Search results
(1 - 16 of 16)
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Final Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Project PlanSp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Presenation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 IPRO Day Presentation Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Poster Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Presentation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Project Plan Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Ethics Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Brochure Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Brochure Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Midterm Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Poster Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less