Search results
(1 - 19 of 19)
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Poster F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Brochure1 F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Abstract F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315Poster3Sp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Final Report F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Final Presentation F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315BrochureSp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Project Plan F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 MidTerm Presentation F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315Poster1Sp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Brochure2 F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315FinalPresentationSp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315FinalReportSp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303: Operational Considerations in Wind Power Generation IPRO 303 Ethics F08
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315MidTermPresentationSp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Operational Considerations in Wind Power Generation (Semester Unknown) IPRO 303
- Creator
- Adeola, Olaoluwa, Catalina, Christopher, Cervantes, Jesus, Claxton, Sara, Erogbogbo, Samad, Fairall, Earl, Ike, Richard, Keane, Robert, Lakiotis, Kristina, Melko, Aaron, Michael, Mithun, Patel, Viral, Ruffatto, Donald
- Date
- 2008, 2008-12
- Description
-
The Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation...
Show moreThe Fall 2008 semester of IPRO 303 will investigate and analyze the economic and technical details of the wind-turbine electricity generation industry. The IPRO 303 team will be focusing on the impact of equipment failures that lead to downtime and maintenance associated with the failures. A comparison of current industry practices in dealing with these problems, along with a detailed economic analysis of the true costs involved, will be the major goal. A final report of the findings and conclusions of the IPRO 303 team will be provided to our sponsor, SmartSignal Inc. It is understood that this Project Plan will change as the term progresses and more information becomes available.
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315Poster2Sp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less
- Title
- Design of a Large Scale Structure (Semester Unknwon) IPRO 315: DesignOfALargeScaleStructureIPRO315ProjectPlanSp09
- Creator
- Aguilar, Fabian, Abrudan, Corina, Adams, Christopher, Aihara, Rodrigo, Bhat, Adnan, Bielskus, Algirdas, Cervantes, Jesus, Cheung, Kwong, Conley, Kaitlyn, Crowley, Brian, Ekstrand, Carl, Ezell, Garrett, Jurasits, Joseph, Kozys, Karolis, Kucher, Rostislav, Lollino, Luca, Nizich, Adam, Newman, Adam, O’neil, Benjamin, Park, Shin Young, Roubeni, Sacha, Witek, Andrew, Zarazua, Gustavo
- Date
- 2009, 2009-05
- Description
-
The purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in...
Show moreThe purpose of this IPRO is to design a 22 story hotel located in the western suburbs of Oakbrook, IL. The group will use their skills in Architectural, Structural, and Mechanical engineering to efficiently design this structure.
Deliverables
Show less