Search results
(1 - 20 of 22)
Pages
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359: ChicagoChildrensMuseumIPRO359BrochureSp11
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 Final Report F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359: ChicagoChildrensMuseumIPRO359MidTermPresentationSp11
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359: ChicagoChildrensMuseumIPRO359PosterSp11
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 Midterm Presentation F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 Poster F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 IPRO Day Presentation F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: 311
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 Brochure F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359: ChicagoChildrensMuseumIPRO359ProjectPlanSp11
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- THE MICHAEL REESE SITE (Semester Unknown) IPRO 359: ChicagoChildrensMuseumIPRO359FinalReportSp11
- Creator
- Malik, Ajose,, Fraser, Linnea, Liu, Fangpeng, Martinez, Jocsan, Masnaga, Masnaga,, Mcnally, William, Medina, Omar, Miller, Nathan, Nava, Fabian, Steinys, Victoria, Strandquist, Brad
- Date
- 2011, 2011-05
- Description
-
At one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the...
Show moreAt one time the Michael Reese Campus was a thriving mix of famous architecture and medical centers. Recently planned to be the home of the 2016 Olympic Village, with the loss of the bid the land has been abandoned. IPRO 356 is tasked with the challenge of designing a plan to redevelop the site. Building on previous work established by IPRO’s 359 and 356, we will use the first winning anchor and master plan created for the site and develop a second anchor. This second anchor and updated master plan aims at meeting the needs of the surrounding neighborhood while bringing life back to the area.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 Poster1 F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 Poster3 F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 Project Plan F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 Final Report F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 MidTerm Presentation F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less
- Title
- Energy and Facility Planning for Delta Tau Delta (Semester Unknown) IPRO 311: Energy and Facility Planning For Delta Tau Delta IPRO311 Poster2 F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009, 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. We will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During this IPRO we will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends. In general, we will collect information regarding the existing conditions and itemize all improvements that could be made to create a more energy efficient fraternity. In addition, we will look for grant assistance to help pay for future energy efficiency upgrades. This will allow us to address what is possible through comparison of funding and needs.
Deliverables
Show less