Search results
(1 - 15 of 15)
- Title
- Chicago Intermodal Commuter Transit Development: Strailman_Chris_MastersProject_2011
- Creator
- Strailman, Chris
- Date
- 4/27/2011, 2011-05
- Description
-
This project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city...
Show moreThis project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city wide transit systems, it narrows down to a specific node and deals with the design and planning of a transit oriented development.
Show less
- Title
- the evolution of the south fork turning basin: Grilli_Preliminary_Research
- Creator
- Grilli, Graham
- Date
- 5/4/2011, 2011-05
- Description
-
a historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with...
Show morea historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with modular housing and adaptive reuse solutions. prototype for other potential developments along river's edge leading to healthier Great Lakes basin.
Show less
- Title
- Museum of Architecture and Design
- Creator
- Chalermrak, Tearana
- Date
- 2010-05-01, 2010-05-01
- Description
-
This project is about creating a recreation and education center dedicated to the architectural attributes of Chicago. Redevelopment of the...
Show moreThis project is about creating a recreation and education center dedicated to the architectural attributes of Chicago. Redevelopment of the Chicago Architecture Foundation is explored through the integration of local museums in order to enhance the knowledge of architecture and design for residents and visitors.
Show less
- Title
- the evolution of the south fork turning basin: Grilli_Board_Map
- Creator
- Grilli, Graham
- Date
- 5/4/2011, 2011-05
- Description
-
a historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with...
Show morea historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with modular housing and adaptive reuse solutions. prototype for other potential developments along river's edge leading to healthier Great Lakes basin.
Show less
- Title
- Chicago Intermodal Commuter Transit Development: Poster_2_Final
- Creator
- Strailman, Chris
- Date
- 4/27/2011, 2011-05
- Description
-
This project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city...
Show moreThis project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city wide transit systems, it narrows down to a specific node and deals with the design and planning of a transit oriented development.
Show less
- Title
- Exchange: Reinvisioning Infrastructure in the Union Stockyards
- Creator
- Miskowiec, Jason
- Date
- 2012-05-01, 2012-05
- Description
-
The Exchange Project proposes the physical framework to enable a transformation of existing industrial related infrastructure, a different way...
Show moreThe Exchange Project proposes the physical framework to enable a transformation of existing industrial related infrastructure, a different way to understand the city and the way we live in it at the pedestrian level. The project primarily is a connective element to unite surrounding communities as well as the conversion of an unused building. Physically, the proposition of the connective element manifests itself as an eco-boulevard, looking at a new interaction between surrounding community and a mostly absent natural environment. This begins by rethinking surface and its uses including green spaces, parks, farming, gardening, playgrounds and open space primarily used for industry.
Show less
- Title
- Chicago Intermodal Commuter Transit Development
- Creator
- Strailman, Chris
- Date
- 4/27/2011, 2011-05
- Description
-
This project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city...
Show moreThis project focuses on the connectivity of different forms of transit and different neighborhoods in Chicago. Starting at the scale of city wide transit systems, it narrows down to a specific node and deals with the design and planning of a transit oriented development.
Show less
- Title
- The Collegiate Strip: An Urban Renewal of Main Street: Wade-FinalGraphicArgument
- Creator
- Wade, Jessica
- Date
- 2012-04-30, 2012
- Description
-
This project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed...
Show moreThis project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed site located at the intersection of Jewett Avenue and Main Street provided a new 'Arts Node' where students could live, perform, and practice their given talents. This site also provided a connection to the existing Tri-Main Center which allows public display space for artistic individuals. An infrastructural addition over the existing railway system provided additional outdoor space labeled a 'social alley' that connected Main Street and Jewett Avenue and provided more creative space between the Tri-Main Center and the new Arts Node.
Show less
- Title
- The Collegiate Strip: An Urban Renewal of Main Street
- Creator
- Wade, Jessica
- Date
- 2012-04-30, 2012
- Description
-
This project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed...
Show moreThis project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed site located at the intersection of Jewett Avenue and Main Street provided a new 'Arts Node' where students could live, perform, and practice their given talents. This site also provided a connection to the existing Tri-Main Center which allows public display space for artistic individuals. An infrastructural addition over the existing railway system provided additional outdoor space labeled a 'social alley' that connected Main Street and Jewett Avenue and provided more creative space between the Tri-Main Center and the new Arts Node.
Show less
- Title
- Charleston
- Creator
- Miller, Jason
- Date
- 2010-05-01, 2010-05-01
- Title
- The Collegiate Strip: An Urban Renewal of Main Street: FinalBoard2
- Creator
- Wade, Jessica
- Date
- 2012-04-30, 2012
- Description
-
This project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed...
Show moreThis project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed site located at the intersection of Jewett Avenue and Main Street provided a new 'Arts Node' where students could live, perform, and practice their given talents. This site also provided a connection to the existing Tri-Main Center which allows public display space for artistic individuals. An infrastructural addition over the existing railway system provided additional outdoor space labeled a 'social alley' that connected Main Street and Jewett Avenue and provided more creative space between the Tri-Main Center and the new Arts Node.
Show less
- Title
- the evolution of the south fork turning basin
- Creator
- Grilli, Graham
- Date
- 5/4/2011, 2011-05
- Description
-
a historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with...
Show morea historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with modular housing and adaptive reuse solutions. prototype for other potential developments along river's edge leading to healthier Great Lakes basin.
Show less
- Title
- The Collegiate Strip: An Urban Renewal of Main Street: FinalBoard1
- Creator
- Wade, Jessica
- Date
- 2012-04-30, 2012
- Description
-
This project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed...
Show moreThis project was a look at redeveloping Main Street in Buffalo,New York to become a new Collegiate Strip for College students. The detailed site located at the intersection of Jewett Avenue and Main Street provided a new 'Arts Node' where students could live, perform, and practice their given talents. This site also provided a connection to the existing Tri-Main Center which allows public display space for artistic individuals. An infrastructural addition over the existing railway system provided additional outdoor space labeled a 'social alley' that connected Main Street and Jewett Avenue and provided more creative space between the Tri-Main Center and the new Arts Node.
Show less
- Title
- the evolution of the south fork turning basin: Grilli_Evolution
- Creator
- Grilli, Graham
- Date
- 5/4/2011, 2011-05
- Description
-
a historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with...
Show morea historical analysis of the South Fork Turning basin from 1833-2040 including proposals for future timeline. wetland remediation coupled with modular housing and adaptive reuse solutions. prototype for other potential developments along river's edge leading to healthier Great Lakes basin.
Show less
- Title
- New Urban Living in a Closed City
- Creator
- Witzman, Brad
- Date
- 2010-05-01, 2010-05-01
- Description
-
This project is investigating the change in urban dwelling typologies when an impassable perimeter is placed around a city for future social...
Show moreThis project is investigating the change in urban dwelling typologies when an impassable perimeter is placed around a city for future social and environmental reasons. I will work in two phases first establishing how the city might change and then designing a living unit which addresses the needs of those transplanted and fits into this new closed city.
Show less