Search results
(1 - 19 of 19)
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346Brochure2Sp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348FinalPresentationSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346MidTermPresentationSp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346Poster1Sp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346ProjectPlanSp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Piston and Piston Pin Manufacturing Process Improvement (Semester Unknown) IPRO 339: Piston%26PistonPinManufacturingProcessImprovementIPRO339FinalReportSp11_redacted
- Creator
- Akhambay, Assyl, Barrera, Edilberto, Binder, Dylan, Douh, Wahib, Seon Heo, Yun, King, Terrance, Ko, Hyunseok, Kolesnikov, Andrey, Simen, Sandrine, Perle, Collin, Truong, Guy, Ustupski, Krystian
- Date
- 2011, 2011-05
- Description
-
The team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been...
Show moreThe team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been affecting the company for many years. Burgess-Norton Manufacturing Company is the world’s largest manufacturer of piston pins, as well as the leading producer of powder metal parts. Supplying many major car companies across the world, Burgess-Norton thrives on maintaining a high standard of quality in both their products and services. Recently there has been a change in the automobile industry that has affected the way piston pins are manufactured. These changes have brought on difficulties for the company as they must now change their product specs and adapt to the evolving market. Their main problem is the existence of nicks on the piston pins. The main goal of this IPRO team is to find a way to eliminate these nicks that occur throughout the company’s manufacturing process. This document will outline the main objectives and tasks that the team has been assigned with. Team structures, time lines and other plans are included. Also, a further company history and description of Burgess-Norton will be provided in order to make the objectives more clear.
Sponsorship: Burgess-Norton Manufacturing Company
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348ProjectPlanSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348MidTermPresentationSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Piston and Piston Pin Manufacturing Process Improvement (Semester Unknown) IPRO 339
- Creator
- Akhambay, Assyl, Barrera, Edilberto, Binder, Dylan, Douh, Wahib, Seon Heo, Yun, King, Terrance, Ko, Hyunseok, Kolesnikov, Andrey, Simen, Sandrine, Perle, Collin, Truong, Guy, Ustupski, Krystian
- Date
- 2011, 2011-05
- Description
-
The team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been...
Show moreThe team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been affecting the company for many years. Burgess-Norton Manufacturing Company is the world’s largest manufacturer of piston pins, as well as the leading producer of powder metal parts. Supplying many major car companies across the world, Burgess-Norton thrives on maintaining a high standard of quality in both their products and services. Recently there has been a change in the automobile industry that has affected the way piston pins are manufactured. These changes have brought on difficulties for the company as they must now change their product specs and adapt to the evolving market. Their main problem is the existence of nicks on the piston pins. The main goal of this IPRO team is to find a way to eliminate these nicks that occur throughout the company’s manufacturing process. This document will outline the main objectives and tasks that the team has been assigned with. Team structures, time lines and other plans are included. Also, a further company history and description of Burgess-Norton will be provided in order to make the objectives more clear.
Sponsorship: Burgess-Norton Manufacturing Company
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346BrochureSp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346FinalPresentationSp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348EthicsSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Piston and Piston Pin Manufacturing Process Improvement (Semester Unknown) IPRO 339: Piston%26PistonPinManufacturingProcessImprovementIPRO339ProjectPlanSp11_redacted
- Creator
- Akhambay, Assyl, Barrera, Edilberto, Binder, Dylan, Douh, Wahib, Seon Heo, Yun, King, Terrance, Ko, Hyunseok, Kolesnikov, Andrey, Simen, Sandrine, Perle, Collin, Truong, Guy, Ustupski, Krystian
- Date
- 2011, 2011-05
- Description
-
The team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been...
Show moreThe team of IPRO 339’s main objective is to assist Burgess-Norton Manufacturing Company with eliminating a persisting problem that has been affecting the company for many years. Burgess-Norton Manufacturing Company is the world’s largest manufacturer of piston pins, as well as the leading producer of powder metal parts. Supplying many major car companies across the world, Burgess-Norton thrives on maintaining a high standard of quality in both their products and services. Recently there has been a change in the automobile industry that has affected the way piston pins are manufactured. These changes have brought on difficulties for the company as they must now change their product specs and adapt to the evolving market. Their main problem is the existence of nicks on the piston pins. The main goal of this IPRO team is to find a way to eliminate these nicks that occur throughout the company’s manufacturing process. This document will outline the main objectives and tasks that the team has been assigned with. Team structures, time lines and other plans are included. Also, a further company history and description of Burgess-Norton will be provided in order to make the objectives more clear.
Sponsorship: Burgess-Norton Manufacturing Company
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348BrochureSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Operation Marketing Gurus (Semester Unknown) IPRO 346: OperationMarketingGurusIPRO346FinalReportSp09
- Creator
- Coughlin, Dan, Hamann, Eric, Hasan, Hasan, Lipman, Tim, Milkic, Jelena, Park, Jay, Phillips, Zack, Tishler, Michael, Wilke, Kara
- Date
- 2009, 2009-05
- Description
-
The goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives...
Show moreThe goal of Operation Marketing Gurus is to expand the customer base of Daco, Inc. We plan to achieve this through several objectives including: Seeking new customers for existing Daco products Researching new products desired by current Daco customers Designing and marketing new products to Daco customers
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348PosterSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less
- Title
- Design a System to Recycle Condensate from Residential Air Conditioners (Semester Unknown) IPRO 348: DesignASystemToRecycleCondensateFromResidentialAirConditionersIPRO348FinalReportSu09
- Creator
- Abro, Anam, Ahmed, Syeda, Claxton, Matt, Hazariwala, Niravkumar, Hesser, Cari, Ismail, Malisa, Martinez, Jessica, Raghuvanshi, Siddhartha, Ruszczak, Erich, Specht, Nicole, Yanover, Rachel
- Date
- 2009, 2009-07
- Description
-
The goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle...
Show moreThe goal of IPRO 348 is to first find a use for the condensate produced by air conditioners, and then to create a product that will recycle the condensate for said use. The first task for IPRO 348 is to collect information on how condensate is formed, its purity, and the amount that is produced by a central air conditioning system. The end goal of the IPRO is to have a marketable system that will collect and store the condensate produced by the air conditioning units and will then proceed to use the condensate in the form of cleaning water, irrigation water, and possibly various plumbing purposes such as flushing toilets. After creating a viable product, the IPRO team is determined to make the product scalable, expanding its market from residential to commercial industries. To fulfill this goal, the IPRO team has been broken down into subgroups which are each responsible for a different objective. The first subgroup is responsible for the creation of a device that will allow for the condensate to be collected and stored. The second subgroup is responsible for analyzing the collected sample’s composition and checking for bacterial growth. The third subgroup is responsible for setting the parameters and methods for condensate collection. The fourth subgroup is responsible for obtaining the condensate samples from various sites, as well as collecting environmental data. The fifth subgroup is responsible for beginning the marketing aspects of the project. As a whole, the IPRO team will determine how the project should progress.
Deliverables
Show less