- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Final Presentation Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster3 Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Ethics Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Project Plan Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Brochure Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Final Report Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 MidTerm Presentation Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Large Scale Structure Design (Semester Unknown) IPRO 315: Large Scale Structure Design IPRO 315 Poster2 Sp08
- Creator
- Brady, Brian, Butkovich, Paul, Chung, Chun, Dominikowski, Marek, Herbert, Greg, Hussaini, Muddasir, Magdel, Irina, Mallinger, Nicolle, Omeralovic, Enis, Palma, Jennifer, Rathakrishnan, Malar, Ratnani, Shoaib, Russeva, Diyana, Russo, Ben, Shim, Mary, Sisay, Mary, Varhegyi, Aron, Velichekov, Veselin
- Date
- 2008, 2008-05
- Description
-
The plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this...
Show moreThe plan for this IPRO is to develop a design for a large scale parking garage that can accommodate about 500 cars. The objective of this project is to develop a design that goes beyond the standard parking systems used today. Rather, the attempt is to have a design which is more representative of “parking garages of future.” And as such, such features as quick handling of incoming and outgoing cars, efficiency in storage and aesthetics are considered in design. The building will be completely self-sufficient and will have to incorporate the architecture of the various buildings on campus. The design could have separate entrance and exit ramp towers, ramps incorporated with parking, or the futuristic design may be automated. An automated system will include a vehicle elevator of lift system to move the vehicle so the driver does not have to. The structure could be built with reinforced concrete or steel. The design will also include accessibility following the requirements set forth in the Americans with Disabilities Act.
Deliverables
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Sustainable Water Distribution IPRO 327 IPRO Day Presentation Sp07
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Sustainable Water Distribution IPRO 327 Project Plan Sp07
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Sustainable Water Distribution IPRO 327 Midterm Report Sp07
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Sustainable Water Distribution IPRO 327 Abstract Sp07
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less
- Title
- Sustainable Water distribution System for Pignon, Haiti (semester?), IPRO 327: Sustainable Water Distribution IPRO 327 Final Report Sp07
- Creator
- George, Alayna, Kircher, Alex, Sissala, Amy, Mohammed, Ashfaq, Susek, Ben, Tam, Chi, Chung, Chun Pong, Durra, David, Williams, David, Radloff, Eric, Skrebo, Ermin, Forkan, Garret, Rajic, Ivan, Sullivan, Joshua, Tailor, Kinjal, Rokita, Mark, Ballog, Matt, Hollister, Nathaniel, Sawulski, Piotr, Shoulders, Shawn, Ratmani, Shoaib
- Date
- 2007-05, 2007-05
- Description
-
Our objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical...
Show moreOur objectives for the semester are: Produce or procure a topographical map of Pignon, Haiti Map the current structures on a topographical map Design a preliminary water distribution system Work with Haiti Outreach to foster relations between IIT, the organization, and the community of Haiti Raise funds to cover partial costs of trips to Haiti to gather data
Deliverables for IPRO 327: Sustainable Water distribution System for Pignon, Haiti for the Spring 2007 semester
Show less