- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Project PlanSp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Report Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Midterm Presenation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Poster Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Final Presentation Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Ethics Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346: BP Whiting Refinery Expansion IPRO 346 Brochure Sp08
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- BP Whiting Refinery Expansion: Developing Lake Michigan Wastewater Cleanup Options (Semester Unknown) IPRO 346
- Creator
- Ashrafi, Sahar, Ballard, Ray, Chock, Chris, Chung, Yak Yong, Fakhouri, Hana, Ferrese, Anthony, Fernando, Fernando, Haak, Laura, Hammes, Katherine, Kim, Jichul, Leasenby, Alex, Lewis, Richard, Li, Zhi, Malon, David, Michael, Henry, Park, Miri, Reimann, Kirsten, Roberts, Ben, Song, Jong Mu, Taracena, Willy, Truong, Josie, Ucci, Russel, Vassi, Anna, Walter, Michael, Witek, Andrew, Yoo, Jaewon, Zhao, Yin
- Date
- 2008, 2008-05
- Description
-
IPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN....
Show moreIPRO346 will focus on familiarizing itself with British Petroleum’s (BP) wastewater treatment plant (WTP) for its oil refinery in Whiting, IN. Specifically, this IPRO will analyze the current permits and their stipulations regarding the amount of ammonia and total suspended solids (TSS) in the wastewater being dumped in Lake Michigan. Ultimately, possible methods and designs will be devised to reduce the levels of ammonia and TSS remaining in treated wastewater. These designs will take the form of a process flow sheet with a computer simulation to model the designs. At the culmination of this IPRO we will have several different models for possible upgrades to the Whiting refinery wastewater treatment plant to reduce the levels of ammonia and TSS in the wastewater entering Lake Michigan as well as a cost to implement each solution.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 Poster2 F08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 Project Plan F08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 EthicsF08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 MidTerm Presentation F08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 Poster1 F08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less
- Title
- Apple a Day Chicago (Semester Unknown) IPRO 359: Apple A Day Chicago IPRO 359 Abstract F08
- Creator
- Alexander, Richard, Cartabiano, Vinnie, Gosalia, Nehal, Haak, Laura, Hajakian, Melene, Hernandez, Leonel, Thomas, David, Grabowski, Natalie
- Date
- 2008, 2008-12
- Description
-
Developing a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer...
Show moreDeveloping a website that will be capable of carrying out customer orders. Conducting market research to help determine the ideal customer for the service that our business provides. Designing a complete business. This involves mapping out the sourcing and distribution of products, determining an efficient supply chain, promoting and marketing the business so that people are aware that Apple-A-Day Chicago exists, determining the staffing requirements of the business, as well as analyzing what the projected costs and profits of the company will be. Providing proof of concept of the operation of the business so that there is concrete evidence that Apple-A-Day Chicago is a viable solution to providing individuals with a convenient and healthy snack.
Deliverables
Show less