Search results
(1 - 14 of 14)
- Title
- New Harbor Village (Semester Unknown) IPRO 356: NHV IPRO356FinalReportF10
- Creator
- Balakierv, Konstantin, Brucato, Roberta, Dorn, Lawrence, Gallagher, Ellen, Gonzalez, Juan, Kim, Yoojee, Kwon, Steven, Matuszak, William, Patel, Abhishek, Wang, Ruoxi, Wang, Yani, Jong Kim, Churl, Marangoudakis, Chris, William, Paschal
- Date
- 2010, 2010-12
- Description
-
The aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has...
Show moreThe aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has asked for ideas to use the area. The previous IPRO had designed an extended living facility to be placed in the area. This was a good start but there is an extensive amount of land that is still unused. The city wishes to utilize this land so that the maximum amount of tax revenue can be seen. This semester, the IPRO team took what was suggested last year and improved it by developing a hotel, residential, and retail area. The plan called for different phases in which each area was either developed or added to during each phase. Extensive research was done to calculate number of units and location of the units. In the future the IPRO should future its research in the cost aspect of the project.
Deliverables
Show less
- Title
- New Harbor Village (Semester Unknown) IPRO 356: NHV IPRO356BrochureF10
- Creator
- Balakierv, Konstantin, Brucato, Roberta, Dorn, Lawrence, Gallagher, Ellen, Gonzalez, Juan, Kim, Yoojee, Kwon, Steven, Matuszak, William, Patel, Abhishek, Wang, Ruoxi, Wang, Yani, Jong Kim, Churl, Marangoudakis, Chris, William, Paschal
- Date
- 2010, 2010-12
- Description
-
The aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has...
Show moreThe aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has asked for ideas to use the area. The previous IPRO had designed an extended living facility to be placed in the area. This was a good start but there is an extensive amount of land that is still unused. The city wishes to utilize this land so that the maximum amount of tax revenue can be seen. This semester, the IPRO team took what was suggested last year and improved it by developing a hotel, residential, and retail area. The plan called for different phases in which each area was either developed or added to during each phase. Extensive research was done to calculate number of units and location of the units. In the future the IPRO should future its research in the cost aspect of the project.
Deliverables
Show less
- Title
- New Harbor Village (Semester Unknown) IPRO 356: NHV IPRO356PosterF10
- Creator
- Balakierv, Konstantin, Brucato, Roberta, Dorn, Lawrence, Gallagher, Ellen, Gonzalez, Juan, Kim, Yoojee, Kwon, Steven, Matuszak, William, Patel, Abhishek, Wang, Ruoxi, Wang, Yani, Jong Kim, Churl, Marangoudakis, Chris, William, Paschal
- Date
- 2010, 2010-12
- Description
-
The aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has...
Show moreThe aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has asked for ideas to use the area. The previous IPRO had designed an extended living facility to be placed in the area. This was a good start but there is an extensive amount of land that is still unused. The city wishes to utilize this land so that the maximum amount of tax revenue can be seen. This semester, the IPRO team took what was suggested last year and improved it by developing a hotel, residential, and retail area. The plan called for different phases in which each area was either developed or added to during each phase. Extensive research was done to calculate number of units and location of the units. In the future the IPRO should future its research in the cost aspect of the project.
Deliverables
Show less
- Title
- New Harbor Village (Semester Unknown) IPRO 356
- Creator
- Balakierv, Konstantin, Brucato, Roberta, Dorn, Lawrence, Gallagher, Ellen, Gonzalez, Juan, Kim, Yoojee, Kwon, Steven, Matuszak, William, Patel, Abhishek, Wang, Ruoxi, Wang, Yani, Jong Kim, Churl, Marangoudakis, Chris, William, Paschal
- Date
- 2010, 2010-12
- Description
-
The aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has...
Show moreThe aim of this project was to design a use for the area around the Michael Reese memorial. This area is currently unused and the city has asked for ideas to use the area. The previous IPRO had designed an extended living facility to be placed in the area. This was a good start but there is an extensive amount of land that is still unused. The city wishes to utilize this land so that the maximum amount of tax revenue can be seen. This semester, the IPRO team took what was suggested last year and improved it by developing a hotel, residential, and retail area. The plan called for different phases in which each area was either developed or added to during each phase. Extensive research was done to calculate number of units and location of the units. In the future the IPRO should future its research in the cost aspect of the project.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Poster Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Project Plan Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Final Presentation Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Final Report Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Brochure2 Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Ethics Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 MidTerm Presentation Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Plot Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320: Cottage and Area Physical Modeling For Enhancing A Classic Country Club IPRO320 Brochure1 Sp11
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less
- Title
- Cottage and Area Physical Modeling for Enhancing a Classic Country Club (Semester Unknown) IPRO 320
- Creator
- Biel, Timothy, Bradley, Joshua, Gill, Leonard, Gima, Daniel, Hill, Jenelle, Hold, Melissa, Holm, Alisa, Ishii, Jill, Kois, Carolyn, La Marca, Christopher, Lange, William, Matuszak, William, Mauban, Elizabeth, Mosey, Grant, Ng, Angela, O’keefe, Trevor, Pais, Coral
- Date
- 2011, 2011-05
- Description
-
The IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling...
Show moreThe IPRO 320 team is tasked with assisting Olympia Fields Country Club in making 3D models of their cottages and designing a bridge. Modeling all 26 cottages will necessitate the accurate collection of data from the cottages at the site. This will require the team to first survey the site and collect field data including measurements and digital photographs. After the data is collected, modeling of the cottages will start using computer software. This will be put into a presentable format for the country club. Also a publication is to be made on the process used in the collection of field data. The designing of the new bridge will serve as a Capstone requirement working with Robinson Engineering. Achieving this objective will require information from the site as well as an understanding of regulations involved in constructing a bridge. The model of the bridge will be presented to the country club as a possibility for replacing the existing deteriorating bridge. This document will give an extensive overview of the IPRO project. It will provide information on team members, details of the project procedure, and goals and expectations of the project. Work ethics and how to resolve team issues will be discussed. Also a brief history on Olympia Fields Country Club will be given.
Deliverables
Show less