The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out... Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate. Show less