Search results
(1 - 17 of 17)
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Project PlanSp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Presenation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Poster Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Presentation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Ethics Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Brochure Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316FinalReportSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316MidTermPresentationSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316Poster1Sp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316ProjectPlanSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316EthicsSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316FinalPresentationSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less
- Title
- IIT Intranet Mediator for USHMM (Semester Unknown) IPRO 316: DesignOfBiofuelsIPRO316BrochureSp09
- Creator
- Reimann, Kirsten, Oke, Babajide, Rodriguez, Ricky, Dornbusch, Don, Attard, Ryan, Camp, Kelsey, Khanna, Omaditya, Kim:, Daniel, Oke, Babajide, Reinhardt, Jesse, Kirtley, Calvin, Meno, Joel, Song, Jonghwa, Veliyathuparambil, Deepthi, Alhassan, Abdalmohsen, Amegasse, Pierre-paul, Hawker, Corey, Kyle, Ryan, Rodriguez, Hector, Sajdak, Piotr, Sakla, Emmanuel, Wiseman, Christopher
- Date
- 2009, 2009-05
- Description
-
The world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is...
Show moreThe world energy market is rapidly approaching a crossroads. As fossil fuel resources become sparser and fuel prices skyrocket, everyone is looking for the next best energy source. But not only does it need to be affordable, it also has to be safer for the environment and sustainable. There are many options being looked at including solar, wind and fuel cells, but there is one alternative that seems feasible in the immediate future: biodiesel.
Deliverables
Show less