Search results
(1 - 20 of 23)
Pages
- Title
- Green Building Design Concept & Integration (sequence unknown), IPRO 335 - Deliverables: IPRO 335 Project Plan F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009-12
- Description
-
The scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building...
Show moreThe scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building cost estimating and professional ethics. The IPRO team will become informed about and apply principles associated with green design concepts, energy sustainability, post occupancy comfort, acoustic design issues, smart building concepts, health issues (abatement of mold- and allergy-causing agents), and safety considerations.
Deliverables for IPRO 335: Green Building Design Concept & Integration for the fall 2009 semester
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT & INTEGRATION (Semester Unknown) IPRO 335
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335Poster1F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- Green Building Design Concept & Integration (sequence unknown), IPRO 335 - Deliverables
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009-12
- Description
-
The scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building...
Show moreThe scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building cost estimating and professional ethics. The IPRO team will become informed about and apply principles associated with green design concepts, energy sustainability, post occupancy comfort, acoustic design issues, smart building concepts, health issues (abatement of mold- and allergy-causing agents), and safety considerations.
Deliverables for IPRO 335: Green Building Design Concept & Integration for the fall 2009 semester
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307FinalPresentationSp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307Poster1Sp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Green Building Design Concept & Integration (sequence unknown), IPRO 335 - Deliverables: IPRO 335 Final Report F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009-12
- Description
-
The scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building...
Show moreThe scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building cost estimating and professional ethics. The IPRO team will become informed about and apply principles associated with green design concepts, energy sustainability, post occupancy comfort, acoustic design issues, smart building concepts, health issues (abatement of mold- and allergy-causing agents), and safety considerations.
Deliverables for IPRO 335: Green Building Design Concept & Integration for the fall 2009 semester
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335FinalPresentationF09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Green Building Design Concept & Integration (sequence unknown), IPRO 335 - Deliverables: 1_IPRO 335 Midterm Presentation F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009-12
- Description
-
The scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building...
Show moreThe scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building cost estimating and professional ethics. The IPRO team will become informed about and apply principles associated with green design concepts, energy sustainability, post occupancy comfort, acoustic design issues, smart building concepts, health issues (abatement of mold- and allergy-causing agents), and safety considerations.
Deliverables for IPRO 335: Green Building Design Concept & Integration for the fall 2009 semester
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335FinalReportF09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307ProjectPlanSp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307Poster2Sp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335BrochureF09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335ProjectPlanF09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335Poster2F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307MidTermPresentationSp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less
- Title
- Green Building Design Concept & Integration (sequence unknown), IPRO 335 - Deliverables: IPRO 335 Midterm Presentation F09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009-12
- Description
-
The scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building...
Show moreThe scope of this IPRO project spans structural, architectural, foundation, HVAC, lighting and electric system designs, as well as building cost estimating and professional ethics. The IPRO team will become informed about and apply principles associated with green design concepts, energy sustainability, post occupancy comfort, acoustic design issues, smart building concepts, health issues (abatement of mold- and allergy-causing agents), and safety considerations.
Deliverables for IPRO 335: Green Building Design Concept & Integration for the fall 2009 semester
Show less
- Title
- GREEN BUILDING DESIGN CONCEPT and INTEGRATION (Semester Unknown) IPRO 335: GreenBuidingDesignConceptandIntegrationIPRO335MidTermPresentationF09
- Creator
- Avanessian, Aris, Banda, Justine, Bergerson, Joshua, Burke, Jeffrey, Christo, Robert, Dexter, Eric, Kim, Kibum, Mey, Andrew, Okunaga, Jonathan, Razeq, Ali, Schaefer, Jacqueline, Thovar Leon, Adrian, Um, Hye
- Date
- 2009, 2009-12
- Description
-
Green Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we...
Show moreGreen Building design is becoming a vast topic in today’s world. As times change, and energy sources become limited and more expensive, we need to find more ways to conserve energy. This IPRO’s main goal is to research these alternative energy sources, methods, and uses; then implement them into a feasible design of our own.
Deliverables
Show less
- Title
- Intermodal Container Transport (Semester Unknown) IPRO 307: IntermodalContainerTransportIPRO307AbstractSp09
- Creator
- Cabrera, Intermodal Container Transport, Dennis, Nicole, Jackson, Cordell, Kozys, Karolis, Montgomery, Thomas, Patel, Vaiibhav, Rathakrishnan, Malarva, Razeq, Ali, Rokita, Richard, Rueda, Jorge, Skopek, Paul, Snyder, Cody
- Date
- 2009, 2009-05
- Description
-
Chicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the...
Show moreChicago is the third largest intermodal freight hub in the world. As a result, there is need for efficient routing of trains throughout the Chicago area. One aspect of railroad transport that directly affects the overall efficiency of the rail system is how easily accessible train intermodal yards are for trucks going to and through the intermodal yards. With this in mind, the overall purpose and objective of IPRO 307 is to improve the truck flow in and around an intermodal facility at Harvey, IL which is owned by Canadian National (CN) lines. CN is one of the six major railroads that serve the Chicago area. The intermodal facility at Harvey is surrounded by a network of highways including Interstates 80, 57, 294, 94 and 65. Interstates 294 and 80 cross directly overhead of the intermodal yard. In order to make truck flow around the intermodal yard more efficient, IPRO 307 will look into the addition of ramps and frontage roads, including a ramp that would be based off of interstates 80/294. A ramp connecting the major interstate to the intermodal facility would allow for easier access to the intermodal facility by trucks, thereby bettering the efficiency of the intermodal facility as a whole.
Deliverables
Show less