Search results
(2,521 - 2,540 of 3,848)
Pages
- Title
- IIT Robotics Initiative (Semester 1 of Unknown), IPRO 316: IIT Robotics Initiative IPRO 316 IPRO Day Presentation Sp04
- Creator
- Patel, Shirali, Burica, Nicholas, Demarco, Eugenia, Hovde, Jonathan, Jones, Christopher, Krol, Daniel, Monis, Gabriela, Oyuela, Henry, Stachowitz, Paul
- Date
- 2004-10, 2004-05
- Description
-
IPRO 316 is in the business of innovation. Divided into multiple subgroups, each working on a unique, robotics oriented endeavor, the goal of...
Show moreIPRO 316 is in the business of innovation. Divided into multiple subgroups, each working on a unique, robotics oriented endeavor, the goal of the IPRO is to explore and develop robotics while gaining an understanding of robotic systems and functionality and exposing the IIT community to the extensive capabilities of such robots and the necessity of understanding them.
Deliverables
Show less
- Title
- Robotics Initiative at IIT (semester?), IPRO 316: IIT Robotics Initiative IPRO 316 Abstract F04
- Creator
- Sopko, Tyge, Collins, Jesse, Dass, Saurabh, Schwalbach, Eddie, Yang, Eddie, Payonk, Dennis, Todd, Robert, Bieberich, Amanda
- Date
- 2004-12, 2004-12
- Description
-
This IPRO is dedicated to continuing the robotics initiative at Illinois Institute of Technology. There are so many ways that this group of...
Show moreThis IPRO is dedicated to continuing the robotics initiative at Illinois Institute of Technology. There are so many ways that this group of people can accomplish that task. The importance of this overall goal is significant due to the growing use of robotics in the commercial world today.
Deliverables for IPRO 316: Robotics Initiative at IIT for the Fall 2004 semester
Show less
- Title
- Business Study of Alternatives Uses for Brewers’ Spent Grain (Semester Unknown) IPRO 340: AlternativeUsesForBrewers'SpentGrainIPRO340Poster2Sp11
- Creator
- Acacio, Kevin, Kapaldo, James, Orekoya, Moyosoreoluwa, Sahni, Sakshi, Apyan, Aram, Kim, Paul, Prusak, Mateusz, Zahir, Soha, Chiem, Edward, Mares Araiza, Rodolfo, Smith, Amanda, Tomlin, Stephen
- Date
- 2011, 2011-05
- Description
-
IPRO 340 (The Idea Fermentors) is working with Rock Bottom Brewery to determine alternative uses for the spent grain the brewery produces....
Show moreIPRO 340 (The Idea Fermentors) is working with Rock Bottom Brewery to determine alternative uses for the spent grain the brewery produces. Over 1,000 pounds of spent grain are produced at each of the three area locations weekly. Spent grain has many applications because of its high content of protein and fiber. Applications range from production of bio-plastics and bio-fuel, to agricultural uses as animal feed and compost material, to reuse as food for people. A major issue that Rock Bottom Brewery faces is that spent grain spoils very quickly, so alternative uses of spent grain must happen within a matter of days. IPRO 340 will determine what will be the best use of Rock Bottom Brewery’s spent grain in terms of logistics, cost, practicality, and environmental impact. The Idea Fermentors will lean and understand the brewery process and various applications for spent grain, as it pertains to Rock Bottom Brewery. The team will work together to accomplish project requirements as set forth by the IPRO office at IIT on time as well as satisfy the sponsor company’s needs.
Sponsorship: Timothy Marshall, Rock Bottom Brewery
Deliverables
Show less
- Title
- Zero Energy Lab (Semester Unknown) IPRO 337: Zero Energy Lab IPRO 337 Final Report F08
- Creator
- Aouissa, Abdelmalek, Chiu, Chris, Dodgen, James, Gambrell, Jennifer, Kadzban, Adam, Kedzuch, Andy, Larkin, Evan, Lowe, Scott, Meyer, James, Rojas, Brian, Vincent, Oba, Wolfe, Clark, Yaker, Farouk
- Date
- 2008, 2008-12
- Description
-
The IPRO 337 team’s objectives for this semester are to make further progress in updating the top floor of Machinery Hall into a lab for...
Show moreThe IPRO 337 team’s objectives for this semester are to make further progress in updating the top floor of Machinery Hall into a lab for future energy and lighting technology research. The research conducted this semester will help us transform the space into a more sustainable working environment. Since the ultimate goal is rather ambitious, our goal for this particular semester is to implement an energy plan which will become the basis off of which the future IPRO’s will continue towards the ultimate goal. We also intend to clear the space so that the developed plan can be tested.
Deliverables
Show less
- Title
- Crop to Cup Coffee: Building Communities through Coffee (Semester 2) IPRO 333: BuildingCommunitieThroughCoffeeIPRO333Poster3Su10
- Creator
- Awol, Yeamlaksira, Canelo, Freddy, Drabek, Lindsay, Economy, Stacy, Erie, Mike, Hurst, Trey, Waterloo, Becca, Z, Isabella
- Date
- 2010, 2010-07
- Description
-
The mission of IPRO 333 is to assist the Crop to Cup Company with the design and building of an enclosure for a temporary storage facility...
Show moreThe mission of IPRO 333 is to assist the Crop to Cup Company with the design and building of an enclosure for a temporary storage facility within the vicinity of their largest producing farming zone for robusta coffee in the Mbale region of Uganda. The sponsor, along with the team, has decided that the best method for addressing the local and global needs of the farmers is to present the research and design personally. Therefore, IPRO 333 will be fundraising to help finance the forthcoming trip to Uganda to present to the farming communities.
Sponsorship: Jacob Elster Crop to Cup
Deliverables
Show less
- Title
- Applying Rapid Prototyping Techniques to Production Tooling (semester?), IPRO 312: Rapid Prototyping Techniques IPRO 312 IPRO Day Presentation F06
- Creator
- Ranttila, Annie, Fu, Chun Yiu, Hussain, Shan I., Hicks, Ken, Dave, Udit, Manjrekar, Sourabh, Nosse, Daniel, Atta, Muhammad, Amine, Rachid, Craig, Seun, Abdullahi, Abdulkamal, Taylor, Lashawna
- Date
- 2006-12, 2006-12
- Description
-
This IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period...
Show moreThis IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period for the caster manufacturing company Colson Associates. As the project advanced, the team realized that the real objective of this IPRO was to: ‘Investigate techniques for rapidly and effectively manufacturing casters to satisfy “rush orders” for special casters.’
Deliverables for IPRO 312: Applying Rapid Prototyping Techniques to Production Tooling for the Fall 2006 semester
Show less
- Title
- Designing Affordable Housing out of Shipping Containers for Ciudad Juarez, Mexico (Semester Unknown) IPRO 339: Designing Affordable Housing out of Shipping Containers for Ciudad Juarez, Mexico IPRO 339 Poster F08
- Creator
- Dole, Shreyas, Eliyahu, Haim, Moore, Jeremy, O’neil, Ben, Olson, Heather, Peroni, Joe
- Date
- 2008, 2008-12
- Description
-
Currently there are several countries throughout the world that have a large need for affordable housing. Our IPRO is currently dealing with...
Show moreCurrently there are several countries throughout the world that have a large need for affordable housing. Our IPRO is currently dealing with solutions for Juarez, Mexico and Chicago, Illinois. These two places are very different in climate, culture, as well as economy. Our IPRO team this semester will focus on applying the prototype from last two semesters to Juarez, Mexico, while making adjustments as needed. We will continue the research into systems which will be advantageous to each situation and develop them accordingly. Once we get a better understanding as to how we can apply our prototype to Juarez situation we
Deliverables
Show less
- Title
- Delta Hook Tech (Semester Unknown) IPRO 358: DeltaHookTechIPRO358FinalReportSu09
- Creator
- Bistriceanu, Bogdan, Boyer, Robert, Champlin, Austin, Choitz, Rachel, Divito, Michael, Edwards, Herbert, Egland, Erik, Gaonkar, Mohit, Lai, James, Obaid, Hamza, Pop, Sabina, Staats, Andrew, Ton, Jimmy, Zhu, Patrick
- Date
- 2009, 2009-12
- Description
-
During the summer 2009 semester, IPRO 358 plans to develop mock-ups of the Delta Hook Technology (DHT) and to lay the foundation for a...
Show moreDuring the summer 2009 semester, IPRO 358 plans to develop mock-ups of the Delta Hook Technology (DHT) and to lay the foundation for a business model for Sparrowhawk, LLC, an early stage company. Sparrowhawk has investigated the concept for an innovative fishing hook that is not currently on the market or ready to be launched. The IPRO team will work together to approach the process of designing mock-ups of the Delta Hook Technology (DHT), testing the mock-ups, and determining measures that can be taken to improve the DHT. Subsequent mock-ups will continue to improve based on results of the product testing. Simultaneously, we will do market research in order to identify the target market, determine price points, and develop marketing strategies for DHT.
Sponsorship: Sparrowhawk, Delta Hook Technologies
Deliverables
Show less
- Title
- Kranti Home for Sexually Trafficked Girls (Semester Unknown) IPRO 343: KrantiHomeMumbaiIPRO343MidTermPresentationF09
- Creator
- None, None
- Date
- 2009, 2009-12
- Description
-
To develop and design a home and center of education for girls who have been previously trafficked
Deliverables
- Title
- Growing Water: 31st Street Eco-Boulevard and IIT Pavilion Prototype (Semester Unknown) IPRO 322: Growing Water IPRO 322 Project Plan F08
- Creator
- Beissinger, Daniel, Boder, Matthew, Booher, Steven, Bryant, Kristin, Guzek, Ewa, Horabik, David, Klusek, Natalia, Kochanek, Malgorzata, Mccarthy, Michael, Mejsak, Marcin, Oblenida, Ryan, Slota, Carolina, Veneziano, Marco
- Date
- 2008, 2008-12
- Description
-
1048 million gallons of water is used in Chicago everyday. Chicago replenishes almost none of it. Although there is no water shortage...
Show more1048 million gallons of water is used in Chicago everyday. Chicago replenishes almost none of it. Although there is no water shortage currently, many believe that water will be to the next century what oil is to this century: a huge commodity. Twenty percent of the world's potable water is contained in the Great Lakes. In order to be responsible consumers of this natural resource, Chicago is looking into different plans to return water to Lake Michigan. The purpose of Growing Water IPRO is to create a prototype of an Eco-boulevard on the IIT campus that will serve as an example of practices that could be implemented across the Chicago-land area to manage and naturally purify storm water and sewage water so it can be reintroduced to Lake Michigan. These Eco-boulevards will also serve as educational facilities to inform the community about the growing scarcity of water and how to conserve this precious resource.
Deliverables
Show less
- Title
- Large Scale Structure (Semester Unknown) IPRO 315: Large Scale Structure IPRO 315 MidTerm Presentation F08
- Creator
- Aduroja, Oluwasesan, Aguilar, Fabian, Althoff, Sarah, Aubry, Curtis, Chock, Chris, Dewi, Fransisca, Dlugosz, Anna, Douglas, Carlie, Olson, Sarah, Rodgers, Lucas, Stroot, Jaimi, Aguirre, Arturo, Antonio, Christopher, Cantone, Kyle, Chong, Hon-kyu, Forneris, Craig, Freund, Ryan, Khan, Qudsia, Laschiazza, Elizabeth, Muresan, Lucian, Rus, Bogdan, Scully, Dawveed, Steffen, Trent, Stenson, Amanda, Urdiales, Miguel, Yeung, Helen
- Date
- 2008, 2008-12
- Description
-
The intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group...
Show moreThe intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group thought it would be even more interested if IPRO 335 and IPRO 315 would mesh together to create a large green structure. The intent of IPRO 335 is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. Our team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Synthetic Biology: Engineering a Novel Organism (semester?), IPRO 302: Synthetic Biology IPRO 302 IPRO Day Presentation Sp07
- Creator
- Sandulescu, Corina, Ruszczak, Christopher, Ervin, Natalia, Lim, Soo, Heller, Matthew, Kisiel, Greggory, Sharma, Shubhi, Vasireddi, Sunil, Lin, Jeffrey, Ingvoldstad, Bennett, Carlton, Kyle, Sobczck, Karol
- Date
- 2007-05, 2007-05
- Description
-
Synthetic biology is a relatively new approach to genetic research where the focus is to build a simple genetic system with known processes...
Show moreSynthetic biology is a relatively new approach to genetic research where the focus is to build a simple genetic system with known processes and test it in a biological setting. This is in contrast to the reductionist approach where a complex pre-existing biological system is analyzed in an attempt to discover the purpose of each of the parts. In this IPRO, a very simple genetic system is being designed, built, and tested in a biological setting. Previous semesters have already accomplished such in bacteria. This semester's focus will be on building the system designed last semester and inserting it into an eukaryotic organism; the zebrafish. The main purpose of this IPRO is to advance the knowledge of biological systems and their manipulation. This is being done through the design and creation of a simple, but novel, genetic circuit, and the introduction of this circuit into an organism to observe its properties in vivo. In order to accomplish this goal, we have split up into 4 different sub-teams: Fish, Math Modeling, Futures and Design, and Construction
Deliverables for IPRO 302: Synthetic Biology: Engineering a Novel Organism for the Spring 2007 semester
Show less
- Title
- Aiding Virtual Organization (Semester Unknown) EnPRO 353
- Creator
- Babel, Sebastian, Bennett, Casey, Dhewaju, Anusuya, Ann Gan, Kok, Jeong, Ah Reum, Heun Kim, Kee, Schweiger, James, Kang, Minsoo
- Date
- 2008, 2008-05
- Description
-
The objective for IPRO 353 is to evaluate the business opportunities for iGroups. We will do this by drafting a business plan, which will be...
Show moreThe objective for IPRO 353 is to evaluate the business opportunities for iGroups. We will do this by drafting a business plan, which will be evaluated for feasibility and a final report will be issued, for suggestions as to the next steps the iGroups project should take. Included in the business plan and recommendation shall be: Description of iGroups Market data Financial data Projections for income, cash flow, sales Analysis of different business models for iGroups, and final recommendation.
Deliverables
Show less
- Title
- Zero Energy Lab (Semester Unknown) IPRO 337: Zero Energy Lab IPRO 337 Final Presentation Sp08
- Creator
- Mayers, Chris, Sibley, Jonathan, Irishfrazin, Max, Wachniak, Anthony, Sirotzke, Daniel, Mathus, Daniel, Stachowiak, Kyle, Smith, Suni, Sadasivuni, Sandeep, Rojas, Brian, Gambrell, Jennifer, Bo, Loren, Palomo, Kaye, Patel, Kunal
- Date
- 2008, 2008-05
- Description
-
The IPRO 337 team’s objectives for this semester is to make further progress in updating the top floor of Machinery Hall into a lab for future...
Show moreThe IPRO 337 team’s objectives for this semester is to make further progress in updating the top floor of Machinery Hall into a lab for future energy and lighting technology research and for the space itself to be able to be as sustainable as possible throughout research this semester. Since the end goal is a rather ambitious one, a more realistic goal is to have an energy plan for following IPRO’s to work off of and to have the space cleared so that the developed plan can be tested. The team hopes to generate willingness in its members to establish an environment conducive to team-oriented goals, as outlined in the objectives below. Successful completion of the goals presented here will require each participant to gain useful experience and knowledge regarding teamwork, inter-professional skills and specifically sustainable energy systems. For this fall semester, the team has set forth the following objectives: Research office utilities that consume low amounts of energy, and investigate how to improve the efficiency of current utilities. Research and test various energy efficient lighting solutions. Research environmentally friendly floor, wall, and ceiling finishes along with necessary office furniture. Develop a website to display the development progress of the Zero-Energy Lab and provide information regarding “green technology” Clean and prepare the 6,000 ft2 space for future inhabitants. Using the research, develop a program proposal for the Zero-Energy Lab.
Deliverables
Show less
- Title
- Social Network Analysis for Pace Suburban Bus Stakeholders (semester?), IPRO 321: Pace Project IPRO 321 Abstract 2 Sp05
- Creator
- Hahn, Young Ae, Basu, Nivedita, Block, Nathaniel, Cechova, Lenka, Colbath, Geoff, Dronamraju, Rahul, Dulinskas, Alexis, Gajera, Rinku, Hart, Joseph, Patel, Griva, Piedra, Carmelina, Sabady, Stacie, Schubert, Hannah, Thongsomjit, Papinya, Vandermolen, Douglas
- Date
- 2005-05, 2005-05
- Description
-
The Communication Design Workshop is an IPRO and is cross-listed with this main campus program. The sponsor is Pace, a successful and forward...
Show moreThe Communication Design Workshop is an IPRO and is cross-listed with this main campus program. The sponsor is Pace, a successful and forward looking suburban Chicago bus company serving a six county market the size of Rhode Island. The focus of the workshop is to identify factors that will help Pace retain riders. Retention is a significant issue as it has direct financial implications and Pace does not know why they lose riders. Communication issues may be part of the retention problem. Pace will share existing research with us — we will extend and supplement this work.
Sponsorship: Pace
Deliverables for IPRO 321: Social Network Analysis for Pace Suburban Bus Stakeholders for the Spring 2005 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Midterm Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Integration of Process Improvement (sequence unknown), IPRO 304 - Deliverables
- Creator
- Bauer, Jessie, Bergeron, Tony, Campen, Matt, Gruchalski, Erik, Choi, Tae Ki, Marx, Ryan, Murti, Chaitanya, Robbins, Brian, Sohal, Atinder Pal, Stenson, Amanda, Taboada, Alejandro, Zhang, Bingjian
- Date
- 2009-12
- Description
-
A. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress...
Show moreA. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress and shape of metal and need to be replaced immediately to avoid further damage to the machine and the steel to be milled.
Sponsorship: A. Finkl and Sona
Deliverables for IPRO 304: Integration of Process Improvements for the fall 2009 semester.
Show less
- Title
- Design & Build Chicago Scale Model for Dynamic Disaster Simulation (Semester Unknown) IPRO 317: Design and Build Chicago Scale Model for Dynamic Disaster Simulation IPRO 317 Project Plan Su08
- Creator
- Balkany, Graham, Claxton, Matt, Correa, Jessica, Flores, Emmanuel, Hernandez, Yvonne, Kim, Jichul, Lebron, Chance, Leong, Erick, O’brien, Daniel, Martinez, Oscar, Robledo, Ruben, Rus, Bogdan, Russeva, Diyanna, Seo, Andrew, Sun, Meng
- Date
- 2008, 2008-07
- Description
-
This is the second phase of this project as a continuation of Spring 2008 IPRO 317 and will have a focus for Summer 2008 on the computer...
Show moreThis is the second phase of this project as a continuation of Spring 2008 IPRO 317 and will have a focus for Summer 2008 on the computer program, the user interface, as well as completion of the first geographic area of the scale model. The objective of this project is to design and construct a 3-D scale model for the first portion of downtown Chicago (downtown Chicago has been subdivided into 6 portions). The model will be used to simulate and test the effectiveness of fire defense strategies to address fire or other catastrophes related to public health and safety. This model will include streets, buildings and detailed information that help the Chicago Fire Department in planning interventions, considering various scenarios and case studies. The model is being built in phases, with the overall design incorporating a sophisticated, computer-driven illumination scheme built within the model base. The model thus will be able to display animated scenarios of virtually any depth and focus, by means of time-varying color and brightness. CAD Computer-generated images and laser-cutting methods are the main techniques used to design and build the model, but hand craftsmanship is also necessary. The completed model will be fully modular, designed to transport easily to various facilities. The usefulness of the model thus will extend to many needs of the Chicago Fire Department and City of Chicago, as an educational tool within the department and for community outreach. Possible additional uses for the model will be wind tunnel measurement of pressure distributions to inform building design and City infrastructure needs, as well as the study of urban microclimates and the impact on building energy demand. There is also the potential for this model and its design approach to inform the development of scale models to depict the venues associated with the proposed 2016 Olympics along the Chicago lakefront. This project will include: (1) Identification of the scale, materials, technologies, and strategies for construction; (2) Physical mapping and computer modeling of the downtown built environment; (3) Design of the physical model and computer/electronic components; and (4) Construction of a reduced-area mock-up for final review and approval by the City of Chicago.
Sponsorship: Chicago Fire Department
Deliverables
Show less
- Title
- Ethanol Ultra-Light Aircraft (Fall 2002) IPRO 317
- Creator
- Dussault, Sulan, Karachorlu, Berj, Beita, Raphael, Talwar, Atul, Srinivasan, Bhuvana, Gajjar, Nekheel, Caranto, Jonathan, Miyumo, Martin, Gurung, Sunil, Laub, Christine, Underwood, Matt, Guzman, Miguel
- Date
- 2003, 2003-12
- Description
-
Students will continue the work of previous IPRO teams to convert a Quicksilver MXII ultralight airplane to run on E85 fuel (85% ethanol, 15%...
Show moreStudents will continue the work of previous IPRO teams to convert a Quicksilver MXII ultralight airplane to run on E85 fuel (85% ethanol, 15% gasoline). This is technically challenging because the plane uses a 2-stroke Rotax 503 engine, where the oil must be mixed in with the fuel. After the conversion, the plane will be flight-tested. In the mean time, the plane can be flown by students to enjoy the experience of flying a personal-type aircraft. In addition to the technical aspects, the project involves developing and maintaining relationships with sponsors, public relations, and a study of the potential for ethanol in the ultralight aircraft market. This project may eventually lead to the creation of a student organization responsible for maintaining and flying the ultralight aircraft.
Sponsorship: Cushing Air Field, Brandon Klein, Larry Garick
Project Plan for IPRO 317: Ethanol Ultra-Light Aircraft for the Fall 2002 semester
Show less