Search results
(1 - 12 of 12)
- Title
- Personal VTOL Aircraft (semester?), IPRO 317: VTOL aircraft for the Masses IPRO 317 Abstract Sp06
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Personal VTOL Aircraft (semester?), IPRO 317
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Personal VTOL Aircraft (semester?), IPRO 317: VTOL aircraft for the Masses IPRO 317 Project Plan Sp06
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Personal VTOL Aircraft (semester?), IPRO 317: VTOL aircraft for the Masses IPRO 317 Poster Sp06
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Personal VTOL Aircraft (semester?), IPRO 317: VTOL aircraft for the Masses IPRO 317 Midterm Report Sp06
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Personal VTOL Aircraft (semester?), IPRO 317: VTOL aircraft for the Masses IPRO 317 Final Report Sp06
- Creator
- Chankov, Teodro, Dalton, Edward, Honore, Brandon, Meyer, Chad, Naselli, Adam, Qadir, Mohammed, Rozier, Paul, Szwajnos, Joanna, Tenenbaum, Jason, Ziskovsky, Anthony
- Date
- 2006-05, 2006-05
- Description
-
The primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the...
Show moreThe primary objectives of the testing group are to: 1. Verify the flight tests performed during the previous semester. 2. Confirm the sustainability of the engine and the reliability of control. 3. Verify the ability of the VTOL to successfully complete vertical take off and landing. 4. Verify the ability of the VTOL to transition from vertical to horizontal flight. 5. Demonstrate free flight of the VTOL. It is very likely that in the process of completing these objectives, other problems may arise that need to be solved. We will focus our immediate attention on solving these problems, however our long term focus will be on completing the primary objectives
Deliverables for IPRO 317: Personal VTOL Aircraft for the Spring 2006 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Final Report F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Brochure F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 IPRO Day Presentation F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Project Plan F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Susatainable Water dist System for Pignon Haiti IPRO 327 Midterm Report F07
- Creator
- Ballog, Matthew, Dennis, Nicole, Hussaini, Mudassir, Kohler, Jonathan, Lis, Tom, Mendoza, Gustavo, Mohammed, Ashfaq, Nockov, Ivan, Omeralovic, Enis, Parv, Ionut, Radloff, Eric, Rajic, Ivan, Rokita, Mark, Shethwala, Fuzel, Skrebo, Ermin, Smagur, Peter, Stella, Meredith, Szwajnos, Joanna, Tailor, Kinjal, Terry, Natasja
- Date
- 2007-12, 2007-12
- Description
-
IPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be...
Show moreIPRO 327’s objective is to create a complete set of drawings and specifications of a water distribution system for Pignon, Haiti that can be easily built and used by the town. This is a continuation of a spring 2007 IPRO, which completed mapping of the town. We now seek to design the physical water distribution system that can be sustained for twenty years. To do this, we have identified several factors significant to the success of this system that we will be focusing on. These include finding a water source that can provide a continuous and adequate flow of water, design of a pump and the power source to run it, design of water kiosks and faucets, and design of the piping network with erosion protection. User fees will also be determined for both public and private water lines. The water system will also be designed so that its output may grow with the population of the town over the next twenty years. Through our work, we hope to create a system that can be implemented by Pignon to provide a clean and reliable water source for its citizens.
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Fall 2007 semester
Show less