Search results
(141 - 160 of 267)
Pages
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables: IPRO 311 Brochure F09
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- A Toolkit for Reframing Services for a Diverse Group: a research study of international students at Illinois Institutions
- Creator
- Han, Yi, Piotrowski, Pattie
- Date
- 2015-11-06, 2015-11-06
- Title
- Integration of Process Improvement (sequence unknown), IPRO 304 - Deliverables: 304
- Creator
- Bauer, Jessie, Bergeron, Tony, Campen, Matt, Gruchalski, Erik, Choi, Tae Ki, Marx, Ryan, Murti, Chaitanya, Robbins, Brian, Sohal, Atinder Pal, Stenson, Amanda, Taboada, Alejandro, Zhang, Bingjian
- Date
- 2009-12
- Description
-
A. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress...
Show moreA. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress and shape of metal and need to be replaced immediately to avoid further damage to the machine and the steel to be milled.
Sponsorship: A. Finkl and Sona
Deliverables for IPRO 304: Integration of Process Improvements for the fall 2009 semester.
Show less
- Title
- Developing Web Applications for the Northern Illinois Hockey League (sequence unknown), IPRO 308 - Deliverables: 308_redacted
- Creator
- Lucchesi, Kristin, Barksdale, Dustin, Hays, Julian, Bartus, Kryzystof, Perkins, William, Savage, Christopher, Scheer, Colin, Semenov, Vladimir, Vidutis, Mantas
- Date
- 2009-12
- Description
-
The NIHL is the largest hockey league in Illinois. It is also the largest youth all star hockey league in the US, serving over 300 youth teams...
Show moreThe NIHL is the largest hockey league in Illinois. It is also the largest youth all star hockey league in the US, serving over 300 youth teams and over 4,000 players. The team's purpose is to make the NIHL a web-based scheduling and scoring applications that can support their annual operations.
Sponsorship: Northern Illinois Hockey League(NIHL)
Deliverables for IPRO 308: Developing Web Applications for the Northern Illinois Hockey League for the fall 2009 semester
Show less
- Title
- Integration of Process Improvement (sequence unknown), IPRO 304 - Deliverables: IPRO 304 IPRO Day Presentation F09
- Creator
- Bauer, Jessie, Bergeron, Tony, Campen, Matt, Gruchalski, Erik, Choi, Tae Ki, Marx, Ryan, Murti, Chaitanya, Robbins, Brian, Sohal, Atinder Pal, Stenson, Amanda, Taboada, Alejandro, Zhang, Bingjian
- Date
- 2009-12
- Description
-
A. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress...
Show moreA. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress and shape of metal and need to be replaced immediately to avoid further damage to the machine and the steel to be milled.
Sponsorship: A. Finkl and Sona
Deliverables for IPRO 304: Integration of Process Improvements for the fall 2009 semester.
Show less
- Title
- Planning for Human Implantation of a Cortical Visual Prosthesis (sequence unknown), IPRO 334 - Deliverables: IPRO 334 Brochure F09
- Creator
- Bern, David, Chen, Shanyl, Deroo, Mary, Gorski, David, Kelly, Thomas, Leasenby, Alex, Li, Zhi, Pyrkh, Hanna, Subhani, Maham, Taneja, Aanchal
- Date
- 2009-12
- Description
-
The Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human...
Show moreThe Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human visual cortex, coordinated temporal-spatial image information can be artificially communicated to the human visual cortex in the form of electrical currents, acting as a sensory substitute for normal vision.
Sponsorship: IIT Laboratory of Neural Prosthetic Research
Deliverables for IPRO 334: Planning for Human Implantation of a Cortical Visual Prosthesis for the fall 2009 semester
Show less
- Title
- Zero Energy Lab AND Designing the IPRO Team Collaboratory Space (sequence unknown), IPRO 337 - Project Plan: IPRO 337 Project Plan F09
- Creator
- Akutagawa, Abraham, Babnigg, David, Chiu, Mark, Dosky, Benton, Hansen, Kai, Kawa, Konrad, Mensah, Teddy, Park, Lillian, Parkes, Brian, Patel, Jay, Reinecke, Jonathan, Shive, Clayton, Vice, Evan, Zappala, Theresa
- Date
- 2009-12
- Description
-
The goal of this IPRO is to continue the research and application of previous research into ‘Zero Energy’ techniques, while simultaneously...
Show moreThe goal of this IPRO is to continue the research and application of previous research into ‘Zero Energy’ techniques, while simultaneously evaluating an old CTA building on the IIT campus for its feasibility both as a collaboratory IPRO space and as a ‘Zero Energy’ building.
Project plan for IPRO 337: Zero Energy Lab AND Designing the IPRO Team Collaboratory Space for the fall 2009 semester.
Show less
- Title
- Developing Web Applications for the Northern Illinois Hockey League (sequence unknown), IPRO 308 - Deliverables: IPRO 308 Abstract F09
- Creator
- Lucchesi, Kristin, Barksdale, Dustin, Hays, Julian, Bartus, Kryzystof, Perkins, William, Savage, Christopher, Scheer, Colin, Semenov, Vladimir, Vidutis, Mantas
- Date
- 2009-12
- Description
-
The NIHL is the largest hockey league in Illinois. It is also the largest youth all star hockey league in the US, serving over 300 youth teams...
Show moreThe NIHL is the largest hockey league in Illinois. It is also the largest youth all star hockey league in the US, serving over 300 youth teams and over 4,000 players. The team's purpose is to make the NIHL a web-based scheduling and scoring applications that can support their annual operations.
Sponsorship: Northern Illinois Hockey League(NIHL)
Deliverables for IPRO 308: Developing Web Applications for the Northern Illinois Hockey League for the fall 2009 semester
Show less
- Title
- Innovative Mapping (sequence unknown), IPRO 303 - Deliverables: IPRO 303 Ethics Report F09
- Creator
- Komoroski, Aaron, Mora, Andres, Sarraf, Basel, Kemp, Brandon, Duong, Cindy, Woodward, Frank, Suwada, Jerry, Michael, Mark, Sinha, Piyush, Glover, Richard, Mandrekar, Urba
- Date
- 2009-12
- Description
-
The team worked to target the majority of mobile device users and give them an outlet to report any changes, mistakes or developments that...
Show moreThe team worked to target the majority of mobile device users and give them an outlet to report any changes, mistakes or developments that have been overlooked by NAVTEQ in the company's mobile mapping solutions. The team also worked to develop a solution that enables the average map user – men and women ages 18-35, students and tourists – to address these alterations in a simple, hassle-free way.
Sponsorship: NAVTEQ
Deliverables for IPRO 303: Innovative Mapping for the fall 2009 semester.
Show less
- Title
- Zinc-Fuel Cell Powered Car (sequence unknown), IPRO 313 - Deliverables
- Creator
- Sivanyanam, Sithambara, Ong, Wai, Shpuntova, Galina, Ludden, Shanon, Vetter, Jonathan, Sadja, Joel, Dado, Mathew, Ajigbo, Oluwafunso, Fairbanks, David, Slomiany, Krzysztof, Bjerke, Brian, Aihara, Rodrigo, Ragsdale, Christopher, Zaug, Julia, Lane, Brendan, Rial, Alexander, Ruszczak, Erich, Shaw, Kaumil, Sokolic, Jordan, Assaliyski, Marin
- Date
- 2009-12
- Description
-
The team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle...
Show moreThe team’s objective is to design a refuelable electric vehicle based on a zinc‐air battery, that is comparable to a current consumer vehicle in performance, cost, and safety; and to also develop a system for zinc fuel delivery that requires a minimum of changes to the existing fuel delivery infrastructure.
Deliverables for IPRO 313: Zinc-Fuel Cell Powered Car for the fall 2009 semester
Show less
- Title
- Collapsible Isolation Apparatus
- Creator
- Gauger, James R., Mullins, Robert L., Stefanek, George L., Petrovic, Joseph J.
- Date
- 2009-05-11, 2001-11-27
- Description
-
A collapsible personnel isolation apparatus for preventing unwanted contaminations of hazardous biological and chemical materials including a...
Show moreA collapsible personnel isolation apparatus for preventing unwanted contaminations of hazardous biological and chemical materials including a base. A cover connects to the base by way of a zipper. A plurality of glove box ports are provided to allow rapid and convenient treatment of the patient.
Sponsorship: IIT Research Institute
United States Patent
Show less
- Title
- High Tensile Vanadium Alloys
- Creator
- Rostoker, William
- Date
- 2012-03-20, 1957-09-03
- Description
-
Sponsorship: Armour Research Foundation of Illinois Institute of Technology
United States Patent
- Title
- Planning for Human Implantation of a Cortical Visual Prosthesis (sequence unknown), IPRO 334 - Deliverables: IPRO 334 Midterm Presentation F09
- Creator
- Bern, David, Chen, Shanyl, Deroo, Mary, Gorski, David, Kelly, Thomas, Leasenby, Alex, Li, Zhi, Pyrkh, Hanna, Subhani, Maham, Taneja, Aanchal
- Date
- 2009-12
- Description
-
The Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human...
Show moreThe Intracortical Visual Prosthesis is based upon that concept that by implanting a large number of subminiature electrodes within the human visual cortex, coordinated temporal-spatial image information can be artificially communicated to the human visual cortex in the form of electrical currents, acting as a sensory substitute for normal vision.
Sponsorship: IIT Laboratory of Neural Prosthetic Research
Deliverables for IPRO 334: Planning for Human Implantation of a Cortical Visual Prosthesis for the fall 2009 semester
Show less
- Title
- Sloan Valve Company (sequence unknown), IPRO 306 - Deliverables: IPRO 306 Midterm Presentation F09
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Jones, Santiago Guerrero, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009-12
- Description
-
Sloan Valve manufactures and distributes commercial valves and plumbing fixtures globally. The IPRO team will work to improve the 'procure to...
Show moreSloan Valve manufactures and distributes commercial valves and plumbing fixtures globally. The IPRO team will work to improve the 'procure to pay' process and also assist in the development of a new warehouse management module.
Sponsorship: Sloan Valve Company
Deliverables for IPRO 306: Sloan Valve for the fall 2009 semester.
Show less
- Title
- Design of a Large Scale Structure (sequence 315), IPRO 315 - Deliverables: IPRO 315 Project Plan F09
- Creator
- Aguilar-wedge, Carmen, Animashaun, Oladipo, Baur, Alex, Cullen, Michael, Hadi, Shuaib, Hedge, Namrata, Kuo, Steve, Lee, Christopher, Lee, Yongdoo, Rybaltowski, Karol, Scully, Dawveed, Shen, Jie-hua, Yousef, Shadi
- Date
- 2009-12
- Description
-
Located in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify...
Show moreLocated in Oakbrook, IL the architects and engineers of IPRO 315 will design a 22 story hotel. Together architects and engineers will modify and re analyze a structure created by pervious designers, and select any new materials for construction. In creating the hotel students will be responsible for the structural analysis of columns, beams, foundation, steel, and concrete design required to insure all serviceability requirements. The students will be required to follow the 2006 International Building Code, and secure the safety of all possible occupants. Management, leadership, ethics, and teamwork will be an integral part of building a large scale structure as students learn to work together on a “real life” project.
Deliverables for IPRO 315: Design of a Large Scale Structure for the fall 2009 semester
Show less
- Title
- Finding Uses for Alternative Fuels in Intermodal Transportation Hubs (sequence unknown), IPRO 307 - Deliverables: IPRO 307 Poster F09
- Creator
- Balakirev, Konstantin, Beau‐luby, Ryan, Bouikidis, John, Cargill, Matthew, Dziuba, David, Kehoe, Matthew, Slonski, Bryan, Tesfaye, Melat, Wiese, Matthew, Wiseman, Christopher, Zook, Joel
- Date
- 2009-12
- Description
-
Chicago, being the third largest freight hub in the world, needs an efficient movement of goods for the increasing freight shipments.
Sponsorsh...
Show moreChicago, being the third largest freight hub in the world, needs an efficient movement of goods for the increasing freight shipments.
Sponsorship: Mi-Jack
Deliverables for IPRO 307: Finding Uses for Alternative Fuels in Intermodal Transportation Hubs for the fall 2009 semester.
Show less
- Title
- Church & School Energy Efficiency and Financing Program (sequence unknown), IPRO 328 - Deliverables
- Creator
- Ciuffini, Kathryn, Kim, Ja Young, Knapczyk, Robert, Mckinley, Matthew, O'brien, Patrick, Maddamma, Todd, Schafer, Michael, Soderling, Philip, Wedster, Bonnie
- Date
- 2009-12
- Description
-
The Fall 2009 IPRO 328 team envisions the development and ultimately execution of a volunteer program which would facilitate the...
Show moreThe Fall 2009 IPRO 328 team envisions the development and ultimately execution of a volunteer program which would facilitate the implementation of energy saving improvements in a church and/or parochial school within the surrounding neighborhoods of IIT campus.
Sponsorship: Vince Cushing of Clean Urban Energy
Deliverables for IPRO 328: Church & School Energy Efficiency and Financing Program for the fall 2009 semester
Show less
- Title
- Hot Forming of Titanium and Titanium Alloys
- Creator
- Watmough, Thomas, Schey, John A.
- Date
- 2009-04-29, 1972-01-18
- Description
-
Sponsorship: IIT Research Institute
United States Patent
- Title
- Delta Shelter (sequence unknown), IPRO 311 - Deliverables
- Creator
- Schug, Timothy, Bradley, Joshua, Cahan, Noah, Dobbin, Dan, Hallenbeck, Jeff, Jordan, Davyd, Strandquist, Brad, Dohm, Jacob, Hoffman, Kent, Lee, Woong-kyo, Waisath, Nathan
- Date
- 2009-12
- Description
-
The Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects...
Show moreThe Delta Tau Delta fraternity wants to make their current house as energy efficient and green as possible. The team will look at all aspects of the DTD house and their operations to create a more energy efficient fraternity. During the term, the team will consider possible alternatives to many issues including but not limited to: mechanical heating system, building envelope, thermal properties of buildings perimeter, roofing materials, air infiltration, ventilation, and occupancy trends.
Deliverables for IPRO 311: Delta Shelter for the fall 2009
Show less
- Title
- Integration of Process Improvement (sequence unknown), IPRO 304 - Deliverables
- Creator
- Bauer, Jessie, Bergeron, Tony, Campen, Matt, Gruchalski, Erik, Choi, Tae Ki, Marx, Ryan, Murti, Chaitanya, Robbins, Brian, Sohal, Atinder Pal, Stenson, Amanda, Taboada, Alejandro, Zhang, Bingjian
- Date
- 2009-12
- Description
-
A. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress...
Show moreA. Finkl and Sons require an effective way of detecting carbide inserts on the steel milling machine. These inserts break off due to stress and shape of metal and need to be replaced immediately to avoid further damage to the machine and the steel to be milled.
Sponsorship: A. Finkl and Sona
Deliverables for IPRO 304: Integration of Process Improvements for the fall 2009 semester.
Show less