Search results
(1 - 11 of 11)
- Title
- Partner Experience Management for Multioperator and Warehouse Counting Systems (semester?), IPRO 349E: Partner Exp Management for Multioperator IPRO 349 3.1 Project Plan S07
- Creator
- Lukasik, Lukasz, Mucha, Adam, Pannenko, Philip, Wong, Elizabeth
- Date
- 2007-07, 2007-07
- Description
-
Located in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of...
Show moreLocated in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of Technology counterparts, IPRO-349 is a study abroad, an internship and a partner project with students from Akademia Górniczo-Hutnicza (AGH). Rather than separating into sub teams as a normal IPRO would, IPRO 349 is broken into completely different project groups. Each group could and should be considered a separate IPRO group. This project plan is from the perspective of Group 3.1 within IPRO-349 and adapted to fit the requirements of the company Comarch. This report deals with the reasoning behind IPRO-349 Group 3.1 and explains how the problems presented will be solved. It is divided into four sections. Section 1 assists in the understanding of the project by providing a brief introduction of Comarch and the project’s background, as well as a high level list of objectives. Section 2 expands on Section 1’s objectives by going into what type of work and how Group 3.1 will need to work in order to complete the objectives. Section 2 also explains what exactly is expected to result from their work. Section 3 goes into the most detail as it deals with the more specific aspects of the project such as its budget and the task list, designating who does what. The human resource assignment of the project is then discussed in Section 4, further identifying the individuals in Group 3.1 and what special skills they contribute to the project
Sponsorship: Comarch
Deliverables for IPRO 349E: Partner Experience Management for Multioperator and Warehouse Counting Systems for the Summer 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 Project Plan F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Partner Experience Management for Multioperator and Warehouse Counting Systems (semester?), IPRO 349E: Partner Exp Management for Multioperator IPRO 349 3.1 Midterm Report S07
- Creator
- Lukasik, Lukasz, Mucha, Adam, Pannenko, Philip, Wong, Elizabeth
- Date
- 2007-07, 2007-07
- Description
-
Located in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of...
Show moreLocated in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of Technology counterparts, IPRO-349 is a study abroad, an internship and a partner project with students from Akademia Górniczo-Hutnicza (AGH). Rather than separating into sub teams as a normal IPRO would, IPRO 349 is broken into completely different project groups. Each group could and should be considered a separate IPRO group. This project plan is from the perspective of Group 3.1 within IPRO-349 and adapted to fit the requirements of the company Comarch. This report deals with the reasoning behind IPRO-349 Group 3.1 and explains how the problems presented will be solved. It is divided into four sections. Section 1 assists in the understanding of the project by providing a brief introduction of Comarch and the project’s background, as well as a high level list of objectives. Section 2 expands on Section 1’s objectives by going into what type of work and how Group 3.1 will need to work in order to complete the objectives. Section 2 also explains what exactly is expected to result from their work. Section 3 goes into the most detail as it deals with the more specific aspects of the project such as its budget and the task list, designating who does what. The human resource assignment of the project is then discussed in Section 4, further identifying the individuals in Group 3.1 and what special skills they contribute to the project
Sponsorship: Comarch
Deliverables for IPRO 349E: Partner Experience Management for Multioperator and Warehouse Counting Systems for the Summer 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 Abstract F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 Poster F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 Final Report F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Partner Experience Management for Multioperator and Warehouse Counting Systems (semester?), IPRO 349E: Partner Exp Management for Multioperator IPRO 349 3.1 Poster S07
- Creator
- Lukasik, Lukasz, Mucha, Adam, Pannenko, Philip, Wong, Elizabeth
- Date
- 2007-07, 2007-07
- Description
-
Located in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of...
Show moreLocated in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of Technology counterparts, IPRO-349 is a study abroad, an internship and a partner project with students from Akademia Górniczo-Hutnicza (AGH). Rather than separating into sub teams as a normal IPRO would, IPRO 349 is broken into completely different project groups. Each group could and should be considered a separate IPRO group. This project plan is from the perspective of Group 3.1 within IPRO-349 and adapted to fit the requirements of the company Comarch. This report deals with the reasoning behind IPRO-349 Group 3.1 and explains how the problems presented will be solved. It is divided into four sections. Section 1 assists in the understanding of the project by providing a brief introduction of Comarch and the project’s background, as well as a high level list of objectives. Section 2 expands on Section 1’s objectives by going into what type of work and how Group 3.1 will need to work in order to complete the objectives. Section 2 also explains what exactly is expected to result from their work. Section 3 goes into the most detail as it deals with the more specific aspects of the project such as its budget and the task list, designating who does what. The human resource assignment of the project is then discussed in Section 4, further identifying the individuals in Group 3.1 and what special skills they contribute to the project
Sponsorship: Comarch
Deliverables for IPRO 349E: Partner Experience Management for Multioperator and Warehouse Counting Systems for the Summer 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Partner Experience Management for Multioperator and Warehouse Counting Systems (semester?), IPRO 349E
- Creator
- Lukasik, Lukasz, Mucha, Adam, Pannenko, Philip, Wong, Elizabeth
- Date
- 2007-07, 2007-07
- Description
-
Located in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of...
Show moreLocated in Krakow, Poland, IPRO-349 is different from any other IPRO that has been implemented to date. Unlike its Illinois Institute of Technology counterparts, IPRO-349 is a study abroad, an internship and a partner project with students from Akademia Górniczo-Hutnicza (AGH). Rather than separating into sub teams as a normal IPRO would, IPRO 349 is broken into completely different project groups. Each group could and should be considered a separate IPRO group. This project plan is from the perspective of Group 3.1 within IPRO-349 and adapted to fit the requirements of the company Comarch. This report deals with the reasoning behind IPRO-349 Group 3.1 and explains how the problems presented will be solved. It is divided into four sections. Section 1 assists in the understanding of the project by providing a brief introduction of Comarch and the project’s background, as well as a high level list of objectives. Section 2 expands on Section 1’s objectives by going into what type of work and how Group 3.1 will need to work in order to complete the objectives. Section 2 also explains what exactly is expected to result from their work. Section 3 goes into the most detail as it deals with the more specific aspects of the project such as its budget and the task list, designating who does what. The human resource assignment of the project is then discussed in Section 4, further identifying the individuals in Group 3.1 and what special skills they contribute to the project
Sponsorship: Comarch
Deliverables for IPRO 349E: Partner Experience Management for Multioperator and Warehouse Counting Systems for the Summer 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 IPRO Day Presentation F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less
- Title
- Ultra-High-Speed Market Data System (semester?), IPRO 313: Ultra High Speed Market Data System IPRO 313 Midterm Report F07
- Creator
- Pannenko, Philip, Ramsamy, Devaraj, Buddell, Kenneth, Lenzen, Michael, Song, Yunseok, Kwak, Noh Hyup, Lim, Jong Min, Kim, Jongyon, Cho, Young, Jafarey, Usman, Tugade, Jesus Allan C., Yoon, Jong Su
- Date
- 2007-12, 2007-12
- Description
-
IPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance...
Show moreIPRO 313’s objective is to develop a data ticker plant for our sponsor Townsend Analytics which needs to meet or exceed certain performance requirements. The data ticker plant has to have a sustained optimal throughput of three million price quotes per second and minimize latency while maintain specific constraints. The ticker plant aggregates streaming data for numerous global financial markets and disseminates the data to thousand of users in real time. The data is used in Townsend Analytics’ RealTick® Execution Management System (EMS), its flagship institutional product for the financial services industry. Thus, timely and accurate data delivery is a critical component to Townsend’s product and competitive position. Through research and development, the group will have a concept of design, prototype development and benchmark testing. Additionally, the groundwork will be laid for future development of the ticker plant and additional trading-platform components.
Sponsorship: Townsend Analytics
Deliverables for IPRO 313: Ultra-High-Speed Market Data System for the Fall 2007 semester
Show less