Search results
(1 - 16 of 16)
- Title
- Robbins Community Power (Summer 2011) IPRO 347: Robbins Community Power IPRO347 Summer2011 Poster
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (Summer 2011) IPRO 347: Robbins Community Power Wood Utilization Study IPRO347 Summer2011 Midterm Presentation
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (Summer 2011) IPRO 347: Robbins Community Power IPRO347 Summer2011 Final Presentation
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (Summer 2011) IPRO 347
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (Summer 2011) IPRO 347: Robbins%20Community%20Power%20IPRO347%20Summer2011%20Project%20Plan_redacted
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Robbins Community Power (Summer 2011) IPRO 347: Robbins Community Power IPRO347 Summer2011 Final Report
- Creator
- Ahn, Yoona, Alhassan, Abdalmohsen, Johnson, Ashleigh, Khan, Nomair, Kois, Carolyn, Munoz, Matthew, Toy, Robert, Young, Julieann
- Date
- 2011, 2011-07
- Description
-
IPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The...
Show moreIPRO 347 is a continuation of an IPRO, which previously explored ways to utilize waste heat and CO2 from Robbins Community Power Plant. The concluding thought from that project was that the plant would need to select a source of greenwood to burn. The goal of IPRO 347 is to establish a plan for the Robbins Community Power Plant to gather and utilize the green waste of urban lumber. The main task is to research opportunities for RCP to gather a supply of greenwood. The items being researched are estimated expenses and profits, whom will be participating, the availability of our raw good—greenwood—and potential buyers.
Sponsorship: Robbins Community Power Plant
Project Plan for IPRO 347: Robbins Community Power for the Summer 2011 semester
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Poster Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Project Plan Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Final Presentation Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Final Report Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Brochure2 Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Ethics Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 MidTerm Presentation Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Plot Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Brochure1 Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less