Search results
(1 - 13 of 13)
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Final Report F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Final Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Brochure F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 IPRO Day Presentation Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 IPRO Day Presentation F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Project Plan F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Project Plan Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Brochure Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Midterm Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Midterm Report F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Poster Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less