In addition to a process design topic which will be the focus of each of the six teams, the students joining this IPRO 304 will be responsible... Show moreIn addition to a process design topic which will be the focus of each of the six teams, the students joining this IPRO 304 will be responsible for identifying, investigating, analyzing and addressing therange of complex issues associated with the process design topics, including: economic analysis, regulatory and other legal considerations, community and other social factors, safety/reliability/security, materials selection for piping and control systems, plant layout and other facility operations and maintenance constraints, etc. Sponsorship: IIT Interprofessional Collaboratory Project plan for IPRO 304 E: Optimum Design of a Solar Desalination Process for the Spring 2002 semester Show less