Search results
(1 - 15 of 15)
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Project Plan Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Poster Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Final Presentation Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Final Report Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Ethics Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Brochure Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Midterm Report Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Abstract Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Final Report Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Poster Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Midterm Report Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 Project Plan Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less
- Title
- Design of a Large-Scale Bridge Structure (semester?), IPRO 315: Large-Scale Bridge Structure IPRO 315 IPRO Day Presentation Sp07
- Creator
- Atewologun, Gbadebo, Barrett, Christina, Brilla, John, Fahs, David, Fong, Patrick, Froehlich, Bernard, Giana, Emiliano, Heler, Naomi, Hernandez, Daniel, Hong, Ei, Huang, Thomas, Khudeira, Mohamad, Kim, Yong-wan, Lee, Linda, Leung, Man, Mahoney, Heather, Patel, Jinit, Pershey, Robert, Polena, Sotiel, Shethwala, Fuzel, Shorette, Lucas, Stopic, Milena, Swinderski, Melissa, Thakkar, Chintan, Welsh, Lee
- Date
- 2007-05, 2007-05
- Description
-
The objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s...
Show moreThe objectives of this IPRO are to design and build a steel bridge to the specifications given by AISC and, using teamwork, to win this year’s ASCE/AISC Regional Steel Bridge Competition
Deliverables for IPRO 315: Design of a Large-Scale Bridge Structure for the Spring 2007 semester
Show less