Project Management Strategies and Technology Efficiency for Electrical Contractors' Construction Projects (Semester Unknown) IPRO 338: BIMIPRO338Poster2Sp10
creator
Anderson, Scott
creator
Babnigg, David
creator
Cachero, Eunice
creator
Carroll, John
creator
Jun, Chang Han
creator
Khaleq, Fade
creator
Kim, Suk Won
creator
Kim, Tae-hoon
creator
Lee, Se Won
creator
Maloney, Michael
creator
Park, Lillian
creator
Rizvi, Syeda Fatima
creator
Son, Min-jeong
creator
Yi, Jennifer
Continuing from last semester, our purpose is to identify ways to improve the efficiency of electrical contracting projects through new software and technology, communications, and project management techniques, especially through Building Information Modeling (BIM) utilization. Since BIM is a fairly new product with few, if any, competitors, we don’t see many options for the immediate future, when it comes to IPRO projects.
Submitted by Vishal Patel (vpatel87@iit.edu) on 2011-01-14T22:24:20Z No. of bitstreams: 4 BIMIPRO338ProjectPlanSp10.pdf: 750807 bytes, checksum: 9a9163e9314e442693d0820707ec58b1 (MD5) BIMIPRO338Poster2Sp10.pdf: 18219000 bytes, checksum: f1b9b725c95ea6c1916d9ceba507ca2c (MD5) BIMIPRO338Poster1Sp10.pdf: 10217034 bytes, checksum: 37eca036abbcf067575094d53bb292b2 (MD5) BIMIPRO338FinalPresentationSp10.pdf: 1204844 bytes, checksum: c93b5d6d513b86defe11a8737684dc26 (MD5)
Approved for entry into archive by Charles Uth(uth@iit.edu) on 2011-01-18T14:29:47Z (GMT) No. of bitstreams: 4 BIMIPRO338ProjectPlanSp10.pdf: 750807 bytes, checksum: 9a9163e9314e442693d0820707ec58b1 (MD5) BIMIPRO338Poster2Sp10.pdf: 18219000 bytes, checksum: f1b9b725c95ea6c1916d9ceba507ca2c (MD5) BIMIPRO338Poster1Sp10.pdf: 10217034 bytes, checksum: 37eca036abbcf067575094d53bb292b2 (MD5) BIMIPRO338FinalPresentationSp10.pdf: 1204844 bytes, checksum: c93b5d6d513b86defe11a8737684dc26 (MD5)
Made available in DSpace on 2011-01-18T14:29:47Z (GMT). No. of bitstreams: 4 BIMIPRO338ProjectPlanSp10.pdf: 750807 bytes, checksum: 9a9163e9314e442693d0820707ec58b1 (MD5) BIMIPRO338Poster2Sp10.pdf: 18219000 bytes, checksum: f1b9b725c95ea6c1916d9ceba507ca2c (MD5) BIMIPRO338Poster1Sp10.pdf: 10217034 bytes, checksum: 37eca036abbcf067575094d53bb292b2 (MD5) BIMIPRO338FinalPresentationSp10.pdf: 1204844 bytes, checksum: c93b5d6d513b86defe11a8737684dc26 (MD5) Previous issue date: 2010-05
Deliverables
2010
2010-05
http://hdl.handle.net/10560/1433
en
project management strategies and technology efficiency for electrical contractors' construction projects
ECA
Project deliverable
born digital
application/pdf
In Copyright
http://rightsstatements.org/page/InC/1.0/
Open Access
IPRO / Interprofessional Projects Program
Illinois Institute of Technology
Affiliated department