- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Project Plan F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Poster Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Project Plan Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 IPRO Day Presentation Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Final Report Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Abstract Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Brochure F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Final Report F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Midterm Report F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Final Report F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 IPRO Day Presentation F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Midterm Report Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Poster F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Midterm Report F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 IPRO Day Presentation F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Abstract F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Poster F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Project Plan F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less