Search results
(1 - 20 of 24)
Pages
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 MidTerm Report Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Ethics Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Project Plan Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Poster2 Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Poster1 Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Brochure Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Final Report Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 Final Presentation Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Porous Pavement/Hydro-gel System for Storm Water Management (Semester Unknown) IPRO 312: Porous Pavement Hydro-gel System for Storm Water Management IPRO 312 MidTerm Presentation Sp08
- Creator
- Shoulders, Shawn, Johnson, Sarah, Lewis, William, Yeung, Helen, Chavazha, Misha, Lebron, Chance, Myers, James, Rybaltowski, Karl, Wang, Nan
- Date
- 2008, 2008-05
- Description
-
The objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various...
Show moreThe objectives of IPRO 312, are to design and demonstrate a hydrogel based, water retention and release system for implementation in various storm water reclamation scenarios while forecasting the impact of such a system, both economically and ecologically on a Chicago-land neighborhood.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335: Green Building Design Concepts and Integration IPRO 335 MidTerm Presentation F08
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335: Green Building Design Concepts and Integration IPRO 335 Poster1 F08
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335: Green Building Design Concepts and Integration IPRO 335 Project Plan F08
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335: Green Building Design Concepts and Integration IPRO 335 Brochure F08
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Green Building Design Concepts and Integration (Semester Unknown) IPRO 335: Green Building Design Concepts and Integration IPRO 335 Poster2 F08
- Creator
- Rogers, Lucas, Parker, Joe, Forneris, Craig, Olson, Sarah, Dewi, Fransisca, Feyi, Aduroja, Schully, Dawveed, Khan, Qudsia, Rus, Bogdan, Yeung, Helen, Freund, Ryan, Urdiales, Miguel, Cantone, Kyle, Muresan, Lucian, Freund, Ryan, Stenson, Amanda, Yeung, Helen, Stroot, Jaimi, Chock, Chris, Steffen, Trent, Laschiazza, Elizabeth, Aubry, Curtis, Douglas, Carlie
- Date
- 2008, 2008-12
- Description
-
The intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different...
Show moreThe intent of this IPRO project is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. The team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. Then it was suggested that the building this project group designed would then be studied structurally by the team of IPRO 315: Design of a Large-Scale Structure. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Large Scale Structure (Semester Unknown) IPRO 315: Large Scale Structure IPRO 315 Poster2 F08
- Creator
- Aduroja, Oluwasesan, Aguilar, Fabian, Althoff, Sarah, Aubry, Curtis, Chock, Chris, Dewi, Fransisca, Dlugosz, Anna, Douglas, Carlie, Olson, Sarah, Rodgers, Lucas, Stroot, Jaimi, Aguirre, Arturo, Antonio, Christopher, Cantone, Kyle, Chong, Hon-kyu, Forneris, Craig, Freund, Ryan, Khan, Qudsia, Laschiazza, Elizabeth, Muresan, Lucian, Rus, Bogdan, Scully, Dawveed, Steffen, Trent, Stenson, Amanda, Urdiales, Miguel, Yeung, Helen
- Date
- 2008, 2008-12
- Description
-
The intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group...
Show moreThe intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group thought it would be even more interested if IPRO 335 and IPRO 315 would mesh together to create a large green structure. The intent of IPRO 335 is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. Our team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Large Scale Structure (Semester Unknown) IPRO 315: Large Scale Structure IPRO 315 Final Presentation F08
- Creator
- Aduroja, Oluwasesan, Aguilar, Fabian, Althoff, Sarah, Aubry, Curtis, Chock, Chris, Dewi, Fransisca, Dlugosz, Anna, Douglas, Carlie, Olson, Sarah, Rodgers, Lucas, Stroot, Jaimi, Aguirre, Arturo, Antonio, Christopher, Cantone, Kyle, Chong, Hon-kyu, Forneris, Craig, Freund, Ryan, Khan, Qudsia, Laschiazza, Elizabeth, Muresan, Lucian, Rus, Bogdan, Scully, Dawveed, Steffen, Trent, Stenson, Amanda, Urdiales, Miguel, Yeung, Helen
- Date
- 2008, 2008-12
- Description
-
The intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group...
Show moreThe intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group thought it would be even more interested if IPRO 335 and IPRO 315 would mesh together to create a large green structure. The intent of IPRO 335 is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. Our team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Large Scale Structure (Semester Unknown) IPRO 315: Large Scale Structure IPRO 315 Handout F08
- Creator
- Aduroja, Oluwasesan, Aguilar, Fabian, Althoff, Sarah, Aubry, Curtis, Chock, Chris, Dewi, Fransisca, Dlugosz, Anna, Douglas, Carlie, Olson, Sarah, Rodgers, Lucas, Stroot, Jaimi, Aguirre, Arturo, Antonio, Christopher, Cantone, Kyle, Chong, Hon-kyu, Forneris, Craig, Freund, Ryan, Khan, Qudsia, Laschiazza, Elizabeth, Muresan, Lucian, Rus, Bogdan, Scully, Dawveed, Steffen, Trent, Stenson, Amanda, Urdiales, Miguel, Yeung, Helen
- Date
- 2008, 2008-12
- Description
-
The intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group...
Show moreThe intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group thought it would be even more interested if IPRO 335 and IPRO 315 would mesh together to create a large green structure. The intent of IPRO 335 is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. Our team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less
- Title
- Large Scale Structure (Semester Unknown) IPRO 315: Large Scale Structure IPRO 315 Final Report F08
- Creator
- Aduroja, Oluwasesan, Aguilar, Fabian, Althoff, Sarah, Aubry, Curtis, Chock, Chris, Dewi, Fransisca, Dlugosz, Anna, Douglas, Carlie, Olson, Sarah, Rodgers, Lucas, Stroot, Jaimi, Aguirre, Arturo, Antonio, Christopher, Cantone, Kyle, Chong, Hon-kyu, Forneris, Craig, Freund, Ryan, Khan, Qudsia, Laschiazza, Elizabeth, Muresan, Lucian, Rus, Bogdan, Scully, Dawveed, Steffen, Trent, Stenson, Amanda, Urdiales, Miguel, Yeung, Helen
- Date
- 2008, 2008-12
- Description
-
The intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group...
Show moreThe intent of the IPRO 315 is to design a large-scale structure. The focus of this IPRO is structural analysis. The advisors of this group thought it would be even more interested if IPRO 335 and IPRO 315 would mesh together to create a large green structure. The intent of IPRO 335 is to design a “green” and innovative building using the skills and input of students studying different majors at Illinois Institute of Technology. Our team has decided to design a replacement apartment building for Gunsaulus Hall on the Illinois Institute of Technology campus. Innovative technologies and practices will be researched and employed to design a “green” building. The decision to design a building for the IIT campus came about because it is an area that all of the team members could relate to and have a more realistic grasp on the project. For the remainder of the semester the two groups are planning on coordinating with each other on each step of the design process.
Deliverables
Show less