Search results
(1 - 20 of 27)
Pages
- Title
- New United Center Arena (semester?), IPRO 335
- Creator
- Austin, Adon, Boundaoui, Elyes, Grajewski, Jeffrey, Hallberg, Amanda, Imam, Erum, Jahnke, Nicholas, Kechagias, Kallinikos, Mcdougal, Donald, Medina, Jorge, Patel, Jinit, Pedrola, Blanca, Kazimi, Syed, Roustan, Arianna, Sanz, Dennis, Suk, Myung-eun, Tay, Cyril, Rivera, Robert
- Date
- 2006-05, 2006-05
- Description
-
This project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of...
Show moreThis project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of about 20,000 spectators and will house such sports as pro and college basketball, ice hockey, arena football, and also will be used for musical events. Assume the arena is to be located at the current location of United Center with the same amount of above ground area available for parking.
Deliverables for IPRO 335: New United Center Arena for the Spring 2006 semester
Show less
- Title
- New United Center Arena (semester?), IPRO 335: United Center Replacement IPRO 335 Final Report Sp06
- Creator
- Austin, Adon, Boundaoui, Elyes, Grajewski, Jeffrey, Hallberg, Amanda, Imam, Erum, Jahnke, Nicholas, Kechagias, Kallinikos, Mcdougal, Donald, Medina, Jorge, Patel, Jinit, Pedrola, Blanca, Kazimi, Syed, Roustan, Arianna, Sanz, Dennis, Suk, Myung-eun, Tay, Cyril, Rivera, Robert
- Date
- 2006-05, 2006-05
- Description
-
This project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of...
Show moreThis project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of about 20,000 spectators and will house such sports as pro and college basketball, ice hockey, arena football, and also will be used for musical events. Assume the arena is to be located at the current location of United Center with the same amount of above ground area available for parking.
Deliverables for IPRO 335: New United Center Arena for the Spring 2006 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 Project Plan F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 Midterm Report F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315: Large Scale Structure IPRO 315 IPRO Day Presentation F07
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- New United Center Arena (semester?), IPRO 335: United Center Replacement IPRO 335 Abstract Sp06
- Creator
- Austin, Adon, Boundaoui, Elyes, Grajewski, Jeffrey, Hallberg, Amanda, Imam, Erum, Jahnke, Nicholas, Kechagias, Kallinikos, Mcdougal, Donald, Medina, Jorge, Patel, Jinit, Pedrola, Blanca, Kazimi, Syed, Roustan, Arianna, Sanz, Dennis, Suk, Myung-eun, Tay, Cyril, Rivera, Robert
- Date
- 2006-05, 2006-05
- Description
-
This project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of...
Show moreThis project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of about 20,000 spectators and will house such sports as pro and college basketball, ice hockey, arena football, and also will be used for musical events. Assume the arena is to be located at the current location of United Center with the same amount of above ground area available for parking.
Deliverables for IPRO 335: New United Center Arena for the Spring 2006 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315: Large Scale Structure IPRO 315 Midterm Report F07
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315: Large Scale Structure IPRO 315 Postert F07
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 Poster F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- New United Center Arena (semester?), IPRO 335: United Center Replacement IPRO 335 IPRO Day Presentation Sp06
- Creator
- Austin, Adon, Boundaoui, Elyes, Grajewski, Jeffrey, Hallberg, Amanda, Imam, Erum, Jahnke, Nicholas, Kechagias, Kallinikos, Mcdougal, Donald, Medina, Jorge, Patel, Jinit, Pedrola, Blanca, Kazimi, Syed, Roustan, Arianna, Sanz, Dennis, Suk, Myung-eun, Tay, Cyril, Rivera, Robert
- Date
- 2006-05, 2006-05
- Description
-
This project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of...
Show moreThis project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of about 20,000 spectators and will house such sports as pro and college basketball, ice hockey, arena football, and also will be used for musical events. Assume the arena is to be located at the current location of United Center with the same amount of above ground area available for parking.
Deliverables for IPRO 335: New United Center Arena for the Spring 2006 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 Abstract F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315: Large Scale Structure IPRO 315 Project Plan F07
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- Large Scale Structure (semester?), IPRO 315: Large Scale Structure IPRO 315 Final Report F07
- Creator
- Beltran, Julian J., Carden, Joe, Dominikowski, Marek, Janulis, Lukas, Kapecki, John, Khudeira, Mohamad, Palladino, Nicholas, Patel, Saagar, Patel, Viral, Sawulski, Piotr, Shen, Jie-hua, Stine, Elijah, Thomas, Seth, Williams, David, Zaatar, Yousef
- Date
- 2007-12, 2007-12
- Description
-
The IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to...
Show moreThe IPRO 315 team’s objective for this semester is to design a automated car parking structure. However, the team’s main objective is to create the most cost efficient and space saving parking lot. This team will also attempt to establish a strong team-working environment based on the knowledge and capabilities of each individual given their different fields of study for the successful completion of the goals presented for the IPRO group, as well as gaining useful experience and knowledge for every member. During the fall semester, the team has set forth the following objectives: Analyze different parking methods based on different building shapes Define crucial resources used in these processes and structure them Research costs associated with this parking structure
Deliverables for IPRO 315: Large Scale Structure for the Fall 2007 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 Final Report F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- Design of the Stadium (semester?), IPRO 335: United Center Replacement IPRO 335 IPRO Day Presentation F06
- Creator
- Johnson, Drew, Clemens, Natalie, Jarog, Arkadiusz, Leingang, Sarah, Uchanski, Artur, Medina, Jorge, Ramirez, Julio, Sanchez, Gerardo, Tam, Chi Hang, Wang, Nathan, Dantapalli, Sushma, Kuyken, Scott, Campbell, Keith, Griffin, Timothy, Kennedy, Thomas, Marcus, Zander, Parikh, Harshill
- Date
- 2006-12, 2006-12
- Description
-
This semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and...
Show moreThis semester IPRO 335, Capstone Design, continues placing its efforts in designing the most innovative and creative architectural and structural design from senior undergraduate and graduate students. The same project from last semester, the New United Center, will be analyzed, explored, and redesigned in detail to meet new requirements. The primary goal in this semester long project is to implement the knowledge and new techniques learned at IIT along with the experience from individual members in order to create a unique and superior product. Most of the basic design was completed last semester; nevertheless there are many areas that must be designed or some portions that will be modified.
Deliverables for IPRO 335: Design of the Stadium for the Fall 2006 semester
Show less
- Title
- New United Center Arena (semester?), IPRO 335: United Center Replacement IPRO 335 Poster Sp06
- Creator
- Austin, Adon, Boundaoui, Elyes, Grajewski, Jeffrey, Hallberg, Amanda, Imam, Erum, Jahnke, Nicholas, Kechagias, Kallinikos, Mcdougal, Donald, Medina, Jorge, Patel, Jinit, Pedrola, Blanca, Kazimi, Syed, Roustan, Arianna, Sanz, Dennis, Suk, Myung-eun, Tay, Cyril, Rivera, Robert
- Date
- 2006-05, 2006-05
- Description
-
This project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of...
Show moreThis project involves design of a multipurpose sporting arena to be located within the city of Chicago. The arena should seat a capacity of about 20,000 spectators and will house such sports as pro and college basketball, ice hockey, arena football, and also will be used for musical events. Assume the arena is to be located at the current location of United Center with the same amount of above ground area available for parking.
Deliverables for IPRO 335: New United Center Arena for the Spring 2006 semester
Show less
- Title
- Energy Efficient Lighting Design Using LEDs and Other Technologies (semester?), IPRO 337
- Creator
- Antol, Marcin, Bowles, Patrick, Denloye, Olasoji, Emch-wei, Colin, Ericksen, Michael, Glencoe, Anthony, Hidalgo, Carolina, Hubbard, Christian, Husain, Omar, Neiswander, Brian, Ng, Hin Hei, Nguyen, Minh, Williams, Leslie Ann
- Date
- 2007-05, 2007-05
- Description
-
• Incorporation of energy efficient lighting technologies into an existing 6,000 sq ft space, thereby adding to the transformation of the...
Show more• Incorporation of energy efficient lighting technologies into an existing 6,000 sq ft space, thereby adding to the transformation of the space into a new useful zero-energy lab. • Testing and measurement of energy consuming Devices that are scaled for renewable energy systems such as photovoltaic, battery storage, and fuel cells. • Demonstration of the use of day lighting for ambient light. Demonstration of use of low energy consuming systems for task lighting and night time lighting. • Development of low energy consuming lighting systems including fixture mock ups, lamp mock ups, day lighting harvesting systems, fiber optic day light utilization systems, fixtures utilizing LED, low wattage fluorescent and direct and indirect lighting fixture design.
Deliverables for IPRO 337: Energy Efficient Lighting Design Using LEDs and Other Technologies for the Spring 2007 semester
Show less
- Title
- Architectural Capstone Design (semester?), IPRO 335: Architectural Capstone Design IPRO 335 Abstract Sp05
- Creator
- Allen, Theresa, Peck, Joel, Surface, Rachel, Smith, Ben, Schroeder, Fred, Ortiz, Pedro, Witek, Adam, Salabaj, Daniel, Dantapalli, Sushma, Fehring, Bridget, Peters, Denise, Hebel, Alex
- Date
- 2005-05, 2005-05
- Description
-
This project concerns design of a two-story building plus a basement to be constructed on a 60 feet wide by 120 feet long lot. The structure...
Show moreThis project concerns design of a two-story building plus a basement to be constructed on a 60 feet wide by 120 feet long lot. The structure is located in Carbondale, Illinois subject to moderate-high seismic activities. The structure will serve as a museum of contemporary art. Our client is especially interested in having a design that would protect museum artifacts during a potential seismic activity. The suggested method is to use a base isolation system for the building. As a minimum, the following tasks are required: overall design layout for the building, architectural design of the building, structural design of the building, electrical and lighting, plumbing, fire protection and HVAC design, and addressing any serviceability issues.
Deliverables for IPRO 335: Architectural Capstone Design for the Spring 2005 semester
Show less