Search results
(1 - 17 of 17)
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Final Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 IPRO Day Presentation Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Project Plan Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Brochure Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Midterm Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Poster Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Final Presentation Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster3 Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Ethics Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Project Plan Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Brochure Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Final Report Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 MidTerm Presentation Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster2 Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less