilion Prototype IPRO 322 Abstract Sp08
- Creator
- De Vita, Niels, Kreitzer, Michael, Oh, Hyunjoo, Vassi, Anna, Boder, Matthew, Johnson, Drew, Fong, Patrick, Ramey, Ronald, Stopic, Milena, Irish, Sean, De Marco, Juan, Urdiales, Miguel, Blackketter, Joshua, Konwar, Riju, Kuzmicki, Kamil
- Date
- 2008, 2008-05
- Description
-
• To create publicity and awareness about the state of Chicago water and the need to start taking steps to preserving and restoring it. • To...
Show more• To create publicity and awareness about the state of Chicago water and the need to start taking steps to preserving and restoring it. • To create a catalog of sustainable methodologies to be implemented in an urban planning strategy throughout the city of Chicago. • Enhance the impact of the Eco-Boulevards in the community. • Collaborate with the city of Chicago and the project team regarding possible implementation of ecological strategies regarding water. • To research and share methods, techniques, practices, equipment, biology, etc. of functional living machines and make it available knowledge. • To establish a social program for the living machine Pavilions to create public interaction points with the ecological function of the living machine.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Emotion (Semester Unknown) IPRO 354: EmotionIPRO354PosterSp09
- Creator
- Roy, Avelo, Suda, Edward, Segre, Alessandro, Luan, Haojie, Graziano, John, Votipka, Daniel, Estrada, Zachary, Patel, Nirali, Morath, Johannes, Laurence, Alexis, Ludden, Shanon, Horn, Whitney
- Date
- 2009, 2009-05
- Description
-
eMotion creates and offers devices that connect those who are physically separated but emotionally connected in a simple and safe manner.
Deliv...
Show moreeMotion creates and offers devices that connect those who are physically separated but emotionally connected in a simple and safe manner.
Deliverables
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (Semester Unknown) IPRO 303
- Creator
- Dodds, Jacob, Erogbogbo, Samad, Fleming, Rachel, Fujimoto, Haruko, Hazariwala, Nirav, Kim, Jihyung, Lee, Sangwook, Mcanally, Arthur, Simons, Ray
- Date
- 2008, 2008-05
- Description
-
IPRO 303 is working on the user interface for SmartSignal Corporation’s software which predicts equipment failures in coal fired power plants....
Show moreIPRO 303 is working on the user interface for SmartSignal Corporation’s software which predicts equipment failures in coal fired power plants. We are now in the third stage of the project. We are to deliver the user interface of the software based on the studies done by two previous semesters. SmartSignal suggested that we also consider specific elements of the software such as the clear presentation of developing fault information, and the efficient communication system between users. An appropriate UI will utilize SmartSignal’s predictive analysis software to provide an efficient and clear means for power plant personnel to: · Predict or identify equipment faults · Understand the predicted faults · Prioritize the disposition of the predicted faults or highlight urgent or important faults · Reduce the need for plant personnel to have many years of experience or “institutional knowledge” The ultimate goal of this project is to introduce an innovative approach to the user interface which SmartSignal can use for predicting equipment failures in coal fire power plants. To realize this, we set these objectives. · Research and collect information relative to the User Interfaces [UI] from the first hand users of the software while examining the study done by the previous IPRO303. · Create the Requirements Document for the UI in light of the concerns expressed by SmartSignal and the results of research. · Generate several possible UIs based upon the Requirements Document stated above. · Select one of the Several UI for development of details and revise it based upon the input from SmartSignal. · Add details and finalize the design of the selected UI.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Implementing The Plant: Chicago’s First Vertical Farm (Semester Unknown) IPRO 336: ImplementingThePlantChicagoIPRO336ProjectPlanSp11
- Creator
- Speroff, Philip, Skaar, Angela, Schmidt, Michael, Plunkett, Joel, Mocny, William, Lockom, Frank, Handzel, Katarzyna, Speroff, Philip, Schmidt, Michael, Lockom, Frank, Xiao, Yao, Viramontes, Carlos, Sansone, Nic, Millham, Joseph, Chavez, Laurel, Palau, Mariana, Ostasz, Raluca, Liu, Andrew, Kenney, Kaycee, Hallak, Joseph, Bugnar, Ioana
- Date
- 2011, 2011-05
- Description
-
There are several types of framing that can be used on a greenhouse. The frames are made of wood, galvanized steel, or aluminum. Build-it...
Show moreThere are several types of framing that can be used on a greenhouse. The frames are made of wood, galvanized steel, or aluminum. Build-it-yourself greenhouse plans are usually for structures with wood or metal pipe frames. Plastic pipe materials generally are inadequate to meet snow and wind load requirements. Frames can be covered with glass, rigid fiberglass, rigid double-wall plastics, or plastic film. All have advantages and disadvantages. Each of these materials should be considered--it pays to shop around for ideas.
Deliverables
Show less
- Title
- MECHANICAL PROPERTIES AND SINTERING MECHANISMS OF POWDER METALLURGY TI6AL4V
- Creator
- Xu, Xiaoyan
- Date
- 2013, 2013-05
- Description
-
Titanium has been identified as one of the key materials with a high strength to weight ratio that can reduce the weight of components and...
Show moreTitanium has been identified as one of the key materials with a high strength to weight ratio that can reduce the weight of components and thereby reduce energy consumption. Single press and sinter as a powder metallurgy technique has the potential to provide cost effective components. Armstrong prealloyed Ti6Al4V, HDH prealloyed Ti6Al4V, HDH blended Ti6Al4V powder and their mixtures were pressed and sintered at different conditions. The chemistry, mechanical and microstructural properties have been investigated to establish optimum processing parameters. Sintered parts were sent to Oshkosh Truck to test and compared with aluminum and steel parts. The Titanium and Ti6Al4V parts were successfully applied and tested. All the specimens passed the load test without failures. The sintering mechanisms of Armstrong prealloyed Ti6Al4V powder were investigated. At relative sintered densities of 75% to 90% (around 900°C), surface diffusion cooperate with grain boundary diffusion, which leads to densification of the powder compact. Around 900°C, grain boundary diffusion controls the sintering process. At 1000°C, boundary diffusion made little contribution to the densification of the Ti6Al4V powder compact. Above 900°C and below 91% sintered density, boundary diffusion controls sintering. Lattice diffusion dominates the densification process at higher temperatures (1100°C~1300°C). The sintering of master alloy blended Ti6Al4V powder has been investigated in order to elucidate the mechanism of sintering. Both blended powder compacts and diffusion couples were investigated using backscattered imaging and energy xvi dispersive analysis to determine the phases present and diffusion path on sintering at 1000ºC and 1100ºC. It is shown that transient liquid phase sintering does not occur and the reason for the rapid sintering of this material is due to enhanced diffusion kinetics resulting from a combination of the concentration gradient and stress induced by a phase transformation in the ternary system.
PH.D in Materials Science and Engineering, May 2013
Show less
- Title
- Coal Combustion Residual Solutions (Spring 2011) IPRO 302: CCR SolutionsIPRO302EthicsSp11
- Creator
- Firnbach, Nicole, Agosto, Jennifer, Burnett, Shana, Enriquez, Sheena, Herman, Robert, Kipp, Daniel, Parker, Chad, Port, Graeme, Rafalko, Susan, Sanchez, Joseph, Gardner, Andrew
- Date
- 2011, 2011-05
- Description
-
Team Vision/Mission The purpose of the IPRO 302 team, sponsored by Sargent & Lundy, is to evaluate the environmental and cost impacts of...
Show moreTeam Vision/Mission The purpose of the IPRO 302 team, sponsored by Sargent & Lundy, is to evaluate the environmental and cost impacts of closing an ash pond at an active power plant, as well as consider alternative beneficial uses for coal combustion residuals (CCR) and wastewater that can contribute to a sustainable solution. Objectives ● Current status of regulations for CCR and wastewater ● Alternatives for disposing of ash ● A recommended alternative for disposal or reuse of the bottom ash ● A recommended alternative for treatment and disposal of wastewater ● Cost impact of closure of an existing unlined ash pond
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Neutron Discharge Tube
- Creator
- Reiffel, Leonard
- Date
- 1961-05-09
- Description
-
Sponsorship: Armour Research Foundation of Illinois Institute of Technology
United States Patent
- Title
- Design of a Large Scale Structure (Semester Unknown) IPRO 315: DesignOfALargeScaleStructureIPRO315BrochureF09
- Creator
- Aguilar-wedge, Carmen, Animashaun, Oladipo, Baur, Alex, Cullen, Michael, Hadi, Shuaib, Hedge, Namrata, Kuo, Steve, Lee, Christopher, Lee, Yongdoo, Rybaltowski, Karol, Scully, Dawveed, Shen, Jie-hua, Yousef, Shadi
- Date
- 2009, 2009-12
- Description
-
Located in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify...
Show moreLocated in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify and re analyze a structure created by pervious designers, and select any new materials for construction. In creating the hotel students will be responsible for the structural analysis of columns, beams, foundation, steel, and concrete design required to insure all serviceability requirements. The students will be required to follow the 2006 International Building Code, and secure the safety of all possible occupants. Management, leadership, ethics, and teamwork will be an integral part of building a large scale structure as students learn to work together on a “real life” project.
Deliverables
Show less
- Title
- IIT Saves Water (Summer 2011) IPRO 346: IIT Saves Water IPRO346 Summer 2011 Project Plan
- Creator
- Li, Cheng, Ruth, Anthony, Romo-ortiz, Esther, Kenward, Joshua, Patel, Mansi, Natarajan, Narayan, Rajagopalan, Raksha, Tapia, Rene
- Date
- 2011, 2011-07
- Description
-
The purpose of this project is the advancement in knowledge of, and applied practical solutions to the challenges of sustainability in regards...
Show moreThe purpose of this project is the advancement in knowledge of, and applied practical solutions to the challenges of sustainability in regards to a very specialized area of water conservation. The harvesting of air conditioner condensate could potentially lead to the conservation of a great deal of both water and money. Pentair, a company specialized in providing water solutions, is interested in the technology to harvest the condensate from A/C in buildings, and is our sponsor. We aimed to create public awareness surrounding the potential non-potable use of air conditioner condensate through demonstration and presentation. The IPRO Team of Summer 2011 will advance the prior work by focusing upon building public awareness and working to change public policy. The Team will utilize social media promotional strategies/messages and implementation. The Team will also identify the practical and political barriers to main stream harvesting of condensate and develop action plans to overcome the barriers. The two activities of the Team will be to build public enthusiasm for condensate harvesting via social media and secondly to summarize all IPRO condensate efforts into a presentation with collateral materials and share it with organizations that have outreach missions of sustainability and conservation.
Sponsorship: Pentair, Inc
Project Plan for IPRO 346: IIT Saves Water for the Summer 2011 semester
Show less
- Title
- WEB-BASED CONTEMPORANEOUS DELAY ANALYSIS
- Creator
- Pektas, Murat
- Date
- 2011-11-22, 2011-12
- Description
-
The construction industry is fragmented due to the many stakeholders and the diverse phases involved in a construction project. On time,...
Show moreThe construction industry is fragmented due to the many stakeholders and the diverse phases involved in a construction project. On time, within budget, with required quality are essentials of a successful project. However, most construction projects are faced with delays, which obstruct success. To recover the damage caused by delays, both the delays and the parties responsible for them should be identified accurately. Daily window delay analysis outperforms other delay analysis methods, but it requires intensive day-by-day information. The information flow among the project stakeholders must be smooth and speedy at all stages of the production process not only to achieve the basic project objectives but also to let project stakeholders recognize the delays and the parties responsible for them in order to recover time and cost. The Internet is attractive for transferring information promptly and economically with no regional or temporal borders. To merge the power of the Internet and to ease time consuming delay analysis, a web-based application is proposed to analyze delays effectively and contemporaneously, to reduce time and cost, and to provide historical data. The application considers the day-by-day variation in critical path(s) during the project life cycle. The application gives accurate and repeatable results for apportioning project delays, accelerations and decelerations among involved parties. The manual effort required by traditional systems is minimized with the application’s simple, easy to use, yet effective and highly automated features. Moreover, the database structure of the application is designed to store and manage more than one project at a time to let its users calculate the overall performance of the company including all projects, and to calculate average durations for activities that can come up in future projects.
M.S. in Civil Engineering, December 2011
Show less
- Title
- A METHODOLOGY FOR MAJOR BUS ROUTE RESCHEDULING TO IMPROVE TRANSIT PERFORMANCE
- Creator
- Lu, Xi
- Date
- 2012-08-01, 2012-07
- Description
-
In a period of growing transit operating deficits, increasing attention and concern is being directed at both the decreasing levels of...
Show moreIn a period of growing transit operating deficits, increasing attention and concern is being directed at both the decreasing levels of productivity of transit systems in general and the broad differences in measured service performance compiled for various transit systems. The purpose of this study is an assist public transit managers by providing them with a mathematical technique to analyze the efficiency with which serviced is produced and the effectiveness with which it is consumed. By providing the analysis model which not requires an extensive amount of data, the operator can have tool for decision-making of profit and market growth. Thus, transit managers will be able to access the performance of the agency and areas where improvements can be realistically achieved. Using the urban operation of the Chicago Transit Authority, a transit performance model is developed to analysis efficiency and effectiveness of the city's bus system. As the system exists, there are 144 bus routes start and end, frequency of dispatching buses and ridership changes from Weekdays and Weekend, peak hour and off-peak hour. In many of these routes, vehicles are used inefficiently and ineffectively, only a few passengers carried in some routes in off-peak hour, yet in other routes through the Central Business District (CBD) area, there are always not enough buses in peak hour. Also, some routes cannot provide enough on-time arrival service and some special group like elderly and handicapped cannot receive enough service in certain area. The goal of case research is to determine to understand the transit performance of Chicago Transit Authority and to select the optimal improvement projects to maximize the performance in term of economy and social equity.
M.S. in Civil Engineering, July 2012
Show less
- Title
- Develping a Prototype Display for the Prenatal-to-Newborn Blood Flow System (semester?), IPRO 341: Cardiovascular display for Pre and Post Natal IPRO 341 IPRO Day Presentation Sp05
- Creator
- Lin, Grace, Barta, Jennifer, Shrivastava, Archita, Vasu, Kedari, Sloan, Michael, Pitroda, Sean, Zaboli, David, Vankawala, Anand, Wright, Michael, Tuthill, Chris, Thakore, Suruchi, George, Ryan, Perez, Armando
- Date
- 2005-05, 2005-05
- Description
-
The purpose of the IPRO this semester was to further develop the prototype of a cardiovascular display for the prenatal to newborn blood flow...
Show moreThe purpose of the IPRO this semester was to further develop the prototype of a cardiovascular display for the prenatal to newborn blood flow system for the Museum of Science and Industry. The museum’s main goal was to have a display that would emphasize the changes in pressure within the body before, during, and after birth. To accomplish this, the group decided the goal of the semester was to recreate a visual presentation, which could 5 ultimately be on a touch screen monitor, and bench-top model as the display. In addition to the creation of the prototype, it was then brought to the museum for testing.
Sponsorship: Museum of Science and Industry, Chicago
Deliverables for IPRO 341: Develping a Prototype Display for the Prenatal-to-Newborn Blood Flow System for the Spring 2005 semester
Show less
- Title
- New Product Evaluation and Improvement (Semester Unknown) IPRO 341: NewProductEvaluationandImprovementIPRO341BrochureSu09
- Creator
- Assaliyski, Marin, Attard, Ryan, Basiourski, Vitali, Dorn, Lawrence, Feldman, Laurie, Grabowski, Luke, Guerrero, Jose, Rusz, Vlad, Tchobanova, Natacha, Zellarchaffers, Priscilla
- Date
- 2009, 2009-07
- Description
-
The team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed....
Show moreThe team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed. Additionally, the team’s purpose was extended to develop a next‐generation tool storage cabinet and also to identify potential new markets for the company to pursue. This will require a truly inter‐professional team to analyze everything from the engineering of the tool storage cabinet to market research of the current and potential markets.
Deliverables
Show less
- Title
- Enhanced Vision Systems (Semester Unknown) EnPRO355: EnhancedVisionSystemsEnPRO355Brochure2Sp09
- Creator
- Beemsterboer, Michael, Bistriceanu, Bogdan, Chavalit, Bank, Hanley, Richard, Hoppe, David, Rybakova, Julia, Sticha, Charles, Williamson, Nicholas
- Date
- 2009, 2009-05
- Description
-
Due to errors on construction sites it is not uncommon for underground utilities to be struck accidentally while digging. Aside from the...
Show moreDue to errors on construction sites it is not uncommon for underground utilities to be struck accidentally while digging. Aside from the obvious monetary damages a significant number of people have died as a result of these types of accidents. The purpose of this EnPRO is to aid workers when they are in danger of striking an underground utility by successfully developing a software product that displays subterranean utilities to the workers. The end result being that the number of accidents decreases, saving both lives and money.
Deliverables
Show less
- Title
- Global Warming and Community Outreach (Semester Unknown) IPRO 331: Global Warming and Community Outreach IPRO 331 Midterm Presentation Sp08
- Creator
- Amin, Rohan, Chandrasekar, Suraj, Dickson, Chandrasekar, Iyengar, Ravi, Juilfs, Amber, Kennedy, Thomas, Manke, Lexie, Mikosz, Natalie, Parikh, Harshill, Shaaban, Yosra
- Date
- 2008, 2008-05
- Description
-
Evaluate and incorporate previous presentation feedback into new methods of addressing the scientific aspect of global warming. This...
Show more Evaluate and incorporate previous presentation feedback into new methods of addressing the scientific aspect of global warming. This primarily includes subdividing the issue into four major aspects that contribute to this effect. Present material to a larger and more diverse audiences, including schools, community centers, libraries, non-profit organizations, and other possibilities. Focus on solid, scientific data from credible sources that define why and how global warming is occurring, rather than discussing the politics and economics that surround the issue. Create a platform for this IPRO to continue in the future, using resources and feedback received from the current semester.
Deliverables
Show less
- Title
- Education and Technical Support of Prosthetics and Orthotics Education in Latin America (Semester Unknown) IPRO 309: Educational and Technical Support of Orthotics and Prosthetics Education in Latin America and the US IPRO 309 Poster Sp08
- Creator
- Allen, Ross, Barlow, Elliot, Benger, Lydia, Buntain, Seth, De Nicolo, Marisa, Larue, Robert, Moore, Emily, Quandt, Gregory, Rozborski, Stefanie, Selby, Heather
- Date
- 2008, 2008-05
- Description
-
There exists a strong demand for orthotics and prosthetics (O & P) in Latin America, with approximately 2.5 million people in need of this...
Show moreThere exists a strong demand for orthotics and prosthetics (O & P) in Latin America, with approximately 2.5 million people in need of this type of care. IPRO 309 was started in the spring of 2006 with the goal of helping to make this type of care more readily available. However, there are only 50 certified, and 1500 uncertified, O & P practitioners in Latin America. In order to become a certified practitioner, a student must graduate from an ISPO accredited program. Unfortunately, there is currently only one ISPO accredited program in existence in Latin America, along with several other programs that are not ISPO accredited. In October of 2004, Centro Don Bosco (Bogotá, Colombia), Don Bosco University (San Salvador, El Salvador), and the Laboratorio Gilete (Bogotá, Colombia) signed an agreement to establish the first accredited O & P education program in Colombia. Since then, Centro Don Bosco has allotted 3,500 square feet of space for the thriving faculty, classrooms, manufacturing training, and vocational workspace that are necessary for an ISPO accredited program. There are three levels of accreditation according to ISPO standards. Category III involves the design and manufacturing of orthotic and prosthetic devices, Category II includes the fabrication of the devices as well as direct patient care, and Category I includes production, treatment for patients, and research and development. The equivalent to ISPO in the United States is the American Board of Certification in Orthotics and Prosthetics (ABC). Because it is independent from the ISPO, the ABC standards of accreditation will need to be taken into account in order to carefully cross cultural and national boundaries.
Deliverables
Show less
- Title
- Decision Making Tool for Warehouse Logistics Pricing (semester?), IPRO 319: Warehouse Logistics Pricing IPRO 319 Midterm Report Sp07
- Creator
- Duong, Khanh, Egwu, Uchenna, Ma, Justin, Mcanally, Arthur, Mrozinski, Kristin, Oh, Douglas, Schwarz, Nickolay, Stone, Sarah, Sudar, Aleksandar, Yu, Hee Jeoung, Zavala, Arthur
- Date
- 2007-05, 2007-05
- Description
-
distribution operation which will aid companies seeking to outsource logistics operations. However, the team’s main objective is to add a...
Show moredistribution operation which will aid companies seeking to outsource logistics operations. However, the team’s main objective is to add a Request for Proposal tool to the existing model allowing companies to determine the effectiveness of outsourcing different aspects of warehouse operations. This team hopes to generate willingness in its members to establish an environment conducive to team-oriented goals, as outlined in the objectives below. Successful completion of the goals presented here will require each participant to gain useful experience and knowledge regarding teamwork, inter-professional skills and specifically warehouse logistics pricing. For the spring semester, the team has set forth the following objectives: Analyze existing model (Shipping, Manufacturing, Transportation, etc.) in terms of being user-friendly and effectiveness at accurately predicting cost versus revenue and whether the operations input should be outsourced. Refine the current model given the suggestions of a surveyed group, not differentiating the contributions of the IPRO students from the software users. Research costs associated with logistic processes. Develop a multi-purpose activity outsourcing tool for common use called “Request for Proposal”.
Sponsorship: Warehouse Education and Research Council; The Kern Family Foundation via the National Collegiate Inventors & Innovators Alliance
Deliverables for IPRO 319: Decision Making Tool for Warehouse Logistics Pricing for the Spring 2007 semester
Show less
- Title
- Hybrid Electric Fuel Cell Battery (Semester Unknown), IPRO 304: Hybrid Electric Fuel Cell Battery IPRO 304 Project Plan F04
- Creator
- Langel, Steve, Smith, Alison, Lefief, Chrissy, Moy, Matt, Omolaoye, Olatunde, Ayersman, Matt, Prince, Mike, Bachmann, Matt, Eisenberg, David, Weber, Ken, Lim, Dong Chul, Kraft, Rick, Aderangi, Vince, Buresh, Rita, Piputkar, Siddha, Johnson, Steven, Taher, Tanim
- Date
- 2005-01, 2004-12
- Description
-
This project is mainly concerned with creating a hybrid electric circuit to run a wheel chair for 100 miles. The hybrid circuit should...
Show moreThis project is mainly concerned with creating a hybrid electric circuit to run a wheel chair for 100 miles. The hybrid circuit should function in such a manner that during operation the wheel chair should continuously drawing power from the fuel cell but should also take power from the lithium-ion batteries during peak power demands which the fuel cell cannot fully cover. Currently no such hybrid circuit exists but is being developed on a theoretical basis.
Deliverables
Show less