- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306: TechnologyAndBusinessInnovationsToImproveOperationsIPRO306AbstractF09
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306: TechnologyAndBusinessInnovationsToImproveOperationsIPRO306PosterF09
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306: TechnologyAndBusinessInnovationsToImproveOperationsIPRO306ProjectPlanF09_redacted
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306: TechnologyAndBusinessInnovationsToImproveOperationsIPRO306MidTermPresentationF09
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Technology and Business Innovations to Improve Operations (Semester Unknown) IPRO 306: TechnologyAndBusinessInnovationsToImproveOperationsIPRO306FinalPresentationF09
- Creator
- Delahanty, Sean, Jaouen, Julien, Thakkar, Hetul, Guerrero Jones, Santiago, Kim, Sung, Toor, Hammad, Jalan, Arjun, Soleja, Sikander, Zhang, Yayan
- Date
- 2009, 2009-12
- Description
-
The IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies...
Show moreThe IPRO 306 team is tasked with assisting a major plumbing manufacturer, Sloan Valve, in utilizing current technology to create efficiencies within its current operations. Due to the scope of the project and the desire of the team to produce the greatest impact on Sloan Valve, IPRO 306 will be involved with 2 projects during the fall of 2009.
Sponsorship: Steven Rodgers, Sloan Valve
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Poster1 F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Project Plan F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Final Report F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Brochure2 F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 MidTerm Presentation F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Ethics F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Poster2 F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Brochure1 F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Solid Fuel from Biomass for Cogeneration (Semester Unknown) IPRO 349: Solid Fuel From Biomass For Cogeneration IPRO 349 Final Presentation F08
- Creator
- Ajigbo, Oluwafunso, Lee, Sangkyoung, Adekola, Ademola, Kim, Sung, Kang, Minsoo, Ogata, Ken, Lee, Sangkyoung, Chee, Grace, Rhodes, Tyler, Yeseul, Lee, Camp, Kelsey, Schombert, Branden, Adekola, Ademola
- Date
- 2008, 2008-12
- Description
-
The following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for...
Show moreThe following are our objectives for the Fall 2008 semester: • Re-evaluate and update the calculations done by the previous IPRO group for theoretical energy content at each stage of the process. • Develop a flow scheme for a small scale cogeneration plant using solid biomass fuel from corn stover. • Research current equipment capacities and methods of heat transfer which could be used to implement a small scale cogeneration power plant. • Construct as economic analysis. • Deliver a final report that describes the overall energy yields, feasibility and economic analyses and possibly some recommendations for a large scale project.
Deliverables
Show less
- Title
- Material Renovation (Spring 2002) IPRO 308: Material_Renovation_IPRO308_Spring2002_Final_Presentation
- Creator
- Waller, Jennifer, Garland, Scott, Mujeebuddin, Rasheed, Rzewnicki, Brian, Kim, Sung-min, Darnstadt, Katherine, Grey, Jeremy, Greenberg, Lee, Maas, Kim, Koniali, Rima, Giagrande, Alex, Hottmann, Candace, Coley, Chad, Dietz, Heather, Laatz, Jason, Johnson, Mike
- Date
- 2002, 2002-05
- Description
-
The goal of this IPRO project is to create a realistic proposal for renovating and restoring Crown Hall to Mies Van der Rohe’s original vision...
Show moreThe goal of this IPRO project is to create a realistic proposal for renovating and restoring Crown Hall to Mies Van der Rohe’s original vision while still keeping the building functional for today. By following guidelines for its new landmark status and last semester’s research on the high priority problems of the building we created a plan of restoration that is hopefully comprehensive enough to put into effect as soon as possible.
Sponsorship: Getty Conservation Grant Program
Project Plan for IPRO 308: Material Renovation for the Spring 2002 semester