- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349: FuelCellDesignForUnmannedUnderwaterVehiclesIPRO349FinalPresentationSp10
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349: FuelCellDesignForUnmannedUnderwaterVehiclesIPRO349FinalReportSp10
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349: FuelCellDesignForUnmannedUnderwaterVehiclesIPRO349PostersSp10
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349: FuelCellDesignForUnmannedUnderwaterVehiclesIPRO349ProjectPlanSp10
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302Poster1Sp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302FinalPresentationSp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302Poster2Sp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302FinalReportSp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302BrochureSp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349: FuelCellDesignForUnmannedUnderwaterVehiclesIPRO349BrochureSp10
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- Alternative Meropolitan Power Strategy (Semester Unknown) IPRO 302: Alternative MetropolitanPowerStrategyIPRO302ProjectPlanSp10
- Creator
- Alsharief, Yagoob, Ballard, Ray, Crites, Sarah, Drecoll, Daniel, Klug, Allen, Goliya, Akshay, Frey, Brent, Marshall, Ray, Min, Hee-jong, Qiu, Li, Zajkowska, Urszula
- Date
- 2010, 2010-05
- Description
-
e federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of...
Show moree federal government is considering mandating a 20% renewable portfolio standard (RPS). Currently, the City of Chicago uses less than 3% of electricity from renewable energy. Our goal is to produce a hypothetical design for renewable energy to account for 20% of the City of Chicago’s electricity needs
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Fuel Cells for Unmanned Undersea Vehicles (Semester Unknown) IPRO 349
- Creator
- Abankwa, Kevin, Ashrafi, Sahar, Ballard, Ray, Baughey, Ethan, Chaffee, Matthew, Cho, Moses, Chock, Chris, Choy, Marcus, Guilfoyle, Jennifer, Hagopian, Matthew, Kenig, Elezar, Luo, Chieh
- Date
- 2010, 2010-05
- Description
-
The goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary...
Show moreThe goal of IPRO 349 is to produce a conceptual design of an unmanned underwater vehicle (UUV) that is powered by a fuel cell. The primary customer in consideration for this IPRO is the US Navy. The importance of submarines has long been recognized by the military and has caused drastic changed in modern warfare.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Project PlanSp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Presenation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Poster Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Presentation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Ethics Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less