Search results
(2,141 - 2,160 of 3,603)
Pages
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Midterm Report F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Zero Energy Lab (Semester Unknown) IPRO 337: ZeroEnergyLabIPRO337Brochure2Su09
- Creator
- Cheng, Lidens, Gillmeister, Lauren, Gupta, Vaibhav, Hamill, Nancy, Karns, Nicole, Padwal, Neha, Patel, Priyanka, Vega, Mayra, Walker, Jason, Walker, Rachel, Yee, Michael
- Date
- 2009, 2009-07
- Description
-
The ultimate goal of the Zero Energy Lab IPRO is to design a universal format for occupying laboratories that utilize the minimal amount of...
Show moreThe ultimate goal of the Zero Energy Lab IPRO is to design a universal format for occupying laboratories that utilize the minimal amount of energy. For the Zero Energy Lab to be usable at all hours of the day, proper lighting is a necessity. The installation of an appropriately designed lighting system, which will be both cost and energy efficient, will be a high priority in the overall scheme. A small section of the overall space will be the prototype of the design, which will in turn allow for the further development of lighting implementation.
Deliverables
Show less
- Title
- Applying Rapid Prototyping Techniques to Production Tooling (semester?), IPRO 312: Rapid Prototyping Techniques IPRO 312 Midterm Report F06
- Creator
- Ranttila, Annie, Fu, Chun Yiu, Hussain, Shan I., Hicks, Ken, Dave, Udit, Manjrekar, Sourabh, Nosse, Daniel, Atta, Muhammad, Amine, Rachid, Craig, Seun, Abdullahi, Abdulkamal, Taylor, Lashawna
- Date
- 2006-12, 2006-12
- Description
-
This IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period...
Show moreThis IPRO was started as a Rapid Prototyping project in the semester of spring 2006. The main goal was to make casters in a short time period for the caster manufacturing company Colson Associates. As the project advanced, the team realized that the real objective of this IPRO was to: ‘Investigate techniques for rapidly and effectively manufacturing casters to satisfy “rush orders” for special casters.’
Deliverables for IPRO 312: Applying Rapid Prototyping Techniques to Production Tooling for the Fall 2006 semester
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Brochure2 F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Zinda (semester?), IPRO 352: Zinda IPRO 352 Project Plan F06
- Creator
- Ahmed, Waseem, Bhatia, Ankush, Buddell, Kenneth, Casiraghi, Juan, Mandolia, Rishu, Mikosz, Natalie, Trocke, John, Yamashita, Megumi, Zaprzal, Robert
- Date
- 2006-12, 2006-12
- Description
-
The mission of the EnPro 352 team is to provide high-quality custom designed, custom-fitted and reasonably priced clothing to our customers....
Show moreThe mission of the EnPro 352 team is to provide high-quality custom designed, custom-fitted and reasonably priced clothing to our customers. The current goal for EnPro 352–Fall 2006 is to create a professional business plan, and conduct product tests.
Deliverables for IPRO 352: Zinda for the Fall 2006 semester
Show less
- Title
- An Online Teachers Community for Chicago Public Schools (Semester Unknown) IPRO 320: An Online Teachers Community for Chicago Public Schools IPRO 320 Ethics Sp08
- Creator
- Abbasi, Rawan, Enverga, John, Goldstein, Linda, Jafarey, Usman, Seung Kim, Min, Kruger, Evan, Mishra, Lory, Moses, Justin, Pasari, Shruti, Smith, Anthony, Zelenskiy, Aleksandr
- Date
- 2008, 2008-05
- Description
-
Our objective for this semester is to have a prototype of a web community to be used by teachers. The community will consist of 100 registered...
Show moreOur objective for this semester is to have a prototype of a web community to be used by teachers. The community will consist of 100 registered teachers and feature a front page, a forum, and a wiki with 50 complete articles. A round of usability testing including 25 teachers will be conducted; the feedback will be used to gain knowledge and to add features in the future.
Deliverables
Show less
- Title
- Development of a Portable Method for Preparing Previously Frozen Red Blood Cells for transfusion (semester?), IPRO 304C: Portable Frozen Red Blood Cell IPRO 304C Project Plan Sp05
- Creator
- Baetz, Eric, Johnson, Derek, Resurreccion, Karen, Tullman, Jennifer, Bir, Sumar, Hmadouch, Ahlam, Dexter, Brogan, Olmos, Oscar, Ravuri, Ventata, Awosika, Clara, Palmer, David, Sutalo, Joseph
- Date
- 2005-05, 2005-05
- Description
-
The objective of this project is to develop a system for washing multiple units of red blood cells (RBCs) to be used in an emergency situation...
Show moreThe objective of this project is to develop a system for washing multiple units of red blood cells (RBCs) to be used in an emergency situation. The major aspects of this system to be controlled will be: portability, minimum wash solution, minimum bio-waste, automation, and compliance with the standards necessary for transfusion. The goal of this project is to develop a theoretical design for a working system by the end of this semester.
Deliverables for IPRO 304C: Development of a Portable Method for Preparing Previously Frozen Red Blood Cells for transfusion for the Spring 2005 semester
Show less
- Title
- New Product Evaluation and Improvement (Semester Unknown) IPRO 341: NewProductEvaluationandImprovementIPRO341MidTermPresentationSu09
- Creator
- Assaliyski, Marin, Attard, Ryan, Basiourski, Vitali, Dorn, Lawrence, Feldman, Laurie, Grabowski, Luke, Guerrero, Jose, Rusz, Vlad, Tchobanova, Natacha, Zellarchaffers, Priscilla
- Date
- 2009, 2009-07
- Description
-
The team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed....
Show moreThe team’s purpose is to test the current new design for Versatility Tool Works cabinet, and make suggestions for improvements if needed. Additionally, the team’s purpose was extended to develop a next‐generation tool storage cabinet and also to identify potential new markets for the company to pursue. This will require a truly inter‐professional team to analyze everything from the engineering of the tool storage cabinet to market research of the current and potential markets.
Deliverables
Show less
- Title
- Green Building (Semester Unknown) IPRO 335: GreenArtStudioIPRO335FinalReportSp09
- Creator
- Antol, Marcin, Balkany, Grahm, Block, Shawn, Campbell, Brittanie, Hart, Carl, Hodgson, Ashley, Korbus, Tracy, Limpinyakul, Jutarop, Lis, Tom, Llakmani, Anton, Macklin, Brandon, Mcguire, Luke, Modi, Nishant, Nguyen, Linh, Nigamatzyanov, Tagir, Palomo, Kaye, Ramey, Ronald, Saracino, Anthony, Socher, Daniel, Tan, Sophia, Williams, Jeremy
- Date
- 2009, 2009-05
- Description
-
The teams’ task is to demonstrate the interdisciplinary cooperative requirements as needed to fulfill a mission of sustainability. This IPRO...
Show moreThe teams’ task is to demonstrate the interdisciplinary cooperative requirements as needed to fulfill a mission of sustainability. This IPRO simulates an actual building development within the Chicago City limits. Specifically a green building development, which means that there is an increase in efficiency of the resources used while the building is constructed, operative, and removed.
Deliverables
Show less
- Title
- The Effects of Green Technology on Electrical Contractors (Semester Unknown) IPRO 338
- Creator
- Georgieva, Ludmila, Haurberg, Soren, Horwath, Joshua, Im, Hyeon, Johnson, Ross, La Luce, Mitchell, Lee, Jae, Lee, Yongdoo, Malawski, Frank, Manke, Alexandra, Mitchell, Jason, Odunaiya, Edumaregbemiro, Patel, Kunal, Pyciak, Mike, Stanard, Steve, Wong, Wing Hong, Tomal, Dan
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a template for a website to host a user-friendly online database of green technologies information for...
Show moreThe purpose of this IPRO is to develop a template for a website to host a user-friendly online database of green technologies information for the Electrical Contractors’ Association of the City of Chicago. This website will involve providing data on green electrical products with cut sheets, pricing and distributor information, return on investment projections, and LEED certification facts. The use of this website should help create a well informed transition from industry standard electrical products, to green alternative products, as well as cut down on miscommunication between architects and electrical contractors.
Sponsorship: Electrical Contractors’ Association of the City of Chicago
Deliverables
Show less
- Title
- Assisting Blind and Visually Impaired Swimmers (semester?), IPRO 310: Blind Swimmers IPRO 310 Brochure S07
- Creator
- Bauer, Elizabeth, Tovalin, Ivan, Goldstein, Palika, Dela Cruz, Miguel, Mokhuach, Svetlana, Stanford, Jeffrey, Patel, Axita, Ezell, Garrett, Koshy, Abin
- Date
- 2007-07, 2007-07
- Description
-
IPRO 310’s objectives are to continue the designing and building process of devices that help visually impaired swimmers. The IPRO 310 team...
Show moreIPRO 310’s objectives are to continue the designing and building process of devices that help visually impaired swimmers. The IPRO 310 team intends to design, create and test a sonar device that actively aids a visually impaired swimmer. The team also plans on redesigning, building and testing a swimming lane tapper that passively aids visually impaired swimmers. In addition, the 310 IPRO team has a business and marketing team that will be surveying members of the visually impaired community to assess their need and acceptance of the proposed devices.
Deliverables for IPRO 310: Assisting Blind and Visually Impaired Swimmers for the Summer 2007 semester
Show less
- Title
- Development Plan For The Michael Reese Site (Semester Unknown) IPRO 359: DevelopmentPlanForTheMichaelReeseSiteIPRO359BrochureSp10
- Creator
- Beardsley, Erin, Grace, Heather, Masangkay, Rodolfh, O'brien, Patrick, Van Eaton, Justin, Weissman, Kathryn, Champlin, Austin, Lockowski, Wesley, Morgenthaler, Maximillian, Salisbury, Joshua, Waisath, Nathan, Chun, Amy, Knapczyk, Robert, Nguyen, Nam, Slonski, Bryan, Wang, Ruoxi
- Date
- 2010, 2010-05
- Description
-
Our team purpose is to develop a project on the site of the old Michael Reese Hospital that develops the community, brings in revenue,...
Show moreOur team purpose is to develop a project on the site of the old Michael Reese Hospital that develops the community, brings in revenue, attracts development and revitalizes the surrounding areas. Our mission is to design something that attracts people and businesses through unique and innovative opportunities, as well as to establish a community where people can grow and develop leadership.
Deliverables
Show less
- Title
- Digital Word of Mouth (semester?), IPRO 304: Rural Health Design Solutions IPRO 304 Midterm Report Sp07
- Creator
- Joseph, Asha, O'brien, Daniel, Collins, Maura, Smets, Marieke, Baum, Alexis, Yamashita, Megumi, Park, Woo Jin, Fan, Chung-yi, Patel, Purvag, Campbell, Valerie, Niu, Eric, Solheim, Michael, Vichare, Pushkar, Khan, Syed, Ekholm, John, Wang, Taeho, Madraswala, Yousuf, Ward, Christopher, Cheek, Alex, Rivera-pierola, Peter, Sitthisathainchai, Waewwan
- Date
- 2007-05, 2007-05
- Description
-
The purpose of this project that will begin in Spring 2007 is to increase the "footprint" of health care workers in rural areas of India, that...
Show moreThe purpose of this project that will begin in Spring 2007 is to increase the "footprint" of health care workers in rural areas of India, that is, leverage the time and expertise of the workers to achieve a bigger and broader benefit to those who need health care. The basic question is how to increase the ability of health care workers to see more patients, increase their diagnostic capabilities and track patients on a regular basis within the existing rural environment
Sponsorship: Honeywell, Inc.
Deliverables for IPRO 304: Digital Word of Mouth for the Spring 2007 semester
Show less
- Title
- Global Warming and Community Outreach (Semester Unknown) IPRO 331: GlobalWarmingandCommunityOutreachIPRO328PosterSp09
- Creator
- Kim, James, Mcclure, Ryan, Melko, Aaron, Ocampo, Louis, Ralhan, Puneet, Reed, Lisa, Shukla, Adarsh, Subhani, Maham, Taracena, Willy, Wang, Nan, Yee, Michael, Zajkowska, Urszula
- Date
- 2009, 2009-05
- Description
-
IPRO 331, its team members, and all involved faculty are devoted to enhancing awareness in the community to the issues surrounding global...
Show moreIPRO 331, its team members, and all involved faculty are devoted to enhancing awareness in the community to the issues surrounding global warming. Our goal is to give PowerPoint presentations to several different audiences, especially today’s younger generations in elementary school, high school, and college, in order to both educate and interest people in these issues. Our presentations are meant to be objective – we want to present the facts about global warming research from credible sources. Additionally, with the help of our website and contacts, we hope to be another driving force in the sustainability movement and climate change research. Our purpose can be summed up in a quote included at the end of each of our presentations: “It is not the strongest of the species that survive, nor the most intelligent, but the ones most responsive to change.” – Charles Darwin
Deliverables
Show less
- Title
- Unmanned Aerial Systems (Semester Unknown) IPRO 312: UnmannedAerialSystemsIPRO312FinalReportF10
- Creator
- Ellickson, Andrew, Goliya, Akshay, Kotha, Anurag, Katre, Aniruddha, Luo, Chieh, Ragsdale, Christopher, Semerdjiev, Ivo, Traylor, Kay, Rivera, Rafael, Bilski, Sebastian, Semenov, Vladimir
- Date
- 2010, 2010-12
- Description
-
The use of Unmanned Aerial Systems (UAS) for intelligence, surveillance, reconnaissance as well as in search and rescue is rapidly expanding...
Show moreThe use of Unmanned Aerial Systems (UAS) for intelligence, surveillance, reconnaissance as well as in search and rescue is rapidly expanding in both civilian and military applications at an unprecedented rate which was not foreseen a decade ago. Accordingly, there are significant job opportunities in this field and it is expected that this will continue to grow in the next decade. However, the design of UAS is truly an interdisciplinary task as it requires an excellent team work with expertise in diverse areas ranging from aircraft design to autonomous flight, video and data transmission to visual object recognition, the operation of ground station such as real time data analysis and antenna tracking as well as legal/policy aspects of UAS flight operations.
Deliverables
Show less
- Title
- Refuable Electric Car (Semester Unknown) IPRO 313
- Creator
- Ashworth, Christopher, Castaneda, Anthony, Day, Joshua, Enwerem, Chinonso, Fairbanks, David, Gibbs, Jeremy, Guo, Kunlun, Hong Ip, Young, Kim, Yoosuk, Kocagoz, Sevi, Oblenida, Ryan, Ramirez, Alejandro, Shpuntova, Galina, Vetter, Price, Zaug, Julia
- Date
- 2010, 2010-05
- Description
-
To make significant strides toward creating a working prototype of a refuelable electric vehicle using a zinc air battery and to raise public...
Show moreTo make significant strides toward creating a working prototype of a refuelable electric vehicle using a zinc air battery and to raise public awareness of the potential of this technology.
Deliverables
Show less
- Title
- Enhancing Psychology Research through Advanced Communications Technology (semester?), IPRO 306: Enhancing Psych Research IPRO 306 Midterm Report Sp07
- Creator
- Abou-nemeh, Tarek, Chiu, Tina, Franke, Kevin, Hernandez, Krystin, Jacob, Alice, Jones, Chris, Miller, Chelsea, Vilenchik, Vlad, Walter, Stephanie
- Date
- 2007-05, 2007-05
- Description
-
The purpose of the research done in the IPRO 306 Mood Research Lab is to contribute to the body of knowledge regarding the patterns and...
Show moreThe purpose of the research done in the IPRO 306 Mood Research Lab is to contribute to the body of knowledge regarding the patterns and accuracy of retrospective recall of affect in persons with Major Depressive Disorder. This will be accomplished by using Personal Digital Assistants (PDAs) equipped with a standardized mood inventory to measure the recall accuracy in volunteers from the non-hospitalized, clinically depressed population and comparing it to that of volunteers from the healthy population.
Deliverables for IPRO 306: Enhancing Psychology Research through Advanced Communications Technology for the Spring 2007 semester
Show less
- Title
- Development of Play for Peace Website (semester?), IPRO 328: Play for Peace IPRO 328 Midterm Report Sp06
- Creator
- Gaonkar, Gautam, Gehrs, Scott, Haque, Sabeen, Kadakia, Vishal, Kim, Tae-young, Lee, Moon-won, Loomba, Rohit, Norby, Gerald, Olatunde-bello, Omolao, Park, Soomin, Payonk, Dennis, Solle, Jonathan, Turner, Daniel, Vilenchik, Vladislav
- Date
- 2006-05, 2006-05
- Description
-
At this point, most of the requirements from the client have been obtained (in table below). Based off of this, we have selected the Joomla...
Show moreAt this point, most of the requirements from the client have been obtained (in table below). Based off of this, we have selected the Joomla Client Management System to develop the web-site. The decision was made between Joomla, Mambo, and PHP-Nuke. All three are CMS systems with varying capabilities and weaknesses. The description for each of the CMS systems is provided below. What is left is to continue getting feedback from the client as well as continuing to adapt and modify Joomla as needed to fit our needs.
Deliverables for IPRO 328: Development of Play for Peace Website for the Spring 2006 semester.
Show less
- Title
- Digital Word of Mouth (semester?), IPRO 304: Rural Health Design Solutions IPRO 304 Poster Sp07
- Creator
- Joseph, Asha, O'brien, Daniel, Collins, Maura, Smets, Marieke, Baum, Alexis, Yamashita, Megumi, Park, Woo Jin, Fan, Chung-yi, Patel, Purvag, Campbell, Valerie, Niu, Eric, Solheim, Michael, Vichare, Pushkar, Khan, Syed, Ekholm, John, Wang, Taeho, Madraswala, Yousuf, Ward, Christopher, Cheek, Alex, Rivera-pierola, Peter, Sitthisathainchai, Waewwan
- Date
- 2007-05, 2007-05
- Description
-
The purpose of this project that will begin in Spring 2007 is to increase the "footprint" of health care workers in rural areas of India, that...
Show moreThe purpose of this project that will begin in Spring 2007 is to increase the "footprint" of health care workers in rural areas of India, that is, leverage the time and expertise of the workers to achieve a bigger and broader benefit to those who need health care. The basic question is how to increase the ability of health care workers to see more patients, increase their diagnostic capabilities and track patients on a regular basis within the existing rural environment
Sponsorship: Honeywell, Inc.
Deliverables for IPRO 304: Digital Word of Mouth for the Spring 2007 semester
Show less
- Title
- Hybrid Electric School Bus: Simulation, Design and Implementation (semester?), IPRO 342: Hybrid Electric School Bus IPRO 342 Final Report F06
- Creator
- Abraham, Preeti, Colletti, Sonya M., Fenner, Joel, Gowani, Ali, Hope, Eric M., Inouye, Tyler K., Khader, Mohammed, Nielson, Garrett T., Saeed, Aamer, Shah, Jatan
- Date
- 2006-12, 2006-12
- Description
-
IPRO 342 aims to create a workable test bed for a hybrid electric school bus. The initial work will include the planning and design of the...
Show moreIPRO 342 aims to create a workable test bed for a hybrid electric school bus. The initial work will include the planning and design of the test bed (carried out this semester), followed by the implementation and testing of the test bed (most of which will be carried out next semester). The goal will be to create a scaled model of the bus with correctly modeled electrical and mechanical systems. A parallel HEV (Hybrid Electric Vehicle) system with a permanent magnet electric motor will be used, and research by previous student teams will be utilized and expanded upon.
Deliverables for IPRO 342: Hybrid Electric School Bus - Simulation, Design and Implementation for the Fall 2006 semester
Show less