Search results
(3,361 - 3,380 of 3,848)
Pages
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 MidTerm Presentation Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Plot Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Brochure1 Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Poster Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: DevelopingTechnologyToImproveEducationInHaitiIPRO335FinalReportSp11
- Creator
- Antenor, Regine, Brauer, Simon, Berrones, Mario, Brummer, Stephanie, Ernst, Jacob, Hammond, Brandon, Harpstead, Erik, Hutches, Annie, Shah, Dhara, Tai, Hana, Tillman, Ryan
- Date
- 2011, 2011-05
- Description
-
To enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as...
Show moreTo enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as expanding our practical and professional experience through obtaining sponsorship within the energy industry. To implement a reproducible model of sustainable energy that an informed user base can maintain without external assistance.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: DevelopingTechnologyToImproveEducationInHaitiIPRO335MidTermPresentationSp11
- Creator
- Antenor, Regine, Brauer, Simon, Berrones, Mario, Brummer, Stephanie, Ernst, Jacob, Hammond, Brandon, Harpstead, Erik, Hutches, Annie, Shah, Dhara, Tai, Hana, Tillman, Ryan
- Date
- 2011, 2011-05
- Description
-
To enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as...
Show moreTo enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as expanding our practical and professional experience through obtaining sponsorship within the energy industry. To implement a reproducible model of sustainable energy that an informed user base can maintain without external assistance.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: DevelopingTechnologyToImproveEducationInHaitiIPRO335EthicsSp11
- Creator
- Antenor, Regine, Brauer, Simon, Berrones, Mario, Brummer, Stephanie, Ernst, Jacob, Hammond, Brandon, Harpstead, Erik, Hutches, Annie, Shah, Dhara, Tai, Hana, Tillman, Ryan
- Date
- 2011, 2011-05
- Description
-
To enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as...
Show moreTo enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as expanding our practical and professional experience through obtaining sponsorship within the energy industry. To implement a reproducible model of sustainable energy that an informed user base can maintain without external assistance.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: DevelopingTechnologyToImproveEducationInHaitiIPRO335FinalPresentationSp11
- Creator
- Antenor, Regine, Brauer, Simon, Berrones, Mario, Brummer, Stephanie, Ernst, Jacob, Hammond, Brandon, Harpstead, Erik, Hutches, Annie, Shah, Dhara, Tai, Hana, Tillman, Ryan
- Date
- 2011, 2011-05
- Description
-
To enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as...
Show moreTo enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as expanding our practical and professional experience through obtaining sponsorship within the energy industry. To implement a reproducible model of sustainable energy that an informed user base can maintain without external assistance.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335
- Creator
- Antenor, Regine, Brauer, Simon, Berrones, Mario, Brummer, Stephanie, Ernst, Jacob, Hammond, Brandon, Harpstead, Erik, Hutches, Annie, Shah, Dhara, Tai, Hana, Tillman, Ryan
- Date
- 2011, 2011-05
- Description
-
To enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as...
Show moreTo enable, empower, and enrich Haitian children’s education through the use of sustainable energy and educational technology, as well as expanding our practical and professional experience through obtaining sponsorship within the energy industry. To implement a reproducible model of sustainable energy that an informed user base can maintain without external assistance.
Deliverables
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Midterm Report Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Project Plan Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 IPRO Day Presentation Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Hydrogen Fueling Station (semester?), IPRO 301: Renewable Hydrogen Fueling Station IPRO 301 Poster F05
- Creator
- Edgar, Becerril, Daniel, Charles
- Date
- 2005-12, 2005-12
- Description
-
The objective of IPRO 301 was to design an economically advantageous hydrogen fueling station.
Deliverables for IPRO 301: Hydrogen Fueling...
Show moreThe objective of IPRO 301 was to design an economically advantageous hydrogen fueling station.
Deliverables for IPRO 301: Hydrogen Fueling Station for the Fall 2005 semester.
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306: ImprovingGlobalSupplyChainManagementIPRO306PosterF10
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306: ImprovingGlobalSupplyChainManagementIPRO306ProjectPlanF10
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306: ImprovingGlobalSupplyChainManagementIPRO306FinalPresentationF10
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306: ImprovingGlobalSupplyChainManagementIPRO306FinalReportF10
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- Improving Global Supply Chain Management (Semester Unknown) IPRO 306: ImprovingGlobalSupplyChainManagementIPRO306MidTermPresentationF10
- Creator
- Bakalli, Burim, Biller, Martin, Chavalit, Paramin, Dicosola, Andrew, Eom, Joohyung, Falk, Stephen, Sita Jayanthy, Ashika, Krauszowska, Monika, Pang, Alan, Rawal, Chetan, Skiba, David, Spytek, Michael, Walters, Michael, Yonezawa, Samuel, Zhan, Shawn
- Date
- 2010, 2010-12
- Description
-
IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall...
Show moreIPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in improving the global chain supply as well as the overall effectiveness and efficacy of their equipment and processes. Sloan Valve has three projects with IPRO 306 will be involved, and they range in three different fields of the manufacturer.
Sponsorship: SLOAN
Deliverables
Show less
- Title
- BUOY (Semester Unknown) IPRO 310
- Creator
- Dykeman, Kimberly, Healton, Michaela, Lipman, Timothy, Ludwig, Ross, Park, Jay, Reilly, Jeffrey, Sarkar, Smita, Sirk, Phillip, Toro, Branden
- Date
- 2009, 2009-12
- Description
-
Our mission is to develop, test, and implement assistive technology with the community that promotes safety and improves independence of blind...
Show moreOur mission is to develop, test, and implement assistive technology with the community that promotes safety and improves independence of blind and visually impaired (BVI) swimmers.
Deliverables
Show less