Search results
(1 - 15 of 15)
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356ProjectPlanSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356Poster1Sp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356BrochureSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalReportSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356MidTermPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356Poster2Sp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 Poster Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 Project Plan Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 Final Report Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 MidTerm Presentation Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 Brochure Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less
- Title
- Design and Market Analysis of Condensate Recycling from Commercial HVAC Systems (Semester Unknown) IPRO 346: Design and Marketing Solutions For Condensate IPRO346 Final Presentation Su10
- Creator
- Chandnani, Abhishek, Lee, Jinwoo, Najarian, Christopher, Regacho, Michael, Singh, Angad, Somo, Sami, Spytek, Michael, Tam, Philip, Taneja, Aanchal, Waas, Zachary
- Date
- 2010, 2010-07
- Description
-
IPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in...
Show moreIPRO 346 is put together to work with and assist Pentair Water Company. The main task is to collect condensate from commercial HVAC systems in attempt to quantify it and test the chemical content of it. These tasks will be completed so that a feasible use or uses can be developed for the condensate water. The use or uses will be backed by not only the collected data but market and business analysis as well. The uses for the collected condensate water and the data collected will be presented in a formal technical paper. This will include detailed information about the quantity and chemical content of the condensate. The uses proposed will be based on the amount of condensate produced and what Pentair products such as pumps and filters can be used to accomplish these uses. This will ultimately determine a „green‟ solution for condensate harvesting and will incorporate Pentair‟s existing products. The project plan is a report on the current work plan and the direction in which the IPRO is headed. This is subject to change as the summer semester progresses. It also includes a brief history and background about Pentair and condensate harvesting in general. Finally it includes a team breakdown which includes more specific tasks to be accomplished as well as a Gantt chart show the key deliverables and their deadlines.
Sponsorship: Pentair
Deliverables
Show less