Search results
(1 - 15 of 15)
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Project Plan Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Final Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Poster Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Final Presentation Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 IPRO Day Presentation Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Final Report Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Ethics Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Brochure Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Project Plan Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Brochure Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Midterm Report Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Alumni Memorial Hall Renovation (Semester Unkown) IPRO 335: Alumni Memorial Hall Renovation IPRO 335 Midterm Report Sp08
- Creator
- Denney, Thomas, Ericksen, Michael, Forkan, Garret, Healy, Kieran, Hong, Ei Sheng, Kim, Yong-wan, Kirk, Justin, Ontiveros, Adrian Jesus, Rogers, Eric, Roth, Nathaniel, Sharadendu, Dipti, Sissala, Amy, Warner, Alexander, Weston, Brad
- Date
- 2008, 2008-05
- Description
-
The scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end...
Show moreThe scope of I-Pro 335 is both a conclusion to unfinished work from the previous two semesters along with new projects that will start and end this semester. Work to be concluded and closed-out from last semester: Final LEED (Leadership in Energy and Environmental Design) documentation and identification of individuals that might be part of a LEED team should the school desire to pursue that route. Final design of Americans with Disabilities Act (A.D.A.) elements including a re-design of the elevator, and approval by the client. Using the Code of Ethics written last semester as a base line, the code will be rewritten to strengthen its objective to provide guidance for the I-Pro. New projects to begin and completed this semester are: The roof re-design- Green roof options. This may also include storm water retention and grey water recycling systems, as well as any updates to the buildings primary plumbing systems. Heating, Ventilation, and Air Conditioning (HVAC) - Lab hoods, air conditioning load calculations and Hydronic Heating. Electrical systems design- Illumination calculations and design, Alarm systems, and ‘Off-heating’ load calculations from equipment to be housed in Alumni Memorial Hall (A.M.H.). Construction schedule. Cost estimate.
Deliverables
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less
- Title
- Advanced Shipping Container Transportation System Solutions (semester?), IPRO 307: Advanced Shipping Container Transport IPRO 307 Poster Sp07
- Creator
- Aguirre, Maria, Borschuk, Zachary, Grilley, Michael, Kohler, Jonathan, Patel, Axita, Roth, Nathaniel, Ruiz, Joanna, Russo, Benjamin, Sisay, Mary, Sotelo, Cesar, Truong, Josie, Zaatar, Yousef
- Date
- 2007-05, 2007-05
- Description
-
The main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary,...
Show moreThe main objective of the IPRO 307 team in the Spring 2007 semester is to completely design a modern intermodal yard for the city of Gary, Indiana. It will be capable of handling the forecasted increase in container movement over the next decade while decreasing the demand placed on existing intermodal facilities in Chicago and northwest Indiana. Several intermediate goals must be met in order to accomplish this objective, which include: Selecting the site and planning the physical layout of the Gary yard which maximizes efficiency and minimizes any negative effects on the surrounding areas, Making recommendations concerning the appropriate number, size, and type of cranes capable of handling the predicted capacity, and Developing a demonstration of software capable of tracking containers and trucks both within the yard and regionally
Deliverables for IPRO 307: Advanced Shipping Container Transportation System Solutions for the Spring 2007 semester
Show less