STAT Analysis received 5 samples for the referenced project on 2/20/2017 10:44:00 AM. The analytical results are presented in the following... Show moreSTAT Analysis received 5 samples for the referenced project on 2/20/2017 10:44:00 AM. The analytical results are presented in the following report. Show less
Scope of Work: The scope of work associated with this work is: Isolate the contaminated drywall, place a negative air unit in work area and... Show moreScope of Work: The scope of work associated with this work is: Isolate the contaminated drywall, place a negative air unit in work area and exhaust to outside. In small pieces remove drywall, bag seal and transport to out of building in sealed manner. Clean remaining drywall and studs with fungicide, and paint with encapsulating fungicide paint. Any remaining non-contaminated building materials will remain. These items will be cleaned and treated with an approved biocide. When these materials are dry a sealant/encaplsulant will be applied to the material, if warranted. Wet wipe entire enclosure for inspection. Remove plastic barriers and replace any item moved for work. Housekeep area as leaving. Lock all doors and secure room(s). Show less