Search results
(1 - 20 of 21)
Pages
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 IPRO Day Presentation Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 Abstract Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 Poster F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 Midterm Report F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 Final Report F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 Project Plan F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 Final Report Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 Project Plan Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 IPRO Day Presentation F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Enhancing the Reliability and Perf of Paper Shredders IPRO 321 Abstract F07
- Creator
- Choi, Migun, Choriki, Justin, Flicek, Stephen, Huang, Yuxiong, Inouye, Tyler, King, Richard, Marinov, Plamen, Nagwan, Angad, Nielson, Garrett, Obst, Leslie, Pesik, Vesna, Swaidner, Kyle, Toyama, Brandee, Valls, Nil
- Date
- 2007-12, 2007-12
- Description
-
1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount...
Show more1. Determine the amount of force to cut 6, 8, 10 sheets of 20 lb paper, taking into account the width and length of the shred. Once the amount of force is determined, develop a computer simulation model that can predict the amount of force required based upon the following variable inputs: number of sheets, shred width, and shred length. 2. Through computer simulation or prototype development, design an efficient gear train that optimizes the number of gears and minimizes the motor size based upon data obtained from previous semester’s data. The goal is to develop and simulate a gear train that can withstand 500 cycles at maximum sheet capacity. 3. Develop acoustical sound dampeners or “tune” the shredder to reduce the amount of noise created during the shredding process, leveraging information obtained from previous semesters’ data. The goal is to reduce the noise output by 10 decibels
Sponsorship: Seth Lewis, President of The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Fall 2007 semester
Show less
- Title
- Enhancing the Reliability and Performance of Paper Shredders (semester?), IPRO 321: Manhattan Group Product Design and Perf Eval IPRO 321 Poster Sp07
- Creator
- Tomsa, Michael, Zverev, Dmitriy, Pelae, Raisa, Strassler, Garrett, Kovacs, Julianna, Kwon, Chil-woong, King, Richard, Myers, Donald, Mennenga, Gregory, Chen, Jianyu
- Date
- 2007-05, 2007-05
- Description
-
The objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission...
Show moreThe objective of this team will be to improve safety, performance and evaluate/design an implementation for the reduction of noise emission from the sample of Paper Shredder Prototypes provided to us by “The Manhattan Group”, project sponsor. Another objective of this team is to evaluate the current market offerings and price points and create new industrial designs for a line of paper shredders that could be sold at retail stores such as Staples, Target, or Office Depot. Designs should focus on a new feature or style.
Sponsorship: Seth Lewis, President, The Manhattan Group
Deliverables for IPRO 321: Enhancing the Reliability and Performance of Paper Shredders for the Spring 2007 semester
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 Bibliography Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown)
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 Final Report Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 Final Presentation Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 Brochure Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 Poster Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less
- Title
- Campus Branding/ Sustainability Image (Semester Unknown): IIT Campus BrandingSustainability IPRO 311 MidTerm Presentation Su08
- Creator
- Barlow, Elliot, Chamales, Michael, Nadler, Anne, Contreras, Abraham, De Vita, Neils, Ishaq, Mohammad, Stultz, Adam, King, Richard, Gupta, Prairna, Song, Yunseok, Ono, Ashley, Ae Park, Ji, Korol, Phil, Mindock, Rae
- Date
- 2008, 2008-07
- Description
-
The overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards...
Show moreThe overall aim of the project is to improve and enhance the image of IIT, both as an institution and a physical campus, as regards sustainability and “green” practices. To that end, the current semester is focused on several design projects based on concepts generated in the previous semester. These projects will then be analyzed regarding their appeal, both direct and methodological, to other members of the IIT community in order to inform the best model for sustainability develop to be promoted by future semesters of this project.
Deliverables
Show less