Search results
(1 - 20 of 21)
Pages
- Title
- The 21st Century Farm (Semester Unknown) IPRO 336
- Creator
- Al-sabah, Mohammad, Antenor, Regine, Binet, Adrien, Broda, Dawid, Davis, Jacob, Derdelakos, Alexander, Gubser, Michael, Im, Hyeon, Handzel, Katarzyna, Kling, William, Lockom, Frank, Millham, Joseph, Nielsen, Lisa, O’keefe, Trevor, Ochoa, Jannette, Oraziman, Indira, Ostberg, Kristin, Phillips, Zachary, Schmidt, Michael, Silvestre, Ivan, Simmonds, Claire, Jake, Skaggs, Konrad, Sobon, Philip, Speroff, Todorova, Ralitza, Valmores, Travis, Wiff, Alexander
- Date
- 2010, 2010-05
- Description
-
US POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND...
Show moreUS POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND CITY CENTERS AND GROWING. US CENSUS PROJECTIONS ESTIMATE THAT BY 2050 THE TOTAL POPULATION WILL REACH 438,000,000; WITHOUT ADJUSTMENTS TO URBAN PERCENTAGE THAT NUMBER INCLUDES ALMOST 350,000,000 PEOPLE LIVING IN A METROPOLITAN AREA.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356ProjectPlanSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- The 21st Century Farm (Semester Unknown) IPRO 336: PlantThe21stCenturyFarmIPRO336FinalPresentationSp10
- Creator
- Al-sabah, Mohammad, Antenor, Regine, Binet, Adrien, Broda, Dawid, Davis, Jacob, Derdelakos, Alexander, Gubser, Michael, Im, Hyeon, Handzel, Katarzyna, Kling, William, Lockom, Frank, Millham, Joseph, Nielsen, Lisa, O’keefe, Trevor, Ochoa, Jannette, Oraziman, Indira, Ostberg, Kristin, Phillips, Zachary, Schmidt, Michael, Silvestre, Ivan, Simmonds, Claire, Jake, Skaggs, Konrad, Sobon, Philip, Speroff, Todorova, Ralitza, Valmores, Travis, Wiff, Alexander
- Date
- 2010, 2010-05
- Description
-
US POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND...
Show moreUS POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND CITY CENTERS AND GROWING. US CENSUS PROJECTIONS ESTIMATE THAT BY 2050 THE TOTAL POPULATION WILL REACH 438,000,000; WITHOUT ADJUSTMENTS TO URBAN PERCENTAGE THAT NUMBER INCLUDES ALMOST 350,000,000 PEOPLE LIVING IN A METROPOLITAN AREA.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312EthicsSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The 21st Century Farm (Semester Unknown) IPRO 336: PlantThe21stCenturyFarmIPRO336BrochureSp10
- Creator
- Al-sabah, Mohammad, Antenor, Regine, Binet, Adrien, Broda, Dawid, Davis, Jacob, Derdelakos, Alexander, Gubser, Michael, Im, Hyeon, Handzel, Katarzyna, Kling, William, Lockom, Frank, Millham, Joseph, Nielsen, Lisa, O’keefe, Trevor, Ochoa, Jannette, Oraziman, Indira, Ostberg, Kristin, Phillips, Zachary, Schmidt, Michael, Silvestre, Ivan, Simmonds, Claire, Jake, Skaggs, Konrad, Sobon, Philip, Speroff, Todorova, Ralitza, Valmores, Travis, Wiff, Alexander
- Date
- 2010, 2010-05
- Description
-
US POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND...
Show moreUS POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND CITY CENTERS AND GROWING. US CENSUS PROJECTIONS ESTIMATE THAT BY 2050 THE TOTAL POPULATION WILL REACH 438,000,000; WITHOUT ADJUSTMENTS TO URBAN PERCENTAGE THAT NUMBER INCLUDES ALMOST 350,000,000 PEOPLE LIVING IN A METROPOLITAN AREA.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312FinalPresentationSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356Poster1Sp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312AbstractSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312MidTermPresentationSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312FinalReportSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The 21st Century Farm (Semester Unknown) IPRO 336: PlantThe21stCenturyFarmIPRO336ProjectPlanSp10
- Creator
- Al-sabah, Mohammad, Antenor, Regine, Binet, Adrien, Broda, Dawid, Davis, Jacob, Derdelakos, Alexander, Gubser, Michael, Im, Hyeon, Handzel, Katarzyna, Kling, William, Lockom, Frank, Millham, Joseph, Nielsen, Lisa, O’keefe, Trevor, Ochoa, Jannette, Oraziman, Indira, Ostberg, Kristin, Phillips, Zachary, Schmidt, Michael, Silvestre, Ivan, Simmonds, Claire, Jake, Skaggs, Konrad, Sobon, Philip, Speroff, Todorova, Ralitza, Valmores, Travis, Wiff, Alexander
- Date
- 2010, 2010-05
- Description
-
US POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND...
Show moreUS POPULATION IS OVER 300,000,000 CITIZENS. CURRENTLY 81% OF AMERICANS LIVE IN CITIES, TRANSLATING INTO ABOUT 243,000,000 PEOPLE IN AND AROUND CITY CENTERS AND GROWING. US CENSUS PROJECTIONS ESTIMATE THAT BY 2050 THE TOTAL POPULATION WILL REACH 438,000,000; WITHOUT ADJUSTMENTS TO URBAN PERCENTAGE THAT NUMBER INCLUDES ALMOST 350,000,000 PEOPLE LIVING IN A METROPOLITAN AREA.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356BrochureSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalReportSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356MidTermPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312BrochureSp09_redacted
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312ProjectPlanSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less
- Title
- The Rotten IPRO (Semester Unknown) IPRO 312: TheRottenIPRO312PosterSp09
- Creator
- Cargill, Matthew, Coad, Matthew, Dominski, John, Gulling, Richard, Karpuzi, Isida, Morton, Stacy, Nielsen, Lisa, Oblenida, Cindy, Olichwier, David, Rossi, James, Ryan, Emily, Szpiech, Paulina
- Date
- 2009, 2009-05
- Description
-
Our team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university....
Show moreOur team, IPRO 312: The Rotten IPRO’s goal is to determine the best method on how to recycle organic waste generated by the university. Research and analysis will inform us on whether initiating a composting facility on campus is feasible or not. The opening of a composting facility can reduce the university's environmental impact. Furthermore, IIT can serve as a model to expand composting across the city of Chicago.
Deliverables
Show less