Search results
(1 - 15 of 15)
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356ProjectPlanSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335PosterF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356Poster1Sp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335FinalPresentationF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335FinalReportF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356BrochureSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335ProjectPlanF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalReportSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356MidTermPresentationSp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335MidTermPresentationF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Developing Technology to Transform Education in Haiti (Semester Unknown) IPRO 335: OneLaptopPerChild-HaitiPRO335BrochureF10
- Creator
- Brummer, Stephanie, Crane, Zach, Ernst, Jacob, Fujiwara, Bryan, Guan, Sarah, Harpstead, Erik, Heilig, Annika, Mendimenos, Anastasia, Mcgrath, Alexander
- Date
- 2010, 2010-12
- Description
-
To enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding...
Show moreTo enable and empower Haitian children’s education through the use of sustainable energy and collaborative technology, as well as expanding our practical and professional experience through obtaining funding and grants. To create a reproducible model, intended to be applied to other similar projects around the world.
Deliverables
Show less
- Title
- Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356Poster2Sp10
- Creator
- Alarcon, Alexander, Alvord, Steve, Belanger, David, Brazzale, Ross, Cho, Andrew, Coad, Matthew, Fanizza, Francesco, Fujiwara, Bryan, Hold, Melissa, Mosey, Grant, Nelson, Karen, Nielsen, Lisa, Nilforooshan, Razieh, Olechno, Patrick, Pattermann, William, Waas, Zachary, Wedster, Bonnie
- Date
- 2010, 2010-05
- Description
-
The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for...
Show moreThe main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.
Deliverables
Show less