Search results
(1 - 15 of 15)
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303ProjectPlanSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303PosterSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303BrochureSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303MidTermPresentationSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303FinalReportSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303: FailurePredictionModelingOfPowerPlantEmissionControlSystemsIPRO303FinalPresentationSp09
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Failure Prediction Modeling of Power Plant Emission Control Systems (Semester Unknown) IPRO 303
- Creator
- Arastu, Insiyah, Belanger, Dave, Bouikidis, John, Capps, Zachary, Hesser, Cari, Irish, Sean, Kaneria, Satyam, Mcquillan, Brett, Mohinani, Lavesh, Patel, Jay
- Date
- 2009, 2009-05
- Description
-
The main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental...
Show moreThe main goal of IPRO 303 is to investigate how SmartSignal’s modeling technology can provide value in detecting problems on environmental systems: The main objectives that SmartSignal would like for the team to investigate are: · What are the regulatory drivers – changes in laws/regulation occurring at various points in time? Are the regulations fleet-wide or regionally specific? Can credits be traded? Etc. · What types of systems are being deployed to remove what pollutants? Describe different sub-types and configurations within a type of system, and how common they are. · How much instrumentation is available on these systems, and what signals are measured (temperature, pressure, chemistry analysis, etc.)? How much diversity is there in the levels of available instrumentation? IPRO 303 Spring’09 13th February 2009 IPRO303 Project Plan Page 2 of 7 · What are the failure and performance degradation problems that occur? How common are they? What are the ramifications of these problems – outages, derates, having to burn more expensive fuel or turn up the “peaking” generation units that are more expensive to run, etc.? · How can the available instrumentation be used to remotely monitor and detect developing problems?
Sponsorship: SmartSignal
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Final Report F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Poster2 F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Poster1 F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 MidTerm Presentation F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Project Plan F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Final Presentation F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less
- Title
- Innovating Process Improvements in Manufacturing Operations (Semester Unknown) IPRO 304: Innovating Process Improvements in Manufacturing Operations IPRO 304 Abstract F08
- Creator
- Akram, Asad, Bhatti, Talha, Hernandez, Yvonne, Kaneria, Satyam, Kerstens, Wesley, Khaliqdina, Shahmeer, Lu, Zhenlin, Quach, Vien, Siu, Philip, Teves, Jan, Thomas, Seth, Zheng, Min
- Date
- 2008, 2008-12
- Description
-
The purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine...
Show moreThe purpose of this IPRO is to develop a robust, working prototype that can automatically monitor and detect a problem with a milling machine at A. FInkl & Sons Co. This IPRO is in its fourth semester and there are two challenges remaining: (1) alerting management to the detection of broken teeth during machining; and (2) developing spatial representations of items undergoing heat treatment. However, A. Finkl & Sons has asked us to concentrate solely on the goal of finding a way to detect when a break occurs in one of the milling teeth and then alert the mechanic monitoring the machine in order to replace it. This system will involve measuring vibrations using an accelerometer or by the use of laser detection. The goal of this IPRO is to research, test, and inform A. FInkl & Sons of the best solution to invest in, therefore they can decide what is better for their company.
Sponsorship: A. Finkl & Sons Co
Deliverables
Show less