Search results
(1 - 10 of 10)
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 Poster F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 Midterm Report F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 IPRO Day Presentation F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 Final Report F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 Project Plan F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Technical and Market Integration of Wind Energy (semester?), IPRO 344: Wind Farm IPRO 344 Abstract F06
- Creator
- Cho, Luke, Choi, Euddum, Dantapalli, Sushma, Duggirala, Sandhya, Kayvani, Bahram, Lotfjou, Azim, Song, Sung, Taulbee, Dan, Urbina, Michael, Yoo, Jieum
- Date
- 2006-12, 2006-12
- Description
-
The objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an...
Show moreThe objective of IPRO-344 is the design of a wind turbine. To accomplish this, the following tasks must be completed: Selection of an appropriate site, taking into account wind availability, proximity to transmission lines, environmental impact, and the selling price of electricity at the location. Mechanical design of the wind turbine, including the blades, turbine, and tower. Electrical design of the generator, grid interconnection, and control system. A study of the economics of the design, including a life-cycle cost analysis.
Sponsorship: Michael Polsky, Invenergy LLC
Deliverables for IPRO 344: Technical and Market Integration of Wind Energy for the Fall 2006 semester
Show less
- Title
- Solar/Wind Hydrogen Fueling Station at IIT (semester?), IPRO 304B: Solar Wind Hydrogen Fueling Station IPRO 304B Poster Sp05
- Creator
- Arora, Niyanta, Bartman, Alex, Condei, Michael, Derrick, George, Diao, Abdoulaye, Gottardo, Joseph, Hardin, Kendra, Hubjer, Alija, Isoda, Matthew, Kalynchuk, Aydra, Kolev, Dimitre, Mancina, Adam, Mcdowell, Amy, Mohammad, Mahdi, Qureshi, Bilques, Sierka, Wojciech, Stauber, Douglas, Vargas, Edwin, Witkowski, Mark
- Date
- 2005-05, 2005-05
- Description
-
The objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway....
Show moreThe objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway. Based on past recommendations a project site will be selected for the fuelling station. This site will also include a wind turbine and solar panel array to capture renewable energy. The principles of process design will be used to layout hydrogen production, storage, and implementation of renewable energy technologies. The stations will meet all local codes for hydrogen storage, production, and usage. This station will be designed in conjunction with the House of the Future, which is part of IIT’s Sustainable Village.
Deliverables for IPRO 304B: Solar/Wind Hydrogen Fueling Station at IIT for the Spring 2005 semester
Show less
- Title
- Solar/Wind Hydrogen Fueling Station at IIT (semester?), IPRO 304B: Solar Wind Hydrogen Fueling Station IPRO 304B Project Plan Sp05
- Creator
- Arora, Niyanta, Bartman, Alex, Condei, Michael, Derrick, George, Diao, Abdoulaye, Gottardo, Joseph, Hardin, Kendra, Hubjer, Alija, Isoda, Matthew, Kalynchuk, Aydra, Kolev, Dimitre, Mancina, Adam, Mcdowell, Amy, Mohammad, Mahdi, Qureshi, Bilques, Sierka, Wojciech, Stauber, Douglas, Vargas, Edwin, Witkowski, Mark
- Date
- 2005-05, 2005-05
- Description
-
The objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway....
Show moreThe objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway. Based on past recommendations a project site will be selected for the fuelling station. This site will also include a wind turbine and solar panel array to capture renewable energy. The principles of process design will be used to layout hydrogen production, storage, and implementation of renewable energy technologies. The stations will meet all local codes for hydrogen storage, production, and usage. This station will be designed in conjunction with the House of the Future, which is part of IIT’s Sustainable Village.
Deliverables for IPRO 304B: Solar/Wind Hydrogen Fueling Station at IIT for the Spring 2005 semester
Show less
- Title
- Solar/Wind Hydrogen Fueling Station at IIT (semester?), IPRO 304B
- Creator
- Arora, Niyanta, Bartman, Alex, Condei, Michael, Derrick, George, Diao, Abdoulaye, Gottardo, Joseph, Hardin, Kendra, Hubjer, Alija, Isoda, Matthew, Kalynchuk, Aydra, Kolev, Dimitre, Mancina, Adam, Mcdowell, Amy, Mohammad, Mahdi, Qureshi, Bilques, Sierka, Wojciech, Stauber, Douglas, Vargas, Edwin, Witkowski, Mark
- Date
- 2005-05, 2005-05
- Description
-
The objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway....
Show moreThe objective of this project is to design a renewably powered hydrogen fuelling station at IIT to be part of the Illinois Hydrogen Highway. Based on past recommendations a project site will be selected for the fuelling station. This site will also include a wind turbine and solar panel array to capture renewable energy. The principles of process design will be used to layout hydrogen production, storage, and implementation of renewable energy technologies. The stations will meet all local codes for hydrogen storage, production, and usage. This station will be designed in conjunction with the House of the Future, which is part of IIT’s Sustainable Village.
Deliverables for IPRO 304B: Solar/Wind Hydrogen Fueling Station at IIT for the Spring 2005 semester
Show less