Search results
(1 - 20 of 42)
Pages
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Final Report F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Project Plan F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Poster Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Project Plan Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 IPRO Day Presentation Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Poster F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302: ZeroLiquidDischargeIPRO302FinalPresentationSp09
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Final Presentation F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Final Report Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- Intra-Plant Communication regarding Equipment Maintenance and Alerts (semester?), IPRO 303: Intra-Plant Communication IPRO 303 Abstract Sp07
- Creator
- Omair Rehman, Mohammed, Palikevicius, Sarunas, Lyles, Kevin, Lee, Chihwan, Hwang, Taeho, Amber, Jamie, Choi, Migun, Featherstone, Amanda, Hatch, Michael, Tung, Kevin, Rhoda, John
- Date
- 2007-05, 2007-05
- Description
-
IPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal©...
Show moreIPRO 303 begins its first semester as a project designed to enhance the operations of both coal-burning power plants and the Smart Signal© Corporation. When critical equipment fails, it sends a shockwave throughout an organization and into its supply chain. Smart Signal’s EPI*Center software solution enables companies to fill the equipment performance gap between current operations and corporate objectives through early, actionable warning of any abnormal performance.
Sponsorship: SmartSignal
Deliverables for IPRO 303: Intra-Plant Communication regarding Equipment Maintenance and Alerts for the Spring 2007 semester
Show less
- Title
- CO2 Mitigation: A Techno-Economic Assessment (semester?), IPRO 302: CO2 Mitigation IPRO 302 Brochure F07
- Creator
- Mustafa, Asma, Enverga, John, Godfrey, Jarrod, Kloppenborg, Ellen, Kolodziej, Martin, Lee, Da Hye, Park, Miri, Robinson, Vernell, Vrana, George
- Date
- 2007-12, 2007-12
- Description
-
The objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation...
Show moreThe objective of this IPRO is to research and compile information on potential future CO2 environmental regulations, current CO2 mitigation technology, and CO2 sequestration techniques. In addition to this, research will be conducted to find the chemical processes associated with each technology. The results will include an analysis of the items listed above as well as a high-level technical and economic comparison of the CO2 mitigation technologies.
Sponsorship: Sargent & Lundy
Deliverables for IPRO 302: CO2 Mitigation: A Techno-Economic Assessment for the Fall 2007 semester
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303: Info Design for Plant Mngt to Predict Eqpt Failure IPRO 303 Final Report F07
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302: ZeroLiquidDischargeIPRO302ProjectPlanSp09
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Analysis of Water Recovery from Power Plants for Recycling (Semester Unknown) IPRO 302: Analysis of Water Recovery from Power Plants for Recycling IPRO 302 Brochure F08
- Creator
- Sajid, Dornbusch, Donald, Hubbard, Mclain, Ali Khan, Sajid, Kolbasov, Alexander, Malon, David, Kit Ong, Wai, Reinhardt, Jesse, Kuhan Sivanyanam Pillai, Sithhambara, Hann Tan, Kwong
- Date
- 2008, 2008-12
- Description
-
Potential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states...
Show morePotential power plant sites can become more difficult to determine if water is not available in great quantity. This is true in western states where it may be scarce and competed for by other industries as well as households. The aim of this project is to find an economical, as well as environmentally friendly way to recover water from the flue gas, which is produced when powder-river-basin (PRB) coal is burned in a 750 MW power plant.
Sponsorship: Sargent and Lundy
Deliverables
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302: ZeroLiquidDischargeIPRO302MidTermPresentationSp09
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302: ZeroLiquidDischargeIPRO302PosterSp09
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less
- Title
- Information Design for Plant Management to Predict Equipment Failure (semester?), IPRO 303
- Creator
- Husain, Omar, Lee, Yewon, Voukadinov, Ivan, Parikh, Harshill, Michael, Harry, Arnoux, Christian, Obichukwu, Chike, Ike, Richard, Atanassova, Tania, Reimann, Kristen, Sonoiki, Olufemi
- Date
- 2007-12, 2007-12
- Description
-
The present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances...
Show moreThe present IPRO is a continuing research based on the findings of the previous semester during which they concluded that planned maintenances in a coal fired plant are carried out by ‘Engineering Specialists’ and the ‘Operations Manager” whereas unplanned outages are taken care of by the ‘Shift Supervisor’ . These findings lead us to our primary goals, namely: • To conduct a “Day-in-the-Life” study for both the two categories of personnel described above by direct solicitation of information from plant personnel. • Develop methods to gather this information such as surveys and/or interviews. • Compile the gathered data into a comprehensive report which should benefit the sponsor in better understanding their potential users.
Deliverables for IPRO 303: Information Design for Plant Management to Predict Equipment Failure for the Fall 2007 semester
Show less
- Title
- Zero Liquid Discharge (Semester Unknown) IPRO 302: ZeroLiquidDischargeIPRO302BrochureSp09
- Creator
- Pattermann, William, Ashrafi, Sahar, Shin, Woo, Isoda, Mitchell, Hill, Ross, Latour, Catherine, Ballard, Ray, Ng, Angela, Lai, James, Ong, Alex, Beissinger, Danny
- Date
- 2009, 2009-05
- Description
-
The objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW...
Show moreThe objective of this project is to identify, evaluate, and prioritize technologies that can be used to achieve zero discharge in a 500 MW power plant using Powder River Basin coal. To accomplish this mission, we will: 1. Determine the water balance around a typical facility 2. Perform a qualitative assessment of the viability of the three technologies above toward meeting zero discharge. 3. Determine the size, first cost and operating cost for each combination of zero discharge unit operations considered 4. Identify creative options for reusing treated discharge water within the plant 5. Identify emerging technologies that might play a major role in the future.
Sponsorship: Sargent & Lundy
Deliverables
Show less